Venturi meter

Closed Solicitation Posted

Solicitation number
N0010424QFB94
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Navy Naval Supply Systems Command seeks a venturi meter to be manufactured in accordance with Drawing 2621-826-01. Key requirements include material certifications and traceability for items made of ASTM B369 and QQ-N-281. Welding must comply with specified standards and procedures require pre-approval. Final inspection includes material verification and traceability marking confirmation.

This opportunity is set aside for total small business. The NAICS is 334514 and PSC is 750. Drawings provide specifications for over 190 individual parts and subassemblies. Quantity is not specified but the meter is for shipboard use. Production must be completed within 365 days of award at the prime contractor's facility, subject to government quality assurance at source.

Notice text

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C|

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x||||||

GENERAL INFORMATION-FOB-DESTINATION|1|B|

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receving Report|Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESINATION & Acceptance at OTHER |TBD|N0010

4|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|NA|NA|Certifications-N39040|NA|NA|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil|

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery |||||

WARRANTY OF DATA--BASIC (MAR 2014)|2|||

NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|334514|750||||||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|

1. The resultant award of this solicitation will be issued bilaterally, requirig the contractor's written acceptance prior to execution.

2. Any contract/orer awarded as a result of this solicitation will be a "DO" rated order certifie for national defense use under the Defense Priorities and Allocations System (PAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency

reparedness, and Energy Program Use.

3. If drawings are included in the soliciation, access must be requested on the individual solicitation page on ContractOpportunities via the Government's SAM.gov website. Include your CAGE code in yur request.

4. Unless otherwise stated on the DD1423, submission of DD1423 cerification data (CDRLs) will be on or before 20 days prior to the material delivry date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt f CDRLs. Final delivery of material will

be on or before 365 days after the effctive date of the contract.

\

1. SCOPE

1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital

shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.

2. APPLICABLE DOCUMENTS

2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,

however, must supersede applicable laws and regulations unless a specific exemption has been obtained.

2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.

2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric

Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification

revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,

R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.

2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.

2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.

DRAWING DATA=2620-063X01 |96169| Z| |D|0001 | Z|49998|1188959

DRAWING DATA=2620-063X01 |96169| Z| |D|0002 | K|49998|0055092

DRAWING DATA=2620-063X01 |96169| Z| |D|0002.1 | U|49998|0051784

DRAWING DATA=2620-063X01 |96169| Z| |D|0002.2 | Z|49998|0041964

DRAWING DATA=2620-063X01 |96169| Z| |D|0003 | Z|49998|0050739

DRAWING DATA=2620-063X01 |96169| Z| |D|0003.1 | Y|49998|0061088

DRAWING DATA=2620-063X01 |96169| Z| |D|0004 | E|49998|0025743

DRAWING DATA=2620-063X01 |96169| Z| |D|0005 | V|49998|0034080

DRAWING DATA=2620-063X01 |96169| Z| |D|0006 | E|49998|0024816

DRAWING DATA=2620-063X01 |96169| Z| |D|0007 | T|49998|0023186

DRAWING DATA=2620-063X01 |96169| Z| |D|0008 | Z|49998|0031671

DRAWING DATA=2620-063X01 |96169| Z| |D|0009 | E|49998|0013277

DRAWING DATA=2620-063X01 |96169| Z| |D|0010 | G|49998|0052230

DRAWING DATA=2620-063X01 |96169| Z| |D|0011 | V|49998|0026855

DRAWING DATA=2620-063X01 |96169| Z| |D|0012 | L|49998|0019598

DRAWING DATA=2620-063X01 |96169| Z| |D|0014 | N|49998|0023569

DRAWING DATA=2620-063X01 |96169| Z| |D|0015 | N|49998|0026756

DRAWING DATA=2620-063X01 |96169| Z| |D|0016 | Y|49998|0040392

DRAWING DATA=2620-063X01 |96169| Z| |D|0017 | W|49998|0026167

DRAWING DATA=2620-063X01 |96169| Z| |D|0019 | S|49998|0043231

DRAWING DATA=2620-063X01 |96169| Z| |D|0020 | R|49998|0027157

DRAWING DATA=2621-625-03 |96169|AL| |D|0001 |AL|49998|0110011

DRAWING DATA=2621-625-03 |96169|AL| |D|0001.1.1 | R|49998|0105307

DRAWING DATA=2621-625-03 |96169|AL| |D|0002 | F|49998|0087449

DRAWING DATA=2621-625-03 |96169|AL| |D|0002.1 | N|49998|0107282

DRAWING DATA=2621-625-03 |96169|AL| |D|0002.2 | S|49998|0079553

DRAWING DATA=2621-625-03 |96169|AL| |D|0002.3 | V|49998|0078581

DRAWING DATA=2621-625-03 |96169|AL| |D|0002.4 |AC|49998|0088927

DRAWING DATA=2621-625-03 |96169|AL| |D|0002.5 |AK|49998|0088342

DRAWING DATA=2621-625-03 |96169|AL| |D|0002.6 |AL|49998|0027433

DRAWING DATA=2621-625-03 |96169|AL| |D|0003 |AL|49998|0133653

DRAWING DATA=2621-625-03 |96169|AL| |D|0003.1 |AC|49998|0102806

DRAWING DATA=2621-625-03 |96169|AL| |D|0003.2 |AH|49998|0083381

DRAWING DATA=2621-625-03 |96169|AL| |D|0003.3 |AL|49998|0062196

DRAWING DATA=2621-625-03 |96169|AL| |D|0004 | T|49998|0036989

DRAWING DATA=2621-625-03 |96169|AL| |D|0005 |AL|49998|0060702

DRAWING DATA=2621-625-03 |96169|AL| |D|0005.1 |AK|49998|0071041

DRAWING DATA=2621-625-03 |96169|AL| |D|0006 | S|49998|0041574

DRAWING DATA=2621-625-03 |96169|AL| |D|0007 | S|49998|0042477

DRAWING DATA=2621-625-03 |96169|AL| |D|0008 |AJ|49998|0040172

DRAWING DATA=2621-625-03 |96169|AL| |D|0009 | S|49998|0036836

DRAWING DATA=2621-625-03 |96169|AL| |D|0010 | S|49998|0038141

DRAWING DATA=2621-625-03 |96169|AL| |D|0011 | S|49998|0037232

DRAWING DATA=2621-625-03 |96169|AL| |D|0012 | S|49998|0040562

DRAWING DATA=2621-625-03 |96169|AL| |D|0013 | S|49998|0034249

DRAWING DATA=2621-625-03 |96169|AL| |D|0014 | S|49998|0036960

DRAWING DATA=2621-625-03 |96169|AL| |D|0015 |AC|49998|0036326

DRAWING DATA=2621-625-03 |96169|AL| |D|0016 | S|49998|0037485

DRAWING DATA=2621-625-03 |96169|AL| |D|0017 | S|49998|0080682

DRAWING DATA=2621-625-03 |96169|AL| |D|0018 | S|49998|0058706

DRAWING DATA=2621-625-03 |96169|AL| |D|0019 | S|49998|0065643

DRAWING DATA=2621-625-03 |96169|AL| |D|0020 |AC|49998|0065400

DRAWING DATA=2621-625-03 |96169|AL| |D|0021 |AC|49998|0065890

DRAWING DATA=2621-625-03 |96169|AL| |D|0022 | S|49998|0070546

DRAWING DATA=2621-625-03 |96169|AL| |D|0023 | S|49998|0077894

DRAWING DATA=2621-625-03 |96169|AL| |D|0024 |AC|49998|0061529

DRAWING DATA=2621-625-03 |96169|AL| |D|0025 | S|49998|0080991

DRAWING DATA=2621-625-03 |96169|AL| |D|0026 | S|49998|0078169

DRAWING DATA=2621-625-03 |96169|AL| |D|0027 | S|49998|0062079

DRAWING DATA=2621-625-03 |96169|AL| |D|0028 | S|49998|0063911

DRAWING DATA=2621-625-03 |96169|AL| |D|0029 | S|49998|0081357

DRAWING DATA=2621-625-03 |96169|AL| |D|0030 | S|49998|0078268

DRAWING DATA=2621-625-03 |96169|AL| |D|0031 | S|49998|0067988

DRAWING DATA=2621-625-03 |96169|AL| |D|0032 | S|49998|0052338

DRAWING DATA=2621-625-03 |96169|AL| |D|0033 | S|49998|0066347

DRAWING DATA=2621-625-03 |96169|AL| |D|0034 | S|49998|0076897

DRAWING DATA=2621-625-03 |96169|AL| |D|0035 |AC|49998|0117817

DRAWING DATA=2621-625-03 |96169|AL| |D|0036 | S|49998|0070990

DRAWING DATA=2621-625-03 |96169|AL| |D|0037 | S|49998|0075571

DRAWING DATA=2621-625-03 |96169|AL| |D|0038 | S|49998|0069120

DRAWING DATA=2621-625-03 |96169|AL| |D|0039 | S|49998|0075078

DRAWING DATA=2621-625-03 |96169|AL| |D|0040 | S|49998|0100110

DRAWING DATA=2621-625-03 |96169|AL| |D|0041 | S|49998|0097068

DRAWING DATA=2621-625-03 |96169|AL| |D|0042 | S|49998|0077580

DRAWING DATA=2621-625-03 |96169|AL| |D|0043 | S|49998|0071220

DRAWING DATA=2621-625-03 |96169|AL| |D|0044 |AC|49998|0073502

DRAWING DATA=2621-625-03 |96169|AL| |D|0045 | S|49998|0071561

DRAWING DATA=2621-625-03 |96169|AL| |D|0046 |AC|49998|0053564

DRAWING DATA=2621-625-03 |96169|AL| |D|0047 |AC|49998|0088878

DRAWING DATA=2621-625-03 |96169|AL| |D|0048 | S|49998|0080796

DRAWING DATA=2621-625-03 |96169|AL| |D|0049 | Z|49998|0106263

DRAWING DATA=2621-625-03 |96169|AL| |D|0050 | S|49998|0088279

DRAWING DATA=2621-625-03 |96169|AL| |D|0051 | S|49998|0089976

DRAWING DATA=2621-625-03 |96169|AL| |D|0052 | S|49998|0067306

DRAWING DATA=2621-625-03 |96169|AL| |D|0053 | S|49998|0065072

DRAWING DATA=2621-625-03 |96169|AL| |D|0054 | S|49998|0071895

DRAWING DATA=2621-625-03 |96169|AL| |D|0055 | L|49998|0060798

DRAWING DATA=2621-625-03 |96169|AL| |D|0056 | L|49998|0060631

DRAWING DATA=2621-625-03 |96169|AL| |D|0057 |AC|49998|0087017

DRAWING DATA=2621-625-03 |96169|AL| |D|0058 | S|49998|0079014

DRAWING DATA=2621-625-03 |96169|AL| |D|0059 | S|49998|0087182

DRAWING DATA=2621-625-03 |96169|AL| |D|0060 | S|49998|0080044

DRAWING DATA=2621-625-03 |96169|AL| |D|0061 | S|49998|0088606

DRAWING DATA=2621-625-03 |96169|AL| |D|0062 | S|49998|0082165

DRAWING DATA=2621-625-03 |96169|AL| |D|0063 | M|49998|0070993

DRAWING DATA=2621-625-03 |96169|AL| |D|0064 | M|49998|0067453

DRAWING DATA=2621-625-03 |96169|AL| |D|0065 | M|49998|0067192

DRAWING DATA=2621-625-03 |96169|AL| |D|0066 | S|49998|0070847

DRAWING DATA=2621-625-03 |96169|AL| |D|0067 | W|49998|0079068

DRAWING DATA=2621-625-03 |96169|AL| |D|0069 | S|49998|0078860

DRAWING DATA=2621-625-03 |96169|AL| |D|0070 | S|49998|0067697

DRAWING DATA=2621-625-03 |96169|AL| |D|0071 | W|49998|0075516

DRAWING DATA=2621-625-03 |96169|AL| |D|0072 | S|49998|0121919

DRAWING DATA=2621-625-03 |96169|AL| |D|0073 | N|49998|0063130

DRAWING DATA=2621-625-03 |96169|AL| |D|0074 |AC|49998|0088058

DRAWING DATA=2621-625-03 |96169|AL| |D|0075 | S|49998|0091225

DRAWING DATA=2621-625-03 |96169|AL| |D|0076 | S|49998|0084931

DRAWING DATA=2621-625-03 |96169|AL| |D|0077 | S|49998|0080448

DRAWING DATA=2621-625-03 |96169|AL| |D|0078 | S|49998|0088423

DRAWING DATA=2621-625-03 |96169|AL| |D|0079 | S|49998|0097630

DRAWING DATA=2621-625-03 |96169|AL| |D|0080 | S|49998|0102812

DRAWING DATA=2621-625-03 |96169|AL| |D|0081 | S|49998|0089089

DRAWING DATA=2621-625-03 |96169|AL| |D|0082 | S|49998|0091204

DRAWING DATA=2621-625-03 |96169|AL| |D|0083 | S|49998|0093758

DRAWING DATA=2621-625-03 |96169|AL| |D|0084 | S|49998|0074452

DRAWING DATA=2621-625-03 |96169|AL| |D|0085 | S|49998|0101412

DRAWING DATA=2621-625-03 |96169|AL| |D|0086 | S|49998|0124627

DRAWING DATA=2621-625-03 |96169|AL| |D|0087 | S|49998|0089362

DRAWING DATA=2621-625-03 |96169|AL| |D|0088 | S|49998|0125925

DRAWING DATA=2621-625-03 |96169|AL| |D|0089 | T|49998|0138119

DRAWING DATA=2621-625-03 |96169|AL| |D|0090 | S|49998|0172266

DRAWING DATA=2621-625-03 |96169|AL| |D|0091 | S|49998|0087770

DRAWING DATA=2621-625-03 |96169|AL| |D|0092 | S|49998|0082515

DRAWING DATA=2621-625-03 |96169|AL| |D|0093 | S|49998|0083019

DRAWING DATA=2621-625-03 |96169|AL| |D|0094 | S|49998|0082380

DRAWING DATA=2621-625-03 |96169|AL| |D|0095 | S|49998|0086506

DRAWING DATA=2621-625-03 |96169|AL| |D|0096 | S|49998|0125829

DRAWING DATA=2621-625-03 |96169|AL| |D|0097 | S|49998|0108393

DRAWING DATA=2621-625-03 |96169|AL| |D|0098 | T|49998|0065762

DRAWING DATA=2621-625-03 |96169|AL| |D|0100 | T|49998|0070894

DRAWING DATA=2621-625-03 |96169|AL| |D|0101 | T|49998|0071718

DRAWING DATA=2621-625-03 |96169|AL| |D|0102 | T|49998|0071097

DRAWING DATA=2621-625-03 |96169|AL| |D|0103 | T|49998|0090824

DRAWING DATA=2621-625-03 |96169|AL| |D|0104 | T|49998|0090404

DRAWING DATA=2621-625-03 |96169|AL| |D|0105 | T|49998|0076361

DRAWING DATA=2621-625-03 |96169|AL| |D|0106 | U|49998|0082997

DRAWING DATA=2621-625-03 |96169|AL| |D|0107 | U|49998|0091013

DRAWING DATA=2621-625-03 |96169|AL| |D|0108 | T|49998|0137512

DRAWING DATA=2621-625-03 |96169|AL| |D|0109 | U|49998|0086586

DRAWING DATA=2621-625-03 |96169|AL| |D|0110 | V|49998|0136029

DRAWING DATA=2621-625-03 |96169|AL| |D|0111 | V|49998|0123395

DRAWING DATA=2621-625-03 |96169|AL| |D|0112 | V|49998|0072126

DRAWING DATA=2621-625-03 |96169|AL| |D|0113 | V|49998|0071344

DRAWING DATA=2621-625-03 |96169|AL| |D|0114 | V|49998|0069795

DRAWING DATA=2621-625-03 |96169|AL| |D|0115 | V|49998|0073173

DRAWING DATA=2621-625-03 |96169|AL| |D|0117 | V|49998|0071456

DRAWING DATA=2621-625-03 |96169|AL| |D|0118 | V|49998|0077864

DRAWING DATA=2621-625-03 |96169|AL| |D|0119 | V|49998|0073056

DRAWING DATA=2621-625-03 |96169|AL| |D|0120 | V|49998|0094572

DRAWING DATA=2621-625-03 |96169|AL| |D|0121 | V|49998|0076429

DRAWING DATA=2621-625-03 |96169|AL| |D|0122 | V|49998|0109802

DRAWING DATA=2621-625-03 |96169|AL| |D|0123 | V|49998|0072693

DRAWING DATA=2621-625-03 |96169|AL| |D|0124 | V|49998|0060600

DRAWING DATA=2621-625-03 |96169|AL| |D|0125 | W|49998|0063434

DRAWING DATA=2621-625-03 |96169|AL| |D|0126 |AA|49998|0073173

DRAWING DATA=2621-625-03 |96169|AL| |D|0127 | W|49998|0064212

DRAWING DATA=2621-625-03 |96169|AL| |D|0128 | W|49998|0063746

DRAWING DATA=2621-625-03 |96169|AL| |D|0129 | W|49998|0071249

DRAWING DATA=2621-625-03 |96169|AL| |D|0130 | W|49998|0082521

DRAWING DATA=2621-625-03 |96169|AL| |D|0132 | W|49998|0077575

DRAWING DATA=2621-625-03 |96169|AL| |D|0133 | Y|49998|0063434

DRAWING DATA=2621-625-03 |96169|AL| |D|0134 | Y|49998|0078666

DRAWING DATA=2621-625-03 |96169|AL| |D|0135 |AC|49998|0091986

DRAWING DATA=2621-625-03 |96169|AL| |D|0136 | Y|49998|0080972

DRAWING DATA=2621-625-03 |96169|AL| |D|0137 | Y|49998|0082349

DRAWING DATA=2621-625-03 |96169|AL| |D|0138 | Y|49998|0078670

DRAWING DATA=2621-625-03 |96169|AL| |D|0139 | Y|49998|0068212

DRAWING DATA=2621-625-03 |96169|AL| |D|0140 | Y|49998|0062850

DRAWING DATA=2621-625-03 |96169|AL| |D|0141 | Z|49998|0067637

DRAWING DATA=2621-625-03 |96169|AL| |D|0142 | Z|49998|0101793

DRAWING DATA=2621-625-03 |96169|AL| |D|0143 | Z|49998|0102035

DRAWING DATA=2621-625-03 |96169|AL| |D|0144 | Z|49998|0062060

DRAWING DATA=2621-625-03 |96169|AL| |D|0145 |AA|49998|0059438

DRAWING DATA=2621-625-03 |96169|AL| |D|0146 |AA|49998|0064093

DRAWING DATA=2621-625-03 |96169|AL| |D|0147 |AA|49998|0062043

DRAWING DATA=2621-625-03 |96169|AL| |D|0148 |AA|49998|0067228

DRAWING DATA=2621-625-03 |96169|AL| |D|0149 |AB|49998|0075074

DRAWING DATA=2621-625-03 |96169|AL| |D|0150 |AB|49998|0081824

DRAWING DATA=2621-625-03 |96169|AL| |D|0151 |AC|49998|0081539

DRAWING DATA=2621-625-03 |96169|AL| |D|0152 |AB|49998|0066724

DRAWING DATA=2621-625-03 |96169|AL| |D|0153 |AB|49998|0063072

DRAWING DATA=2621-625-03 |96169|AL| |D|0156 |AD|49998|0070574

DRAWING DATA=2621-625-03 |96169|AL| |D|0157 |AE|49998|0077520

DRAWING DATA=2621-625-03 |96169|AL| |D|0158 |AE|49998|0072166

DRAWING DATA=2621-625-03 |96169|AL| |D|0159 |AF|49998|0077054

DRAWING DATA=2621-625-03 |96169|AL| |D|0160 |AF|49998|0069001

DRAWING DATA=2621-625-03 |96169|AL| |D|0161 |AF|49998|0072044

DRAWING DATA=2621-625-03 |96169|AL| |D|0162 |AF|49998|0069580

DRAWING DATA=2621-625-03 |96169|AL| |D|0163 |AF|49998|0062209

DRAWING DATA=2621-625-03 |96169|AL| |D|0164 |AG|49998|0065301

DRAWING DATA=2621-625-03 |96169|AL| |D|0165 |AG|49998|0075974

DRAWING DATA=2621-625-03 |96169|AL| |D|0167 |AH|49998|0058799

DRAWING DATA=2621-625-03 |96169|AL| |D|0168 |AH|49998|0072714

DRAWING DATA=2621-625-03 |96169|AL| |D|0169 |AH|49998|0075954

DRAWING DATA=2621-625-03 |96169|AL| |D|0170 |AH|49998|0027555

DRAWING DATA=2621-625-03 |96169|AL| |D|0172 |AJ|49998|0032592

DRAWING DATA=2621-625-03 |96169|AL| |D|0173 |AJ|49998|0035233

DRAWING DATA=2621-625-03 |96169|AL| |D|0174 |AJ|49998|0036435

DRAWING DATA=2621-625-03 |96169|AL| |D|0175 |AL|49998|0034587

DRAWING DATA=2621-625-03 |96169|AL| |D|0176 |AL|49998|0031758

DRAWING DATA=2621-625-03 |96169|AL| |D|0177 |AL|49998|0032520

DRAWING DATA=2621-625-03 |96169|AL| |D|0178 |AL|49998|0032671

DRAWING DATA=2621-625-03 |96169|AL| |D|0179 |AL|49998|0037460

DRAWING DATA=2621-625-03 |96169|AL| |D|0180 |AL|49998|0036663

DRAWING DATA=2621-625-03 |96169|AL| |D|0181 |AL|49998|0036941

DRAWING DATA=2621-625-03 |96169|AL| |D|0182 |AL|49998|0037691

DRAWING DATA=2621-625-03 |96169|AL| |D|0185 |AK|49998|0034494

DRAWING DATA=2621-625-03 |96169|AL| |D|0186 |AL|49998|0040759

DRAWING DATA=2621-625-03 |96169|AL| |D|0187 |AL|49998|0033485

DRAWING DATA=2621-625-03 |96169|AL| |D|0188 |AL|49998|0037555

DRAWING DATA=2621-625-03 |96169|AL| |D|0189 |AL|49998|0048190

DRAWING DATA=2621-625-03 |96169|AL| |D|0190 |AL|49998|0032497

DRAWING DATA=2621-826-01 |96169| L| |D|0001 | L|49998|0056754

DRAWING DATA=2621-826-01 |96169| L| |D|0001.1 | K|49998|0087603

DRAWING DATA=2621-826-01 |96169| L| |D|0001.2 | F|49998|0048315

DRAWING DATA=2621-826-01 |96169| L| |D|0001.3 | K|49998|0040831

DRAWING DATA=2621-826-01 |96169| L| |D|0002 | J|49998|0115015

DRAWING DATA=2621-826-01 |96169| L| |D|0002.1 | L|49998|0078365

DRAWING DATA=2621-826-01 |96169| L| |D|0003 | L|49998|0095443

DRAWING DATA=2621-826-01 |96169| L| |D|0003.1 | L|49998|0061346

DRAWING DATA=2621-826-01 |96169| L| |D|0004 | J|49998|0049359

DRAWING DATA=2621-826-01 |96169| L| |D|0004.1 | J|49998|0055857

DRAWING DATA=2621-826-01 |96169| L| |D|0004.2 | G|49998|0056977

DRAWING DATA=2621-826-01 |96169| L| |D|0005 | G|49998|0045921

DRAWING DATA=2621-826-01 |96169| L| |D|0005.1 | J|49998|0051959

DRAWING DATA=2621-826-01 |96169| L| |D|0005.2 | J|49998|0026953

DRAWING DATA=2621-826-01 |96169| L| |D|0006 | J|49998|0039854

DRAWING DATA=2621-826-01 |96169| L| |D|0006.1 | J|49998|0049544

DRAWING DATA=2621-826-01 |96169| L| |D|0007 | J|49998|0055631

DRAWING DATA=2621-826-01 |96169| L| |D|0007.1 | J|49998|0043854

DRAWING DATA=2621-826-01 |96169| L| |D|0008 | L|49998|0057162

DRAWING DATA=2621-826-01 |96169| L| |D|0009 | J|49998|0038265

DRAWING DATA=2621-826-01 |96169| L| |D|0009.1 | J|49998|0046414

DRAWING DATA=2621-826-01 |96169| L| |D|0010 | J|49998|0055882

DRAWING DATA=2621-826-01 |96169| L| |D|0011 | J|49998|0038680

DRAWING DATA=2621-826-01 |96169| L| |D|0011.1 | J|49998|0048318

DRAWING DATA=2621-826-01 |96169| L| |D|0012 | J|49998|0054340

DRAWING DATA=2621-826-01 |96169| L| |D|0013 | -|49998|0042497

DRAWING DATA=2621-826-01 |96169| L| |D|0014 | J|49998|0041679

DRAWING DATA=2621-826-01 |96169| L| |D|0014.1 | J|49998|0045464

DRAWING DATA=2621-826-01 |96169| L| |D|0015 | J|49998|0065125

DRAWING DATA=2621-826-01 |96169| L| |D|0016 | J|49998|0050107

DRAWING DATA=2621-826-01 |96169| L| |D|0017 | J|49998|0056740

DRAWING DATA=2621-826-01 |96169| L| |D|0020 | J|49998|0039272

DRAWING DATA=2621-826-01 |96169| L| |D|0020.1 | J|49998|0052709

DRAWING DATA=2621-826-01 |96169| L| |D|0021 | J|49998|0051755

DRAWING DATA=2621-826-01 |96169| L| |D|0022 | J|49998|0050796

DRAWING DATA=2621-826-01 |96169| L| |D|0023 | J|49998|0055526

DRAWING DATA=2621-826-01 |96169| L| |D|0024 | J|49998|0051328

DRAWING DATA=2621-826-01 |96169| L| |D|0025 | J|49998|0051540

DRAWING DATA=2621-826-01 |96169| L| |D|0026 | J|49998|0051775

DRAWING DATA=2621-826-01 |96169| L| |D|0027 | J|49998|0051245

DRAWING DATA=2621-826-01 |96169| L| |D|0028 | J|49998|0051640

DRAWING DATA=2621-826-01 |96169| L| |D|0029 | J|49998|0051471

DRAWING DATA=2621-826-01 |96169| L| |D|0030 | J|49998|0052425

DRAWING DATA=2621-826-01 |96169| L| |D|0031 | J|49998|0053087

DRAWING DATA=2621-826-01 |96169| L| |D|0032 | J|49998|0052840

DRAWING DATA=2621-826-01 |96169| L| |D|0033 | J|49998|0053676

DRAWING DATA=2621-826-01 |96169| L| |D|0034 | J|49998|0041353

DRAWING DATA=2621-826-01 |96169| L| |D|0034.1 | J|49998|0054701

DRAWING DATA=2621-826-01 |96169| L| |D|0035 | J|49998|0045398

DRAWING DATA=2621-826-01 |96169| L| |D|0035.1 | J|49998|0041062

DRAWING DATA=2621-826-01 |96169| L| |D|0036 | J|49998|0039718

DRAWING DATA=2621-826-01 |96169| L| |D|0036.1 | J|49998|0054579

DRAWING DATA=2621-826-01 |96169| L| |D|0037 | J|49998|0050272

DRAWING DATA=2621-826-01 |96169| L| |D|0038 | J|49998|0040014

DRAWING DATA=2621-826-01 |96169| L| |D|0038.1 | J|49998|0056214

DRAWING DATA=2621-826-01 |96169| L| |D|0039 | J|49998|0055923

DRAWING DATA=2621-826-01 |96169| L| |D|0040 | J|49998|0066638

DRAWING DATA=2621-826-01 |96169| L| |D|0041 | K|49998|0037606

DRAWING DATA=2621-826-01 |96169| L| |D|0041.1 | K|49998|0051430

DRAWING DATA=2621-826-01 |96169| L| |D|0042 | K|49998|0043620

DRAWING DATA=2621-826-01 |96169| L| |D|0043 | L|49998|0041012

DRAWING DATA=2621-826-01 |96169| L| |D|0043.1 | L|49998|0037785

DRAWING DATA=2621-826-01 |96169| L| |D|0043.2 | L|49998|0037958

DRAWING DATA=2621-826-01 |96169| L| |D|0044 | L|49998|0046862

DRAWING DATA=2621-826-01 |96169| L| |D|0044.1 | L|49998|0041040

DOCUMENT REF DATA=FED-STD-H28 | | |B |190426|A| | |

DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01|

DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | |

DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | |

DOCUMENT REF DATA=ASTM-B369 | | | |200401|A| | |

DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |

DOCUMENT REF DATA=SAE AMS 5520 | | |E |980401|A| | |

DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |

DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |

DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |

DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | |

DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |

DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | |

DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |

DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01|

DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | |

DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |

DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |

3. REQUIREMENTS

3.1 ;The Venturi Meter must be made in accordance with General Dynamics Electric Boat Division drawing 2621-826-01 Assembly 41A, except as amplified or modified herein.;

3.2 ;Retainer Ring from assembly 41A of drawing 2621-826-01 must be made from SAE AMS 5520;

3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:

Part - ;Venturi body piece 42A of drawing 2621-826-01;

Material - ;ASTM B369 UNS C96400;

Part - ;Valve, venturi piece 8A of drawing 2621-826-01;

Material - ;QQ-N-281 with mechanical properties in accordance with Note 18 of drawing 2621-826-01;

Part - ;Plug, hex head piece 7A of drawing 2621-625-03;

Material - ;QQ-N-281 with mechanical properties in accordance with Note 16 of drawing 2621-625-03;

3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.

Test - ;Hydrostatic Pressure Test;

Item - ;Venturi body piece 42A;

Performance - ;Note 9 of drawing 2621-826-01;

Acceptance - ;Note 9 of drawing 2621-826-01;

Test - Non-Destructive Tests

Item - ;Weld Repair and/or Production Weld (as applicable);

Performance - Per applicable fabrication specification

Acceptance - Per applicable fabrication specification

Test - Weldability Test of ASTM-B369 material

Item - ;Venturi body piece 42A;

Performance - ASTM-B369

Acceptance - ASTM-B369

Test - Dye Penetrant Inspection

Part - Body Weld Ends in final machined condition including 1/2" of base material

Performance - T9074-AS-GIB-010/271

Acceptance - S9074-AR-GIB-010A/278

3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the

following must be used:

For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG.

For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG.

For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG.

The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this

contract, the following must be used:

For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes.

For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes.

For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes.

3.6 Specification Change - For QQ-N-281, Class B material:

1 - Footnote 9 to Table II of QQ-N-281 does not apply.

2 - When starting material is Round Bar greater than 3" dia,

the mechanical properties of Hex Bar apply.

3.7 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance

Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the

applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC

document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/

3.8 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent

inspection in accordance with ASME B1 series is acceptable.

3.8.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement.

3.8.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22

of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222.

3.8.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system.

3.9 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the

fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly.

3.10 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel

applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification

Data must be submitted for review and approval prior to performing any welding or brazing.

3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,

including any/all invoked specifications and drawings.

3.12 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.

Definitions are provided elsewhere in the Contract/Purchase Order.

3.12.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide

a copy of this request to the QAR. Requests must include the information listed below.

a. A complete description of the contract requirement affected

and the nature of the waiver/deviation (non-conformance),

including a classification of Critical, Major, or Minor.

b. Number of units (and serial/lot numbers) to be delivered in this

configuration.

c. Any impacts to logistics support elements (such as software,

manuals, spares, tools, and similar) being utilized by Government

personnel or impacts to the operational use of the product.

d. Information about remedial action being taken to prevent reoccurrence

of the non-conformance.

3.12.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail.

3.12.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering

Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:

a. The change priority, change classification (Class I or Class II),

and change justification.

b. A complete description of the change to be made and the need for

that change.

c. A complete listing of other Configuration Items impacted by the

proposed change and a description of the impact on those CIs.

d. Proposed changes to documents controlled by the Government.

e. Proposed serial/lot number effectivities of units to be

produced in, or retrofitted to, the proposed configuration.

f. Recommendations about the way a retrofit should be accomplished.

g. Impacts to any logistics support elements (such as software,

manuals, spares, tools, and similar) being utilized by Government

personnel in support of the product.

h. Impacts to the operational use of the product.

i. Complete estimated life-cycle cost impact of the proposed change.

j. Milestones relating to the processing and implementation of the

engineering change.

3.13 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.

3.14 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further

application of the above documents is prohibited.prohibited.

3.14.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.

^ QUALITY ASSURANCE REQUIREMENTS ^

3.15 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,

identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance

criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.

3.16 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012

or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.

3.16.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality

requirements established in the Contract/Purchase Order.

3.16.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon

notification, make his facilities available for audit by the contracting Officer or his authorized representative.

3.16.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of

any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.

3.16.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly

notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency

(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.

3.16.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.

3.17 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and

rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.

3.17.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made

available for operations of such devices and for verification of their accuracy and condition.

3.17.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided

by the Government representative.

3.18 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization

of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being

purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon

receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest

Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."

3.18.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.

3.18.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services

specified in the purchase order or contract.

3.18.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the

purchased product on the end item represented by this contract.

3.18.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be

established. Records of this effort must be available for review by the government.

3.18.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.

3.19 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:

3.19.1 Visual examination upon receipt to detect damage during transit.

3.19.2 Inspection for completeness and proper type.

3.19.3 Verification of material quality received.

3.19.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.

3.19.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.

3.19.6 Identification and protection from improper use or disposition.

3.19.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and

necessity for withholding the material from use.

3.19.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on

bailed property must be maintained.

3.19.9 Material returned to the contractor must be handled as GFM.

3.20 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required

Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,

Section C of this contract/purchase order.

3.20.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that

implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.

3.21 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must

provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of

operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.

3.21.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the

marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is

permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.

3.21.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and

the tag securely affixed to the material.

3.21.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part

number, piece number, traceability number, and the location of the permanent mark.

3.21.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ;

3.22 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:

3.22.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the

material supplied.

3.22.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or

mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used

during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material

must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered,

the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below.

TRACEABILITY MARKING ________________________________________________

(marking on finished item)

IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO

HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________

(when applicable)

_________________________________________ DATE _____________________

(name and signature of auth. co. rep.)

3.22.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract

requirements. Transcription of certification data is prohibited.

3.22.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.

3.22.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.

3.23 Material Handling - The written material control process must include the following:

3.23.1 All raw materials must have traceability markings (except as specified below).

3.23.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.

3.23.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate

material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability

marking must be reapplied upon completion of the final manufacturing process.

3.23.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a

minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and

grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.

3.23.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in

DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.

3.23.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking

location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.

3.24 Receiving inspection -

3.24.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to

another location.

3.24.2 Receiving Inspection must include as a minimum -

Verification that the traceability marking on the material agrees with that on the certification test reports.

Verification that certification test reports are legible and complete.

Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.

3.25 Discrepancy reporting -

3.25.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to

the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR).

3.26 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.

3.26.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military

specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code),

table IIA (for sample size).

SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.

3.26.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the

Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.

3.26.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification

test reports must also be 100% inspected for completeness and legibility.

3.26.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible.

3.27 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as

part of the certification OQE package submitted by the Contractor.

Note: These requirements do not apply to tack/spot welds.

3.27.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).

3.27.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The

approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be

submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted,

citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'')

3.27.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the

contract.

3.27.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair

Similar open opportunities

Opportunity Agency Set-aside Responses due
Stem, fluid valve NAICS 332919 Naval Supply Systems Command No set-aside
Stem, fluid valve NAICS 332919 Naval Supply Systems Command No set-aside
Stem, fluid valve NAICS 332919 Naval Supply Systems Command No set-aside
Valve, flow control NAICS 332919 Naval Supply Systems Command No set-aside
Valve, ball NAICS 332919 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors