USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams
Closed Solicitation Posted
This opportunity was awarded. See its 3 award notices in the notice history.
- Solicitation number
- W9123822R0055
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KA Construction Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Sacramento District is soliciting bids to strengthen structures on Folsom Dam in California under solicitation number W9123822R0055. Work includes upgrades to the Main Dam spillway gates and structural reinforcements, as well as construction of a concrete floodwall and embankment work on the Left and Right Wing Dams. The objective is to provide system-wide flood damage reduction benefits. Bids will be evaluated using lowest price technically acceptable criteria, with responses due by December 20, 2022. Interested parties can obtain more details on the opportunity by visiting the listed website.
There is no set-aside designated for this opportunity. The estimated value for the construction work is between $100 million and $250 million, to be performed at Folsom Dam in California. Details provided in the sign-in sheets from site visits held in November 2022 include the estimated magnitude for construction work. No current contractors or incumbents are identified, and key project completion timelines are not specified.
Notice text
8 versions
Update #8 · Latest ·
***Amendment 0006 has been posted to piee.eb.mil. Please use the link below to access the amendment and updated attachments.****
Access to Amendment 0006 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0005 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to Amendment 0005 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Sign-in Sheet for second site visit conducted on November 21, 2022, is provided as an attachment below.***
***Amendment 0004 has been posted to piee.eb.mil at the link below. The details of the second site visit are contained within Amendment 0004 and submission of information to attend the second site visit must be received by 2:00pm (Pacific Time) on November 17, 2022.***
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.
The site visit sign-in sheet is attached at the bottom of this announcement.****
Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #7 ·
***Amendment 0005 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to Amendment 0005 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Sign-in Sheet for second site visit conducted on November 21, 2022, is provided as an attachment below.***
***Amendment 0004 has been posted to piee.eb.mil at the link below. The details of the second site visit are contained within Amendment 0004 and submission of information to attend the second site visit must be received by 2:00pm (Pacific Time) on November 17, 2022.***
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.
The site visit sign-in sheet is attached at the bottom of this announcement.****
Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #6 ·
***Sign-in Sheet for second site visit conducted on November 21, 2022, is provided as an attachment below.***
***Amendment 0004 has been posted to piee.eb.mil at the link below. The details of the second site visit are contained within Amendment 0004 and submission of information to attend the second site visit must be received by 2:00pm (Pacific Time) on November 17, 2022.***
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.
The site visit sign-in sheet is attached at the bottom of this announcement.****
Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #5 ·
***Amendment 0004 has been posted to piee.eb.mil at the link below. The details of the second site visit are contained within Amendment 0004 and submission of information to attend the second site visit must be received by 2:00pm (Pacific Time) on November 17, 2022.***
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.
The site visit sign-in sheet is attached at the bottom of this announcement.****
Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #4 ·
***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****
Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.
The site visit sign-in sheet is attached at the bottom of this announcement.****
Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #3 ·
***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.
The site visit sign-in sheet is attached at the bottom of this announcement.****
Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #2 ·
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Update #1 ·
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, 'top seal' structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.
This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*
Files
| File | Type | Posted |
|---|---|---|
| Sign In Sheet for LRWDs at Folsom Dam 21Nov2022.pdf | ||
| Folsom Dam Site Visit Sign-In Sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams | Award Notice | |
| USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams | Award Notice | |
| USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams | Award Notice | |
| This notice | Solicitation | |
| Folsom Spillway Gates and Embankment Modifications | Pre-Solicitation | |
| Folsom Spillway Gates and Embankment Modifications | Pre-Solicitation | |
| Folsom Main, Left Wing and Right Wing Dams | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside | |
| $465M SPK small business MATOC for DBB/DB construction | ENDIST Sacramento | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities