VIRGINIA Class Submarine Block VI Long Lead Time Material

Award Notice Posted

A later notice was posted: the Limited / Sole Source Justification from .

Solicitation number
N00024-24-C-2110
Agency
Awarded
to Electric Boat Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
N00024-24-C-2110 Federal contract award
NAICS code
336611 Ship Building and Repairing
Place of performance
Groton, Connecticut 06340, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Naval Sea Systems Command (NAVSEA) has awarded a $216,510,000 not-to-exceed undefinitized contract to General Dynamics Electric Boat Corp. for Long Lead Time Material associated with the VIRGINIA Class Submarines SSN 814 and SSN 815. This sole source award was made in accordance with FAR 6.302-1(a)(2)(iii) as there was only one responsible source that could satisfy the agency's requirements. The contract was awarded on October 13, 2023 and will provide long lead time material for the two specified VIRGINIA Class submarines.

Notice text

The Naval Sea Systems Command (NAVSEA) has awarded a $216,510,000 not-to-exceed undefinitized contract to General Dynamics Electric Boat Corp., 75 Eastern Point Road, Groton, CT, 06340. This will provide for Long Lead Time Material associated with the VIRGINIA Class Submarines SSN 814 and SSN 815. This contract was not competitively procured. The statutory authority for this sole source award is in accordance with FAR 6.302-1(a)(2)(iii) - Only one responsible source and no other supplies or services will satisfy agency requirements.

Awarded contract N00024-24-C-2110 to ELECTRIC BOAT CORPORATION for 216510000.00 on 2023-10-13.

Notice history

Notice Type Posted
VIRGINIA Class Submarine Block VI Long Lead Time Material Latest Limited / Sole Source Justification
This notice Award Award Notice