VA door repairs

Awarded Award Notice Posted

Solicitation number
GS-03P-16-QN-C-7009
Agency
Public Buildings Service General Services Administration
Awarded
to Arrows Steel & Construction, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
GS03P16QNC7012 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Richard H. Poff Federal Building Roanoke, Virginia 24011, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Apr 12, 2016 4:02 pm

RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


SCOPE OF WORK:


The overall scope of this project is to repair doors and replace specified hardware on floors 6 and


8~13 at the Richard H. Poff Federal Building, Roanoke, Virginia. Reference attached


spreadsheet labeled (VA Door Survey 12-11-2015) for specific locations & hardware to be


replaced.


1. Handicap Buttons - Remove (14 each) handicap buttons and provide stainless steel


cover plate over recessed wall box. Rewire the existing key pad controllers directly to the


automatic swing door operators to allow automatic door operations once the key pad is


activated by card key. Repair wall and paint around cover plate as required. Return


removed hardware to the VA office.


2. Electromagnetic Door Locks (Glass Doors / Mortise) - Replace (8 each) recessed


magnetic locks and replace with new. Return old electromagnetic door locks to GSA.


Reference door survey for exact location. Existing model is manufactured by Schlage


Mortise M Model number GF3000.


3. Electromagnetic Door Locks (Wood Doors / Surface Mount) - Remove (12 each)


recessed electromagnetic door locks and provide cover plate to match door frame


cladding. See government provided drawing SK-A-033 for cover plate details. Provide


and install (12 each) new surface mounted electromagnetic door locks. Provide mounting


hardware submittal for acceptance prior to installation. Connect magnetic locks to


existing controllers. New electromagnetic locks shall be Schlage M420/422.


4. Door Closers - Replace (9 each) door closers to match existing. Wood doors have a


recessed floor mounted door closer make by "Dorma." Glass door closers are located


within the top rail of the door. Specifications shall meet or exceed existing units.


5. Metal Cladding - Replace (8 each) decorative metal cladding around doors with new.


Existing metal cladding above doors is damaged and requires replacement. New cladding


shall be exact dimensions, thickness, and finish as existing.


6. Relocate Doors - Remove and reinstall (2 each) door leafs and swap location with the


8th floor N/E and 12th floor Southwest.


7. Door Stop - Provide (26 each) rubber door stoppers at all glass door locations. Match


existing government provided sample.


8. Door Alignment - Adjust (31 each) sets of doors to be realigned with clearances


between the doors, header, jamb and threshold as recommended by door manufacturer.


9. Card Reader - Replace (1 each) card reader on the 9th floor Southwest entrance with


Identiv TS Government Card Readers compatible with current system.


12/30/2015


RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


Page 3 of 8


PLACE OF PERFORMANCE:


210 FRANKLIN ROAD, ROOM 753, ROANOKE, VIRGINIA 24011 - VA0436ZZ


POINT OF CONTACT:


David J. Vernon David.Vernon@gsa.gov


Project Manager, TEL: 540-266-2580


TIME OF PERFORMANCE:


All work to take place during normal working hours of 7:30 am - 4:30 pm. Coordinate with the


GSA representative and VA representatives on work that may cause noise or odor disruptions.


PERIOD OF PERFORMANCE:


All work shall be completed within 120 days after receipt of the notice to proceed. Work shall be


completed in two phases. The contractor shall have 90 days to procure materials and complete


security clearances. The actual work on site shall be completed within 30 calendar days.


CONDITIONS AFFECTING THE WORK:


It shall be the responsibility of the contractors to inspect the site, determine the quantity of work


involved, compare the specifications with the work to be done, and inform themselves as to all


conditions, including other work, if any, being performed.


Failure to do so will in no way relieve the contractor from the necessity of furnishing any


materials or performing any work that may be required to carry out the contract in accordance


with the true intent and meaning of the specifications without additional cost to the Government.


TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT:


The Contracting Officer (CO), by written notice, may terminate performance of work under this


contract in whole or in part, when it is in the best interest of the Government. The termination of


the contract and compensation to the contractor shall be governed by the General Procurement


Regulations in effect on the date of the contract (41 CFR 1-8).


LAWS AND ORDINANCES:


The contractor shall comply with all laws, ordinances, and regulations (Federal, State, County,


City or otherwise).


12/30/2015


RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


Page 4 of 8


SCHEDULING CONTRACT WORK:


The contractor shall make necessary arrangements with the Project Manager to perform the work


and shall arrange and schedule his work so that the minimum amount of interference with


Government activities will result.


USE OF BUILDING FACILITIES:


The contractor may use utility services and toilet facilities of the building, subject to the approval


of the Buildings Manager. The contractor shall prohibit his employees from disturbing papers on


desks, opening desk drawers or cabinets, or using telephone or office equipment provided for


official Government use. The contractor shall require his employees to comply with the


instructions, pertaining to conduct and building regulations, issued by duly appointed officials,


such as the Buildings Manager, guards, inspectors, etc.


ACCIDENT PREVENTION - SAFETY:


The contractor shall use physical means to restrict access or direct flow of pedestrians and


vehicles around work areas. Barricades, ropes, signs, lights, etc., are to be used in accordance


safety practices and must be approved by the Buildings Manager. Contractor operations or


conduct which create unsafe or unhealthful conditions for building occupants or places


Government property in undo jeopardy, are prohibited.


FIRE HAZARDS:


The contractor shall take every precaution to prevent fire during the performance of this contract.


The contractor shall furnish a covered metal receptacle to be kept on the exterior of the building


to place the rein on all combustible materials, such as oily rags, waste, etc., used in performance


of the work. Paint product containers are to be kept sealed at all times except when in use. The


contractor must provide and have available at all times, portable fire extinguishers suitable for


potential hazard(s) involved. He must also obtain from the Buildings Manager, a separate daily


permit for any welding or cutting on a day-to-day basis.


MATERIALS:


The contractor shall furnish all supplies, materials, and equipment necessary for the performance


of the work included in this contract unless otherwise specified. Materials and supplies to be


used shall be commercially available products of reputable manufacturers or suppliers and shall


be of a quality that meets or exceeds current hardware. Upon request, the contractor shall submit


to the Buildings Manager a list giving the name of the manufacturer, the brand name and the


intended use of each of the materials that he proposes to use in the performance of the work.


12/30/2015


RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


Page 5 of 8


CONTRACTOR EMPLOYEES:


Each employee of the contractor shall be a citizen of the United States of America, or an alien


who has been lawfully admitted for permanent residence as evidenced by Alien Registration


Receipt Card For 1-151, or, who presents other evidence from the Immigration and


Naturalization Service that employment will not affect his immigration status.


DEBRIS AND CLEANING:


Remove and dispose of debris and dirt as it accumulates. Upon completion of work, remove


spatters, droppings, smudges, etc., and leave the premises clean. Unless otherwise specified, all


materials and equipment removed shall become the property of the contractor who shall remove


them from the job site.


WARRANTY:


Unless otherwise provided in the specifications, the contractor guarantees all work to be in


accordance with contract requirements and free from defective or inferior materials, equipment


and workmanship for one (1) year after date of acceptance by the contracting officer.


INSPECTION:


All material, workmanship, and equipment shall be subject to the inspection and approval of the


Contracting Officer (CO) or his representative. All work deemed unsatisfactorily performed


shall be promptly corrected and made acceptable to the Government.


WORKMANSHIP:


All work shall be coordinated and scheduled with the Contracting Officer (CO) and the


Contracting Officer (CO) has the right to reject any unsatisfactory or unsuitable material or


workmanship. Any damage caused by the contractor to the building(s), any of its contents of


tenants shall be the responsibility of the contractor to correct immediately. All work shall be


accomplished with the best practices of the trade.


INDEMNITY:


The contractor shall save and keep harmless and indemnify the Government against any and all


liability claims, and costs of whatsoever kind and nature of injury to or death of any person or


persons and for loss of damage to any property (Government or otherwise) occurring in


connection with or in any way incident to or arising out of the occupancy, use service, operations


or performance of work in connection with this contract, resulting in whole or in part from the


negligent acts or omissions of the contractor.


12/30/2015


RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


Page 6 of 8


SAFETY AND HEALTH:


All work shall comply with applicable requirements of 29 CFR 1910/1926 and 40 CFR 761. All


work shall comply with applicable state and municipal safety and health requirements. Where


there is a conflict between applicable regulations, the most stringent will apply.


The contractor shall assume full responsibility and liability for compliance with all applicable


regulations pertaining to the health and safety of personnel during the execution off work, and


shall hold the Government harmless for any action on its part or that of its employees or


subcontractors, which results in illness or death.


The contractor shall provide all necessary safety equipment and ensure that such equipment and


all relevant safety procedures are adequate for the job being performed and are utilized properly.


FAR 52.222-6 DAVIS-BACON ACT (FEB 1995) - (applicable to contracts in excess of $2,000)


(a) All laborers and mechanics employed or working upon the site of the work will be paid


unconditionally and not less often than once a week, and without subsequent deduction or rebate


on any account (except such payroll deductions as are permitted by regulations issued by the


Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona


fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not


less than those contained in the wage determination of the Secretary of Labor which is attached


hereto and made a part hereof, regardless of any contractual relationship which may be alleged to


exist between the Contractor and such laborers and mechanics. Contributions made or costs


reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act


on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics,


subject to the provisions of paragraph (d) of this clause; also, regular contributions made or costs


incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or


programs which cover the particular weekly period, are deemed to be constructively made or


incurred during such period. Such laborers and mechanics shall be paid not less than the


appropriate wage rate and fringe benefits in the wage determination for the classification of work


actually performed, without regard to skill, except as provided in the clause entitled "Apprentices


and Trainees". Laborers or mechanics performing work in more than one classification may be


compensated at the rate specified for each classification for the time actually worked therein;


provided, that the employer's payroll records accurately set forth the time spent in each


classification in which work is performed. The wage determination (including any additional


classifications and wage rates conformed under paragraph (b) of this clause) and the Davis-


Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at


the site of the work in a prominent and accessible place where it can be easily seen by the


workers.


(b)(1) The Contracting Officer shall require that any class of laborers or mechanics which is not


listed in the wage determination and which is to be employed under the contract shall be


12/30/2015


RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


Page 7 of 8


classified in conformance with the wage determination. The Contracting Officer shall approve


an additional classification and wage rate and fringe benefits therefor only when all the following


criteria have been met:


(i) The work to be performed by the classification requested is not performed by a classification


in the wage determination.


(ii) The classification is utilized in the area by the construction industry.


(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable


relationship to the wage rates contained in the wage determination.


(2) If the Contractor and the laborers and mechanics to be employed in the classification (if


known), or their representatives, and the Contracting Officer agree on the classification and wage


rate (including the amount designated for fringe benefits, where appropriate), a report of the


action taken shall be sent by the Contracting Officer to the Administrator of the Wage and Hour


Division, Employment Standards Administration, U. S. Department of Labor, Washington, DC


20210. The Administrator or an authorized representative will approve, modify, or disapprove


every additional classification action within 30 days of receipt and so advise the Contracting


Officer or will notify the Contracting Officer within the 30-day period that additional time is


necessary.


(3) In the event the Contractor, the laborers or mechanics to be employed in the classification, or


their representatives, and the Contracting Officer do not agree on the proposed classification and


wage rate (including the amount designated for fringe benefits, where appropriate), the


Contracting Officer shall refer the questions, including the views of all interested parties and the


recommendation of the Contracting Officer, to the Administrator of the Wage and Hour Division


for determination. The Administrator, or an authorized representative, will issue a determination


within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting


Officer within the 30 day period that additional time is necessary.


(4) The wage rate (including fringe benefits, where appropriate) determined pursuant to


subparagraphs (b)(2) and (b)(3) of this clause shall be paid to all workers performing work in the


classification under this contract from the first day on which work is performed in the


classification.


(c) Whenever the minimum wage rate prescribed in the contract for a class of laborers or


mechanics includes fringe benefit which is not expressed as an hourly rate, the Contractor shall


either pay the benefit as stated in the wage determination or shall pay another bona fide fringe


benefit or an hourly cash equivalent thereof.


(d) If the Contractor does not make payments to a trustee or other third person, the costs


reasonably anticipated in providing bona fide fringe benefits under a plan or program; provided,


12/30/2015


RICHARD H. POFF FEDERAL BUILDING


210 FRANKLIN RD. SW, ROANOKE, VA


VA DOOR REPAIRS PROJECT VA0095ZZ


STATEMENT OF WORK


Page 8 of 8


that the Secretary of Labor has found, upon the written request of the Contractor, that the


applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require


the Contractor to set aside in a separate account assets for the meeting of obligations under the


plan or program. (End of Clause)


GENERAL INDUSTRY SAFETY AND HEALTH STANDARDS:


The Department of Labor OSHA requires that all contractors involved in construction on


Government owned property comply with the Incorporation of General Industry Safety and


Health Standards applicable to Construction Work and Technical Amendments; Final Rule 29


CFR Parts 1910 & 126 as published in the Federal Register Volume 58, No. 124, June 30, 1993.


Any contractor that performs construction type work on any GSA project as defined by the


Scope of the referenced regulation is required to (1) provide and maintain his own protective


equipment and devices etc., and (2) require all subcontractors used on site to follow these same


provisions in the regulation.


SECURITY CLEARANCES:


Contractor shall be aware that all employees (contractor and sub-contractor employees)


scheduled to work under this contract through the duration of the contract shall follow GSA


clearance procedures. All contractor employees shall wear ID badges and the ID badges shall be


displayed at all times while on the job site. The contractor must consider clearance time & be


prepared to meet all project completion dates.


END OF STATEMENT OF WORK


12/30/2015

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity