Water Treatment Plant Upgrades at Raystown Lake in Hesston, PA
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912DR24B0004
- Agency
-
ENDIST Baltimore
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The U.S. Army Corps of Engineers, Baltimore District is seeking a contractor to upgrade the Water Treatment Plant at Raystown Lake in Hesston, PA. The upgrades are required to improve overall plant operations and ensure compliance with Pennsylvania Department of Environmental Protection (PADEP) regulations. The project includes reconfiguring the piping of the clearwell, installing actuated valves or pump controls, modifying the water sampling location and flow measurement, replacing filter media, and upgrading the control panel, PLC, and SCADA system. Proposals are due by September 23, 2024.
Paragraph 2:
This opportunity is set aside for small businesses. The project may include options to install fiber-optic connections and required integration. The value of the contract is not specified, but the scope of work indicates a significant upgrade to the water treatment infrastructure. The project will be performed at the Raystown Lake site in Hesston, PA.
Notice text
3 versions
Update #3 · Latest ·
The Raystown Lake Project, Baltimore District, U.S. Army Corps of Engineers will contract for upgrades to the Water Treatment Plant to improve overall operations to provide public drinking water and be compliant with a design approved Pennsylvania Department of Environmental Protection (PADEP. The list below identifies the improvements to bring the plant into compliance with PADEP regulations and requirements.The project consists of but is not limited to the following:?Reconfigure the piping of the WTP clearwell?Install actuated valves or pump controls? Modify the water sampling location and add flow measurement?Modify the pressure distribution system discharge pump?Drain, inspect, and clean the clearwell?Replace filter media in both filters.?Replace the filter control panel?May include bid items to install fiber and make required connections along with afiber-optic connection?Replace PLC and install autodialer with signal callouts and VTScada software?Replacement of the clarifier / filter media, underdrains, and air scour piping in bothclarifier/filter units.
Update #2 ·
*** No amendment 0004 was issued. This is being posted to correct the response date to match amendment number 0003. No acknowledgement of Amendment 0004 is needed. The Raystown Lake Project, Baltimore District, U.S. Army Corps of Engineers will contract for upgrades to the Water Treatment Plant to improve overall operations to provide public drinking water and be compliant with a design approved Pennsylvania Department of Environmental Protection (PADEP. The list below identifies the improvements to bring the plant into compliance with PADEP regulations and requirements.The project consists of but is not limited to the following:?Reconfigure the piping of the WTP clearwell?Install actuated valves or pump controls?Modify the water sampling location and add flow measurement?Modify the pressure distribution system discharge pump?Drain, inspect, and clean the clearwell?Replace filter media in both filters.?Replace the filter control panel?May include bid items to install fiber and make required connections along with afiber-optic connection?Replace PLC and install autodialer with signal callouts and VTScada software?Replacement of the clarifier / filter media, underdrains, and air scour piping in bothclarifier/filter units.
Update #1 ·
The Raystown Lake Project, Baltimore District, U.S. Army Corps of Engineers will contract for upgrades to the Water Treatment Plant to improve overall operations to provide public drinking water and be compliant with a design approved Pennsylvania Department of Environmental Protection (PADEP. The list below identifies the improvements to bring the plant into compliance with PADEP regulations and requirements.The project consists of but is not limited to the following:?Reconfigure the piping of the WTP clearwell?Install actuated valves or pump controls?Modify the water sampling location and add flow measurement?Modify the pressure distribution system discharge pump?Drain, inspect, and clean the clearwell?Replace filter media in both filters.?Replace the filter control panel?May include bid items to install fiber and make required connections along with afiber-optic connection?Replace PLC and install autodialer with signal callouts and VTScada software?Replacement of the clarifier / filter media, underdrains, and air scour piping in bothclarifier/filter units.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Water Treatment Plant Upgrades at Raystown Lake in Hesston, PA | Award Notice | |
| Water Treatment Plant Upgrades at Raystown Lake in Hesston, PA Abstract Of Bids | Special Notice | |
| Water Treatment Plant Upgrades at Raystown Lake in Hesston, PA Abstract Of Bids | Special Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Herbicide Application Services - Raystown Lake Project | ENDIST Baltimore | Total Small Business | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside | |
| Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA | ENDIST Sacramento | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity