Dana Point West Breakwater Repair Project

Closed Solicitation Posted

Solicitation number
W912PL26BA001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Dana Point Harbor, CA 92629

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Los Angeles District, solicited bids for the Dana Point Harbor West Breakwater Repair Project through Invitation for Bids (IFB) #W912PL26BA001. The project entails complete repair of the west breakwater at Dana Point Harbor, including replacing approximately 3,500 tons of displaced armor stone and resetting existing stone to interlock with new materials. The solicitation required bidders to address mobilization and demobilization, dredging operations (approximately 45,000 cubic yards of sediment), armor stone procurement and installation across multiple repair areas, and environmental surveys, with all dredged material to be beneficially used as nearshore nourishment at Doheny State Beach. The government indicated that site visit attendance was strongly encouraged though not required. The bid opening date was originally scheduled and then extended to January 28, 2026, with amendments issued to update contract sections, establish virtual bid opening procedures, and provide wage determinations for the project.

This solicitation carried no set-aside designations and was openly competed. Three contractors submitted bids by the January 28, 2026 deadline: Curtin Maritime Corp (Long Beach, CA) submitted the lowest bid at $4,889,212.38, followed by Pacific Dredge and Construction, LLC (San Diego, CA) at $5,743,290.00, and Connolly-Pacific Co. (Long Beach, CA) at $5,864,690.00, all significantly below the Independent Government Estimate of $9,834,480.00. The work is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Z1KZ (Maintenance of Other Conservation and Development Facilities). The place of performance is located at Monarch Bay, California 92629, with the project comprising ten line items combining lump-sum and unit-price contract elements for various scope components.

Notice text

5 versions

Update #5 · Latest ·

*Update- Bid Abstract uploaded/attached* *Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

Update #4 ·

*Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

Update #3 ·

*Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

Update #2 ·

*Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

Update #1 ·

Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors