Vermilion Harbor West Pier Repair
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912P422B0016
- Agency
-
ENDIST Buffalo
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Vermilion, Ohio 44089, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Buffalo is seeking offers to repair the West pier structure at Vermilion Harbor in Erie County, Ohio. Approximately 150 feet of the existing laid up stone cap has shifted downslope, opening a gap in the structure and allowing loss of granular fill material. Offerors will remove settled stone, stockpile and replace to restore the pier elevation, and place new granular fill beneath. An additional 920 feet of the lake side rip rap will also receive repairs to change the stone slope ratio. Proposals are due by June 3, 2022 and the award will be made based on technical qualifications and price factors.
This is a total small business set aside designated with a NAICS code of 237990 (Other Heavy and Civil Engineering Construction). The predominate PSC code will likely be R499 (Miscellaneous repair and alteration of structures and facilities). The value is estimated between $500,000-$1,000,000 to be completed within one construction season. Repairs must be finished by October 2023 to allow vessels safe harbor for the winter season.
Notice text
Vermilion Harbor is located in Erie County, Ohio, on the south shore of Lake Erie at the mouth of the Vermilion River, about 37 miles west of Cleveland and 21 miles east of Sandusky. Vermilion Harbor is a small-craft harbor originally authorized by the River & Harbor Act and constructed in 1836 by the federal government for commercial purposes. The existing West pier structure consists of a laid up stone cap with timber crib and fill stone. Inspections performed on 20 October 2021 noted a section of approximately 150 feet where laid up stone has shifted down slope on the lake side of the pier opening a gap in the structure. This was combined with loss of granular fill material across the opened gap in the structure. The lake section of the pier is to be completed by removing all laid up stone that has begun to settle downslope to the water. This stone is to be stockpiled and replaced to restore the pier to its initial condition. New granular fill is to be placed beneath the laid up stone to reset the cap stones to their initial elevations. In addition to this repair, an approximate length of 920 ft is to see additional rip rap repairs from the beach section to the north wrap on the lake side to change the overall stone slope from 1 on 1.5 to 1 on 2.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Vermilion Harbor West Pier Repair | Award Notice | |
| Vermilion Harbor West Pier Repair | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Duluth Vessel Yard Phase III Repairs | ENDIST Detroit | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity