Vertical Transportation Equipment (VTE) Maintenance and Repair Serivces
Award Notice Posted
- Solicitation number
- W911S8-13-R-0025
- Agency
-
MICC Joint Base Lewis-McChord
Mission and Installation Contracting Command, Department of Defense
- Awarded
- to Thyssenkrupp Elevator Corporation
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911S815D0002-0006 Federal contract award
- NAICS code
- 238290 Other Building Equipment Contractors
- PSC
- Not on record
- Place of performance
- Joint Base Lewis-McChord (Jblm) Jblm, Wa Jblm Wa 98433 US
- More information
Notice details come from SAM.gov. Updated .
Notice text
Solicitation Number: W911S8-13-R-0025
Notice Type: Sources Sought
Vertical Transportation Equipment Maintenance and Repair Services at Joint Base Lewis-McChord, Washington
Thank you for taking the time to assist us in gathering this information!
Mission and Installation Contracting Command (MICC)-Joint Base Lewis-McChord (JBLM) is currently conducting market research to determine the existence of viable commercial sources capable of providing Vertical Transportation Equipment (VTE) maintenance and repair services. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and repair services to VTE at JBLM in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the excluded services listed in Performance Work Statement (PWS) paragraph 5.3). The term quote mark VTE quote mark in this PWS includes all equipment listed in Technical Exhibit 3, VTE List (e.g., freight and passenger elevators, escalators, wheelchair/stair lifts, and dumbwaiters). The contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures in the delivery of required services. The anticipated period of performance includes a base period (1 November 2014 - 30 September 2015) with the possibility of exercising 1-year options for up to 4 periods.
An important outcome of this research is the possibility of setting aside this acquisition for exclusive competitive participation within a specific Small Business Administration (SBA) program in accordance with FAR Part 19. Specific SBA programs are Historically Underutilized Business Zone (HUBZone), 8(a), Small Disadvantaged Business (SDB), Economically-Disadvantage Women-Owned Small Business (EDWOSB), Women-Owned Small Business (WOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Veteran-Owned Small Business (VOSB).
MICC-JBLM is seeking industry information and comments from sources with capabilities to perform the contract and with relevant experience. Interested parties shall complete and submit the below questionnaire to the Government. The Government advises that providing responses to the questions will not automatically include you in the acquisition process for future solicitations.
DISCLAIMER: This Sources Sought (SS) is submitted in accordance with 52.215-3, Request for Information or Solicitation for Planning Purposes (Oct 1997). This SS is for planning purposes only and is not a Request for Proposals (RFP), Invitation for Bids (IFB), or an obligation on the part of the Government to acquire any services. Responses to this SS shall not serve as proposals, bids, or offers, which may be a prelude to form a binding contract with the Federal Government. MICC-JBLM will not accept unsolicited proposals related to the subject of this SS. The responder shall clearly identify any information it considers sensitive or proprietary. The Government will handle information received in response to this SS marked quote mark Proprietary quote mark accordingly. The Government will not return responses to this SS. Responders are solely responsible for all expenses associated with and incurred by responding to this SS. The Government reserves the right to determine how it will proceed in response to information gathered from this notice.
Please submit your response no later than 12 August 2013 by 4:00:00 PM (PDT) via email (angela.s.royster2.civ@mail.mil) or facsimile (fax number 253-967-2772); if submitted via facsimile, please first send an email to Angela Royster letting her know when she should expect your facsimile. We appreciate your participation and input.
SOURCES SOUGHT QUESTIONNAIRE
Company Name:___________________________________________________________________
Point of Contract (Name & Position):__________________________________________________
Mailing Address:
__________________________________________________________________________
__________________________________________________________________________
Phone: _______________
Fax: _________________
Email: ______________________
DUNS Number: ______________________
CAGE Code: ______________________
NOTE: The Government will not publish responses outside the MICC-JBLM office; it will use information collected as a tool for the upcoming acquisition. Please submit your response no later than 12 August 2013 by 4:00:00 PM (PDT) via email (angela.s.royster2.civ@mail.mil) or facsimile (fax number 253-967-2772); if submitted via facsimile, please first send an email to Angela Royster letting her know when she should expect your facsimile.
1. Is your company registered with the System for Award Management (SAM) website (https://www.sam.gov)? [ ] yes [ ] no
2. Is your firm eligible for participation in one of the following small business programs? If so, please indicate the program.
[ ] yes [ ] no Small Business (SB)
[ ] yes [ ] no Historically Underutilized Business Zone (HUBZone)
[ ] yes [ ] no Small Business 8(a)
[ ] yes [ ] no Small Disadvantaged Business (SDB)
[ ] yes [ ] no Economically-Disadvantaged Women-Owned Small Business (EDWOSB)
[ ] yes [ ] no Women-Owned Small Business (WOSB)
[ ] yes [ ] no Service-Disabled Veteran-Owned Small Business (SDVOSB)
[ ] yes [ ] no Veteran-Owned Small Business (VOSB)
[ ] yes [ ] no Other (please specify)
3. Does your firm have experience providing all necessary services? [ ] yes [ ] no
If yes, please provide a brief description of your work experience.
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
4. Does you firm presently perform the same or similar services under a General Services Administration (GSA) contract or any active Federal enterprise contract? [ ] yes [ ] no
If yes, please provide the contract number: __________________________________________
If yes, provide a brief description of your work experience under the referenced contract.
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
5. Based on your firm's work experience, which positions do you consider key positions in the performance of this requirement? Provide position titles and responsibilities.
Position Title Position Responsibilities
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
6. How are services typically priced in this industry? How do you determine price?
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
7. Please describe how over and above work, as described in the PWS, is typically handled (e.g., CLIN structure, billing, fixed price vs. time-and-materials/labor hour).
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
8. In the industry, what kind of contract is standard for these services (e.g., fixed-price, cost-reimbursable, or time-and-materials)? Or a combination? Please explain.
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
9. If fixed-price contracts are not standard in the industry, is there a way to make this contract
fixed-price? Please explain.
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
10. What are important aspects of this requirement, as described in the draft PWS, that a contractor would need to expound upon to show that it is capable of performing the services?
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
11. From a technical standpoint, what makes one firm better able to accomplish the work than another firm?
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
12. If the Government selected your firm, how many calendar days would you need after contract award date before you would be completely setup to provide the necessary services (i.e., phase-in as per PWS paragraph 1.5.)?
[ ] Immediately [ ] 10 days [ ] 15 days [ ] 30 days [ ] Other ____________
13. Please provide comments regarding the draft PWS, and any deviation(s) from commercial practices that may be included:
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
14. Provide any additional feedback that you feel is relevant (e.g., problems or any other issues experienced with similar contracts):
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
__________________________________________________________________________
Again, we thank you for taking the time to assist us in gathering this information!
Notice history
| Notice | Type | Posted |
|---|---|---|
| Vertical Transportation Equipment Maintenance and Repair at Joint Base Lewis-McChord | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity