VA797R-14-R-0029 - little rock, AR laundry eqpt request for information only
Award Notice Posted
- Solicitation number
- VA797R14R0029
- Agency
-
National Acquisition Center
Headquarters, Department of Veterans Affairs
- Awarded
- to Western State Design, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- VA797H16C0021 Federal contract award
- NAICS code
- 333318 Other Commercial and Service Industry Machinery Manufacturing
- PSC
- Not on record
- Place of performance
- Vamc Little Rock, AR 72106 USA
Notice details come from SAM.gov. Updated .
Notice text
SCHEDULE OF SUPPLIES/SERVICES and PRICES/COSTS
ITEM # 1
Laundry Ancillary Support Water Storage/Pumping System Equipment, and related systems: Furnish and install new, one (1) system. The laundry ancillary support water storage/pumping system equipment and water softening system.
Qty: 1 System Unit Price$ ______________ each Total for 1 System $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 2
Non-Recessed Floor Scales: Furnish and install 2 (ea) non-recessed floor scales with a maximum weight capacity of 3000 pounds, recessed within the floor
Qty: 2 Unit Price$ ______________ each Total for 2 $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 3
Soil Storage/Sorting Conveyor System: Furnish and install new, 1 (system).
Qty: 1 System Unit Price$ ______________ System Total for 1 System $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 4
Refurbish and Install Automated Soil and Clean Side Monorail System - Refurbish two (2) system automated monorail system on both the clean and soiled sides of the textile care processing facility.
Qty: 2 Refurbished System Unit Price$ _________ System
Total for 2 Systems $________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 5
Continuous Wash Extract Tunnel Washing Systems: Furnish and install two (2) each, Continuous Wash Extract Washing Systems (CWEWS). .
Qty: 2 Systems Unit Price$ ______________ each
Total for 2 systems $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 6
400/500-POUND WASHER-EXTRACTOR: Furnish and install new, one (1) each, open pocket automatic loading non-production washer extractor.
Qty: 1 each Unit Price$ ______________ each Total for 1 each $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 7
200/300-POUND WASHER-EXTRACTOR: Furnish and install new, one (1) each, open pocket automatic loading non-production washer extractor.
Qty: 1 each Unit Price$ ______________ each Total for 1 each $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 8
400/500 POUND GAS HEATED DRYING AND CONDITIONING TUMBLER WITH EXTERNAL LINT COLLECTION:
Furnish and install new, one (1) each, 400/500 LB drying and conditioning tumbler.
Qty: 1 each Unit Price$ ______________ each Total for 1 each $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 9
100/110 LB Washer Extractors
Furnish and install new, three (3) each, 100/110 LB washer extractors.
Qty: 3 each Unit Price$ ______________ each Total for 3 each $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 10
110/120 Pound (Non-Production) Gas Heated Drying and Conditioning Tumblers:
Furnish and install three (3) each 110/120-pound gas heated dryer with internal lint collection.
Qty: 3 each Unit Price$ ______________ each Total for 3 each $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 11
Flatwork Ironing Systems:
Furnish and install two (2) each, color touch screen controls & information systems" that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics.
Qty: 2 systems Unit Price$ ______________ each Total for 2 systems ____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 12
Small Piece Folding Machines:
Furnish and install 4 (ea.) color touch screen controls & information systems" that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 13
Folding Tables:
Furnish and install 6 (ea), folding tables and storage devices.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************ITEM # 14
Central Wet/Dry Vacuum System:
Furnish and install one (1), 20 horsepower central wet/dry vacuum system.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
ITEM # 15
Industrial Laundry Plant Management System:
Furnish and install new, one (1) each Industrial Laundry Plant Management System.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 16
Air Filtration System:
Furnish and install new three (3) each Air Filtration Systems.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
***************************************************************************************************************************
ITEM # 17
Garment Tunnel Finisher: Furnish and install 1 (ea) Garment Tunnel Finisher.
Qty: 1 Unit Price$ ______________ each Total for 1 $____________
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 18
Blanket Folder System:
The successful offeror shall provide and install one (1) ea. Blanket folding system.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
ITEM # 19
Portable Plastic Wrapping Machine: The successful offeror shall provide and install a plastic, heat seal portable wrapping machine.
Total Installation Costs: $______________
Equipment Rigging
Plumbing and Pressure Piping work
Electrical work
Other (Identify)
(Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)
Final Cost $ _____________
*************************************************************************************************************
Files
| File | Type | Posted |
|---|---|---|
| VA797R-14-R-0029-000.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| VA797R-14-R-0029 - little rock, AR laundry eqpt | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity