USCG BASE KODIAK Microclor MC-80 Skid Mounted Hypochlorite Generator
Closed Solicitation Posted
- Solicitation number
- 70Z03521QPKF13600
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333318 Other Commercial and Service Industry Machinery Manufacturing
- PSC
- 4610 Water Purification Equipment
- Place of performance
- Milpitas, California 95035, United States
Notice details come from SAM.gov. Updated .
Notice text
Request an on-site hypochlorite generation (OSHG) system that is a skid-mounted system. Consisting of electrolytic cells, a rectifier, brine pump, piping, valves, instrumentation, and controls.
Require system to be pre-assembled, piped, wired, and factory-tested to facilitate simple installation and start-up at the jobsite.
Ancillary equipment necessary to make a complete and functional system includes a hydrogen dilution blower, water softener, water and brine filters, brine tank, hypochlorite storage tank, and metering pump.
Request; On-Site Hypochlorite Generation System incorporates many features and advantages, including:
Passive hydrogen removal increases operator safety
Salt efficiency maximized by variable speed brine pump controlled by current feedback loop
Constant current reliably achieved using an automated variable speed brine pump
Advanced electrolytic cell design precludes the need for wet DC cable connections or internal baffles and gasketing
Skid-mounted unique cell design and union connections allows for simple cell maintenance and replacement
Reliable performance and robust construction reduces operator attention and lowers maintenance costs
Pre-assembled, piped, wired, and tested at the factory prior to shipment
Delivered and installed quickly, with minimal construction and installation cost
With a Proven track record supported by years of successful operational experience
Item 1.
On-Site Hypochlorite Generation System, Skid-Mounted, Pre-Assembled, Piped, Wired, and Factory-Tested, including:
20 ppd Electrolytic Cell (Qty. 4)
Stainless Steel Brine Gear Pump with Integral Speed Control
Water and Brine Rotameters
Magnetic Flow Meter
Optical Level Switch (Qty. 4)
Temperature Switch (Qty. 3)
Temperature Sensor
Water and Brine Makeup Solenoid Valves
304 Stainless Steel, Electropolished Open Frame Equipment Skid
Qty. 1
Item 2.
Skid-Mounted Transformer Rectifier, including:
NEMA 3R Enclosure – 304 Stainless Steel Construction
9.6 kVA Step-Down Transformer - 240VDC @ 40 ADC
DC Bridge Rectifier with Diode Assemblies and Aluminum Heat Sink with Cooling Fan
DC Current Transducer
Panel-Mounted Disconnect Switch
Qty. 1
Item 3.
Skid-Mounted Electrical Control Panel, including:
NEMA 4X Enclosure – 304 Stainless Steel Construction
Allen-Bradley MicroLogix 1400 Programmable Logic Controller with Ethernet Communication
7” Color Touchscreen HMI
24 VDC Power Supply
Emergency Stop Pushbutton
Panel-Mounted Disconnect Switch
Current Sensor
Qty. 1
Item 4.
Hydrogen Dilution Blower, including:
Volumetric Flow Rate: 163 cfm
TEFC Motor
Air Flow Sensor Assembly
Qty. 1
Item 5.
Cartridge Filters
Qty. 3
Item 6.
Dual Tank Water Softener
Qty.1
Item 7.
Brine Storage Tank, including:
Manual Fill
HDLPE Construction
200 Gallon Capacity
Level Control Assembly
Under Drain with Valve
Dimensions: 36” D x 48” H
Qty. 1
Item 8.
Hypochlorite Storage Tank, including:
HDLPE Construction
1300 Gallon Capacity
Radar Level Transmitter
Top Manway
Tank Fittings
Dimensions: 72’-0” D x 87’-0” H
Qty. 1
Item 9.
Hypochlorite Dosing Assembly, including:
Metering Pump, 77.0 GPH @ 130 PSI with TEFC Inverter-Duty Motor
NEMA 4X Variable Frequency Drive
Calibration Column
Pressure Relief Valve
Backpressure Valve
Pulsation Dampener
Wye Strainer
Pressure Gauge
PVC Pump Stand
Qty. 1
Item 10.
Heat Exchanger, including:
4” Shell
Titanium Construction
Teflon and Kynar Interconnection
Qty. 1
Item 11.
Acid Cleaning System – 7 Gallon
Qty. 1
Item 12.
Hydrogen Detector
Conspec CN06
Qty. 1
Item 13.
Manufacturer’s Field Services, including:
Installation Inspection
System Start-Up
Operator Training
Included
Item 14.
Submittal and Operation & Maintenance Manual as Follows:
Submittal: Sent Electronically
O&M Manual: Both Hard Copies and Electronic PDF
Included
Item 15.
FOB Factory, Full Freight to Jobsite, USCG Base Kodiak, AK
Included
Files
| File | Type | Posted |
|---|---|---|
| Far clauses.doc | DOC document | |
| SF1449-12a2.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners