Vacuum pump unit, RO, in repair/modification of
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N0010424RZA02
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333914 Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- PSC
- 4310 Compressors And Vacuum Pumps
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation notice seeks proposals for the repair/modification of vacuum pump units for the Department of the Navy Naval Supply Systems Command. Offerors must propose a firm fixed price for the full repair effort, including teardown and evaluation, and meet a required repair turnaround time of 365 days. Proposals will be evaluated based on meeting all requirements outlined in the technical data package and referenced repair instructions. The deadline for proposals is February 9, 2024.
There is no set-aside designated for this requirement. The primary NAICS code is 333914 and PSC code is 750. The repair work must be performed at the original equipment manufacturer, CAGE code 42280. Price reductions may be assessed if the contractor does not meet the required repair turnaround time. All work must be certified and materials inspected and accepted at the government source.
Notice text
4 versions
Update #4 · Latest ·
CONTACT INFORMATION|4|N742.3|WR5DD|(717) 605-3261|amber.l.miller.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
TIME OF DELIVERY (JUNE 1997)|20|SubCLIN 0001AA|SIX(6)|365||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report, Material; Receiving Report & Invoice COMBO|Material - Inspect & Accept at Source|TBD|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See form
DD1423|1-866-618-5988 - WAWF Helpdesk|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
CONTRACT DEFINITIZATION (MAY 2023)|5|Firm-Fixed Price (FFP)|FFP|Vendor shall complete a Teardown & Evaluation of the carcasses and submit a FFP proposal within 90 days of Contract Effective Date.|FFP|TBD|
EQUAL OPPORTUNITY (SEP 2016)|2|||
LIMITATION OF GOVERNMENT LIABILITY (APR 1984)|2|TBD|TBD|
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||X|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (NOV2023))|5||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||x||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333914|750||||||||||||
TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. The subject solicitation is hereby updated from a Firm-Fixed Price (FFP) proposal request to an Undefinitized Contract Action (UCA) proposal request.
2. Please provide a repair proposal as an Estimated, Not-To-Exceed price for the full repair effort of the requirement. The vendor shall have 90 days to complete teardown and evaluation of the carcasses and submit a FFP proposal.
3. When submittin the Estimated,Not-To-Exceed Proposal, please provide cost of new unit for evaluation purposes.
4. The subject solicitation is hereby updated to remove clauses pertaining to FFP and induct clauses for UCAs.
Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because the RFP N0010424RZA02 includes the annex classified at the CONFIDENTIAL level which will be released only to offerors possessing
the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regualtion (DoD 5220.22-R).
1. This is an Advanced Equipment Repair Program (AERP) requirement.
2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Include cost of new or estimated cost of new with the submitted proposal.
3. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations, Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon
solicitation requirements. Changes or requests for changes after award will have consideration costs deducted from unit price.
4. In repair price, include all costs associated with receipt and complete repair of material that may be in un-whole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Also, please provide the following:
4.1. Teardown and Evaluation rate:
4.2. RTAT:
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turnaround Time (RTAT) - the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
5.1. Requested RTAT: 365 Days
5.2. Proposals shall reference the proposaed RTAT and any capacity constraints.
6. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made
pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default.
7. If requirement will be packaged at a location different from the Offeror's address, the Offeror will provide the Company Name, Street Address, and CAGE of the Packaging Facility.
8. If the Offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide traceability documentation if requested. Examples of traceability
documentation include but are not limited to the following:
8.1. Purchase order/Invoice between the Offeror and the OEM identifying the part number, revision level and quantities
8.2. OEM packing slip or certification identifying the part number,revision level and quantities
9. All contractual documents (i.e. contracts, delivery orders, purchase orders, task orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
10. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.
11. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy
Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
12. Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because N0010424RZA02 includes an annex classified at the CONFIDENTIAL level which will be released only to offerors possessing the
appropriate clearance. All classified material must be handled in accordance with the Natioanl Industrial Security Program Operating Manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the VACUUM PUMP UNIT,RO .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;Structureborne Noise Generation is confidential when filled out is confidential when filled out is confidential;
DRAWING DATA=BID123 |53711| -| |D|0001 | -|49998|0015028
DRAWING DATA=EB-4097 |96169| | |D|0001 | |00026|0000000
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;42280; , drawing ;15-3818 Pc 1; ,and the applicable SUBMEPP Repair Instruction ;5280-012-0006 REV - Chg 3 (CSD465); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD465, CSD445 and CSD446; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
Update #3 ·
CONTACT INFORMATION|4|N742.3|WR5DD|(717) 605-3261|amber.l.miller.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
TIME OF DELIVERY (JUNE 1997)|20|SubCLIN 0001AA|SIX(6)|365||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
REPAIR DELIVERY (FIRM FIXED PRICE)|1|365|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report, Material; Receiving Report & Invoice COMBO|Material - Inspect & Accept at Source|TBD|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See form
DD1423|1-866-618-5988 - WAWF Helpdesk|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
CONTRACT DEFINITIZATION (MAY 2023)|5|Firm-Fixed Price (FFP)|FFP|Vendor shall complete a Teardown & Evaluation of the carcasses and submit a FFP proposal within 90 days of Contract Effective Date.|FFP|TBD|
EQUAL OPPORTUNITY (SEP 2016)|2|||
LIMITATION OF GOVERNMENT LIABILITY (APR 1984)|2|TBD|TBD|
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||X|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (NOV2023))|5||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||x||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333914|750||||||||||||
TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because the RFP N0010424RZA02 includes the annex classified at the CONFIDENTIAL level which will be released only to offerors possessing
the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regualtion (DoD 5220.22-R).
1. This is an Advanced Equipment Repair Program (AERP) requirement.
2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Include cost of new or estimated cost of new with the submitted proposal.
3. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations, Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon
solicitation requirements. Changes or requests for changes after award will have consideration costs deducted from unit price.
4. In repair price, include all costs associated with receipt and complete repair of material that may be in un-whole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Also, please provide the following:
4.1. Teardown and Evaluation rate:
4.2. RTAT:
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turnaround Time (RTAT) - the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
5.1. Requested RTAT: 365 Days
5.2. Proposals shall reference the proposaed RTAT and any capacity constraints.
6. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made
pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default.
7. If requirement will be packaged at a location different from the Offeror's address, the Offeror will provide the Company Name, Street Address, and CAGE of the Packaging Facility.
8. If the Offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide traceability documentation if requested. Examples of traceability
documentation include but are not limited to the following:
8.1. Purchase order/Invoice between the Offeror and the OEM identifying the part number, revision level and quantities
8.2. OEM packing slip or certification identifying the part number,revision level and quantities
9. All contractual documents (i.e. contracts, delivery orders, purchase orders, task orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
10. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.
11. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy
Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
12. Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because N0010424RZA02 includes an annex classified at the CONFIDENTIAL level which will be released only to offerors possessing the
appropriate clearance. All classified material must be handled in accordance with the Natioanl Industrial Security Program Operating Manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the VACUUM PUMP UNIT,RO .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;Structureborne Noise Generation is confidential when filled out is confidential when filled out is confidential;
DRAWING DATA=BID123 |53711| -| |D|0001 | -|49998|0015028
DRAWING DATA=EB-4097 |96169| | |D|0001 | |00026|0000000
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;42280; , drawing ;15-3818 Pc 1; ,and the applicable SUBMEPP Repair Instruction ;5280-012-0006 REV - Chg 3 (CSD465); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD465, CSD445 and CSD446; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
Update #2 ·
CONTACT INFORMATION|4|N742.3|WR5DD|(717) 605-3261|amber.l.miller.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
TIME OF DELIVERY (JUNE 1997)|20|SubCLIN 0001AA|SIX(6)|365||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
REPAIR DELIVERY (FIRM FIXED PRICE)|1|365|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report, Material; Receiving Report & Invoice COMBO|Material - Inspect & Accept at Source|TBD|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See form
DD1423|1-866-618-5988 - WAWF Helpdesk|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
CONTRACT DEFINITIZATION (MAY 2023)|5|Firm-Fixed Price (FFP)|FFP|Vendor shall complete a Teardown & Evaluation of the carcasses and submit a FFP proposal within 90 days of Contract Effective Date.|FFP|TBD|
EQUAL OPPORTUNITY (SEP 2016)|2|||
LIMITATION OF GOVERNMENT LIABILITY (APR 1984)|2|TBD|TBD|
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||X|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (JAN2023))|3||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||X||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333914|750||||||||||||
TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because the RFP N0010424RZA02 includes the annex classified at the CONFIDENTIAL level which will be released only to offerors possessing
the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regualtion (DoD 5220.22-R).
1. This is an Advanced Equipment Repair Program (AERP) requirement.
2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Include cost of new or estimated cost of new with the submitted proposal.
3. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations, Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon
solicitation requirements. Changes or requests for changes after award will have consideration costs deducted from unit price.
4. In repair price, include all costs associated with receipt and complete repair of material that may be in un-whole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Also, please provide the following:
4.1. Teardown and Evaluation rate:
4.2. RTAT:
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turnaround Time (RTAT) - the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
5.1. Requested RTAT: 365 Days
5.2. Proposals shall reference the proposaed RTAT and any capacity constraints.
6. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made
pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default.
7. If requirement will be packaged at a location different from the Offeror's address, the Offeror will provide the Company Name, Street Address, and CAGE of the Packaging Facility.
8. If the Offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide traceability documentation if requested. Examples of traceability
documentation include but are not limited to the following:
8.1. Purchase order/Invoice between the Offeror and the OEM identifying the part number, revision level and quantities
8.2. OEM packing slip or certification identifying the part number,revision level and quantities
9. All contractual documents (i.e. contracts, delivery orders, purchase orders, task orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
10. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.
11. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy
Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
12. Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because N0010424RZA02 includes an annex classified at the CONFIDENTIAL level which will be released only to offerors possessing the
appropriate clearance. All classified material must be handled in accordance with the Natioanl Industrial Security Program Operating Manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the VACUUM PUMP UNIT,RO .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;Structureborne Noise Generation is confidential when filled out is confidential when filled out is confidential;
DRAWING DATA=BID123 |53711| -| |D|0001 | -|49998|0015028
DRAWING DATA=EB-4097 |96169| | |D|0001 | |00026|0000000
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;42280; , drawing ;15-3818 Pc 1; ,and the applicable SUBMEPP Repair Instruction ;5280-012-0006 REV - Chg 3 (CSD465); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD465, CSD445 and CSD446; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
Update #1 ·
CONTACT INFORMATION|4|N742.3|WR5DD|(717) 605-3261|amber.l.miller.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
TIME OF DELIVERY (JUNE 1997)|20|SubCLIN 0001AA|SIX(6)|365||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
REPAIR DELIVERY (FIRM FIXED PRICE)|1|365|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report, Material; Receiving Report & Invoice COMBO|Material - Inspect & Accept at Source|TBD|N00104|TBD|TBD|N60138|TBD|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See form
DD1423|1-866-618-5988 - WAWF Helpdesk|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
CONTRACT DEFINITIZATION (MAY 2023)|5|Firm-Fixed Price (FFP)|FFP|Vendor shall complete a Teardown & Evaluation of the carcasses and submit a FFP proposal within 90 days of Contract Effective Date.|FFP|TBD|
EQUAL OPPORTUNITY (SEP 2016)|2|||
LIMITATION OF GOVERNMENT LIABILITY (APR 1984)|2|TBD|TBD|
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||X|||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (JAN2023))|3||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||X||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (DEC 2022))|3||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333914|750||||||||||||
TYPE OF CONTRACT (APR 1984)|1|Firm-Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. This is an Advanced Equipment Repair Program (AERP) requirement.
2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Include cost of new or estimated cost of new with the submitted proposal.
3. When submitting a proposal, make sure to specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations, Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon
solicitation requirements. Changes or requests for changes after award will have consideration costs deducted from unit price.
4. In repair price, include all costs associated with receipt and complete repair of material that may be in un-whole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Also, please provide the following:
4.1. Teardown and Evaluation rate:
4.2. RTAT:
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turnaround Time (RTAT) - the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
5.1. Requested RTAT: 365 Days
5.2. Proposals shall reference the proposaed RTAT and any capacity constraints.
6. Price Reductions: Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made
pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's rights to terminate for default.
7. If requirement will be packaged at a location different from the Offeror's address, the Offeror will provide the Company Name, Street Address, and CAGE of the Packaging Facility.
8. If the Offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide traceability documentation if requested. Examples of traceability
documentation include but are not limited to the following:
8.1. Purchase order/Invoice between the Offeror and the OEM identifying the part number, revision level and quantities
8.2. OEM packing slip or certification identifying the part number,revision level and quantities
9. All contractual documents (i.e. contracts, delivery orders, purchase orders, task orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
10. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.
11. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy
Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
12. Offeror's must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010424RZA02, because N0010424RZA02 includes an annex classified at the CONFIDENTIAL level which will be released only to offerors possessing the
appropriate clearance. All classified material must be handled in accordance with the Natioanl Industrial Security Program Operating Manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the VACUUM PUMP UNIT,RO .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;Structureborne Noise Generation is confidential when filled out is confidential when filled out is confidential;
DRAWING DATA=BID123 |53711| -| |D|0001 | -|49998|0015028
DRAWING DATA=EB-4097 |96169| | |D|0001 | |00026|0000000
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;42280; , drawing ;15-3818 Pc 1; ,and the applicable SUBMEPP Repair Instruction ;5280-012-0006 REV - Chg 3 (CSD465); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD465, CSD445 and CSD446; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Vacuum pump unit, RO, in repair/modification of | Award Notice | |
| This notice | Solicitation | |
| Vacuum pump unit, RO, in repair/modification of | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Pump unit, rotary | Naval Supply Systems Command | No set-aside | |
| Pump unit, centrifug | Naval Supply Systems Command | No set-aside | |
| Pump, reciprocating, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Vacuum pump unit | Naval Supply Systems Command | No set-aside | |
| Pump unit, rotary | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity