About this opportunity

The U.S. Army Corps of Engineers, New England District has published a Special Notice announcing a Virtual Industry Day for the New Haven Harbor Improvement Dredging project in Connecticut. This industry day is scheduled for May 15, 2025, and is specifically targeted at marine construction industry contractors who may be interested in the upcoming dredging project. The improvement project involves deepening New Haven Harbor's main channel from 35 to 40 feet, widening various channel sections, and lengthening the turning basin, which will require dredging approximately 4.66 million cubic yards of material. New Haven Harbor serves as Connecticut's largest seaport and is located on Long Island Sound, with the existing federal navigation project dating back to 1852 and modified through numerous legislative acts over the decades. The dredged material consists mainly of silt and clays with some fine sand and has been determined suitable for unconfined open water placement and limited beneficial use at local sites.

The primary purpose of this virtual industry day is to seek input from marine construction contractors and provide answers regarding best practices for the technical execution of the improvement project. The event structure includes a project overview presentation from 10:00 am to 12:00 pm, followed by individual 30-minute meetings with the New England Team from 12:30 pm to 3:00 pm, offered on a first-come, first-served basis. Contractors must pre-register by email to Lauren Jacobs by May 12, 2025, providing their name, company, contact information, industry relationship, and attendance count, with telephone requests not accepted. Project information and questions will be provided at least one week before the event date. The notice explicitly states this is not a contract solicitation or promise of future work, and the government assumes no liability for attendee costs, emphasizing that participation is free and serves purely as an informational forum for the specific New Haven Harbor project.

Notice text

4 versions

Update #4 · Latest ·

The U.S. Army Corps of Engineers, New England District would like to invite marine construction industry contractors to our New Haven Harbor Improvement Dredging Virtual Industry Day.

Project Authorization:

New Haven is Connecticut’s largest seaport and is located on the northern shore of Long Island Sound (LIS) on the central Connecticut coast.  The existing Federal navigation project (FNP) was adopted by the Act of 1852 and modified by the Acts of 1870, 1871, 1873, 1875, 1878, 1879, 1882, 1890, 1899, 1902, 1905, 1907, 1910, 1912, 1913, 1930, 1935, 1945, 1946, 1949, 1955, and 1986.  The existing project, as completed in 1950, consists of (1) a 35-foot main channel, 400 to 500 feet wide, widened to 800 feet along the wharves to form a maneuvering basin, (2) a 16-foot anchorage in the upper harbor west of the main channel, (3) a pile and stone dike extending easterly from Sandy Point, (4) 18 and 16-foot channels in the Quinnipiac River, (5) a 12-foot channel in the Mill River, and (6) a 12-foot channel and 6-foot anchorage in the West River.  The project also includes three offshore stone breakwaters totaling about 12,100 feet long providing a refuge in the outer harbor.

The New Haven Harbor Improvement Dredging contract will include deepening the main channel, maneuvering area, and turning basin from -35 to -40 feet, MLLW, widening the existing channel by 100 feet (from 500 feet to 600 feet in the entrance outside the breakwaters and from 400 feet to 500 feet inside the harbor), lengthening the turning basin, and widening the channel bend near the East Breakwater from 560 feet to 800 feet.  These improvements will require dredging about 4.6 million cubic yards (cy) of ordinary improvement material and removing up to 60,000 cy of rock for a total of 4.66 million cy (Volume includes +2 feet of allowable overdepth in areas of regular material and +4 feet of allowable overdepth in areas of rock). Total dredge volumes presented above are subject to change after the 2025 - 2026 maintenance dredging work is completed. The material proposed to be dredged from the harbor is composed of mainly sandy silt and clays with some fine sand in the entrance channel.  The material has been determined to be suitable for unconfined open water placement at the Central Long Island Sound Disposal Site and for beneficial use in a limited capacity at four local sites within the harbor.  The Quinnipiac, Mill, and West Rivers are not part of the improvement effort.

The event will be a virtual project overview presentation followed by meeting time slots to discuss project specifics one-on-one with the New England Team.  The event will take place on June 30, 2025, from 10:00 am to 12:00 pm. Individual meetings will be offered to construction contractors every 30 minutes from 12:30 pm to 3:00 pm that same day. These meetings will be offered on a "first come, first served" basis.  The purpose and focus of the event will be to seek marine construction industry input and answer questions regarding best practices for the technical execution of the improvement project.  A list of questions for bidders to consider and available project information will be provided at least one week ahead of June 30, 2025.  Additional information is available on the New Haven Harbor Industry Day website at https://www.nae.usace.army.mil/Business-With-Us/Contracting/New-Haven-Harbor-Improvement-Project-Industry-Day/ 

All interested attendees must pre-register through the New Haven Industry Day website or by email to Lauren Jacobs (email below) or the Contract Specialist by no later than June 26, 2025.  If interested in participating in the one-on-one meetings after the presentation, please indicate that in your email to register for the event and a time will be assigned based on the available time slots remaining.  Telephone requests will not be accepted.  Registration must include name, company, daytime telephone number, e-mail address, and your relation to the marine construction industry as reason for attendance.  You are requested to provide a count of how many people (from each registered Contractor) will be in attendance.

This is a non-fee event.  This announcement is not a contract solicitation, request for proposal of any sort, a promise to issue any future contract, a forum to discuss upcoming work (other than for the New Haven Harbor Improvement Dredging), or a commitment to offer work of any kind on the part of the Government.  The Government will not assume liability for costs incurred by an attendee.

Point of Contact:
Lauren Jacobs
lauren.a.jacobs@usace.army.mil 

Update #3 ·

The U.S. Army Corps of Engineers, New England District would like to invite marine construction industry contractors to our New Haven Harbor Improvement Dredging Virtual Industry Day.

Project Authorization:

New Haven is Connecticut’s largest seaport and is located on the northern shore of Long Island Sound (LIS) on the central Connecticut coast.  The existing Federal navigation project (FNP) was adopted by the Act of 1852 and modified by the Acts of 1870, 1871, 1873, 1875, 1878, 1879, 1882, 1890, 1899, 1902, 1905, 1907, 1910, 1912, 1913, 1930, 1935, 1945, 1946, 1949, 1955, and 1986.  The existing project, as completed in 1950, consists of (1) a 35-foot main channel, 400 to 500 feet wide, widened to 800 feet along the wharves to form a maneuvering basin, (2) a 16-foot anchorage in the upper harbor west of the main channel, (3) a pile and stone dike extending easterly from Sandy Point, (4) 18 and 16-foot channels in the Quinnipiac River, (5) a 12-foot channel in the Mill River, and (6) a 12-foot channel and 6-foot anchorage in the West River.  The project also includes three offshore stone breakwaters totaling about 12,100 feet long providing a refuge in the outer harbor.

The New Haven Harbor Improvement Dredging contract will include deepening the main channel, maneuvering area, and turning basin from -35 to -40 feet, MLLW, widening the existing channel by 100 feet (from 500 feet to 600 feet in the entrance outside the breakwaters and from 400 feet to 500 feet inside the harbor), lengthening the turning basin, and widening the channel bend near the East Breakwater from 560 feet to 800 feet.  These improvements will require dredging about 4.6 million cubic yards (cy) of ordinary improvement material and removing up to 60,000 cy of rock for a total of 4.66 million cy (Volume includes +2 feet of allowable overdepth in areas of regular material and +4 feet of allowable overdepth in areas of rock). Total dredge volumes presented above are subject to change after the 2025 - 2026 maintenance dredging work is completed. The material proposed to be dredged from the harbor is composed of mainly sandy silt and clays with some fine sand in the entrance channel.  The material has been determined to be suitable for unconfined open water placement at the Central Long Island Sound Disposal Site and for beneficial use in a limited capacity at four local sites within the harbor.  The Quinnipiac, Mill, and West Rivers are not part of the improvement effort.

The event will be a virtual project overview presentation followed by meeting time slots to discuss project specifics one-on-one with the New England Team.  The event will take place on June 30, 2025, from 10:00 am to 12:00 pm. Individual meetings will be offered to construction contractors every 30 minutes from 12:30 pm to 3:00 pm that same day. These meetings will be offered on a "first come, first served" basis.  The purpose and focus of the event will be to seek marine construction industry input and answer questions regarding best practices for the technical execution of the improvement project.  A list of questions for bidders to consider and available project information will be provided at least one week ahead of June 30, 2025.  Additional information is available on the New Haven Harbor Industry Day website at https://www.nae.usace.army.mil/business-with-us/contracting/new-habor-improvement-project-industry-day/ 

All interested attendees must pre-register through the New Haven Industry Day website or by email to Lauren Jacobs (email below) or the Contract Specialist by no later than June 26, 2025.  If interested in participating in the one-on-one meetings after the presentation, please indicate that in your email to register for the event and a time will be assigned based on the available time slots remaining.  Telephone requests will not be accepted.  Registration must include name, company, daytime telephone number, e-mail address, and your relation to the marine construction industry as reason for attendance.  You are requested to provide a count of how many people (from each registered Contractor) will be in attendance.

This is a non-fee event.  This announcement is not a contract solicitation, request for proposal of any sort, a promise to issue any future contract, a forum to discuss upcoming work (other than for the New Haven Harbor Improvement Dredging), or a commitment to offer work of any kind on the part of the Government.  The Government will not assume liability for costs incurred by an attendee.

Point of Contact:
Lauren Jacobs
lauren.a.jacobs@usace.army.mil 

Update #2 ·

**THIS INDUSTRY WILL BE RESCHEDULED. ONCE A DATE IS SET, A NEW NOTICE WILL BE POSTED.**

The U.S. Army Corps of Engineers, New England District would like to invite marine construction industry contractors to our New Haven Harbor Improvement Dredging Virtual Industry Day.

Project Authorization:

New Haven is Connecticut’s largest seaport and is located on the northern shore of Long Island Sound (LIS) on the central Connecticut coast.  The existing Federal navigation project (FNP) was adopted by the Act of 1852 and modified by the Acts of 1870, 1871, 1873, 1875, 1878, 1879, 1882, 1890, 1899, 1902, 1905, 1907, 1910, 1912, 1913, 1930, 1935, 1945, 1946, 1949, 1955, and 1986.  The existing project, as completed in 1950, consists of (1) a 35-foot main channel, 400 to 500 feet wide, widened to 800 feet along the wharves to form a maneuvering basin, (2) a 16-foot anchorage in the upper harbor west of the main channel, (3) a pile and stone dike extending easterly from Sandy Point, (4) 18 and 16-foot channels in the Quinnipiac River, (5) a 12-foot channel in the Mill River, and (6) a 12-foot channel and 6-foot anchorage in the West River.  The project also includes three offshore stone breakwaters totaling about 12,100 feet long providing a refuge in the outer harbor.

The New Haven Harbor Improvement Dredging contract will include deepening the main channel, maneuvering area, and turning basin from -35 to -40 feet, MLLW, widening the existing channel by 100 feet (from 500 feet to 600 feet in the entrance outside the breakwaters and from 400 feet to 500 feet inside the harbor), lengthening the turning basin, and widening the channel bend near the East Breakwater from 560 feet to 800 feet.  These improvements will require dredging about 4.6 million cubic yards (cy) of ordinary improvement material and removing up to 60,000 cy of rock for a total of 4.66 million cy (Volume includes +2 feet of allowable overdepth in areas of regular material and +4 feet of allowable overdepth in areas of rock). Total dredge volumes presented above are subject to change after the 2025 - 2026 maintenance dredging work is completed. The material proposed to be dredged from the harbor is composed of mainly silt and clays with some fine sand in the entrance channel.  The material has been determined to be suitable for unconfined open water placement and for beneficial use in a limited capacity at four local sites.  The Quinnipiac, Mill, and West Rivers are not part of the improvement effort.

The event will be a virtual project overview presentation followed by meeting time slots to discuss project specifics one-on-one with the New England Team.  The event will take place on May 15, 2025, from 10:00 am to 12:00 pm. Individual meetings will be offered to construction contractors every 30 minutes from 12:30 pm to 3:00 pm that same day. These meetings will be offered on a "first come, first served" basis.  The purpose and focus of the event will be to seek marine construction industry input and answer questions regarding best practices for the technical execution of the improvement project.  A list of questions and available project information will be provided at least one week ahead of May 15, 2025.

All interested attendees must pre-register by e-mail to Lauren Jacobs (email below) or the Contract Specialist by no later than May 12, 2025.  If interested in participating in the one-on-one meetings after the presentation, please indicate that in your email to register for the event and a time will be assigned based on the available time slots remaining.  Telephone requests will not be accepted.  Registration must include name, company, daytime telephone number, e-mail address, and your relation to the marine construction industry as reason for attendance.  You are requested to provide a count of how many people (from each registered Contractor) will be in attendance.

This is a non-fee event.  This announcement is not a contract solicitation, request for proposal of any sort, a promise to issue any future contract, a forum to discuss upcoming work (other than for the New Haven Harbor Improvement Dredging), or a commitment to offer work of any kind on the part of the Government.  The Government will not assume liability for costs incurred by an attendee.

Point of Contact:
Lauren Jacobs
lauren.a.jacobs@usace.army.mil
 

Update #1 ·

The U.S. Army Corps of Engineers, New England District would like to invite marine construction industry contractors to our New Haven Harbor Improvement Dredging Virtual Industry Day.

Project Authorization:

New Haven is Connecticut’s largest seaport and is located on the northern shore of Long Island Sound (LIS) on the central Connecticut coast.  The existing Federal navigation project (FNP) was adopted by the Act of 1852 and modified by the Acts of 1870, 1871, 1873, 1875, 1878, 1879, 1882, 1890, 1899, 1902, 1905, 1907, 1910, 1912, 1913, 1930, 1935, 1945, 1946, 1949, 1955, and 1986.  The existing project, as completed in 1950, consists of (1) a 35-foot main channel, 400 to 500 feet wide, widened to 800 feet along the wharves to form a maneuvering basin, (2) a 16-foot anchorage in the upper harbor west of the main channel, (3) a pile and stone dike extending easterly from Sandy Point, (4) 18 and 16-foot channels in the Quinnipiac River, (5) a 12-foot channel in the Mill River, and (6) a 12-foot channel and 6-foot anchorage in the West River.  The project also includes three offshore stone breakwaters totaling about 12,100 feet long providing a refuge in the outer harbor.

The New Haven Harbor Improvement Dredging contract will include deepening the main channel, maneuvering area, and turning basin from -35 to -40 feet, MLLW, widening the existing channel by 100 feet (from 500 feet to 600 feet in the entrance outside the breakwaters and from 400 feet to 500 feet inside the harbor), lengthening the turning basin, and widening the channel bend near the East Breakwater from 560 feet to 800 feet.  These improvements will require dredging about 4.6 million cubic yards (cy) of ordinary improvement material and removing up to 60,000 cy of rock for a total of 4.66 million cy (Volume includes +2 feet of allowable overdepth in areas of regular material and +4 feet of allowable overdepth in areas of rock). Total dredge volumes presented above are subject to change after the 2025 - 2026 maintenance dredging work is completed. The material proposed to be dredged from the harbor is composed of mainly silt and clays with some fine sand in the entrance channel.  The material has been determined to be suitable for unconfined open water placement and for beneficial use in a limited capacity at four local sites.  The Quinnipiac, Mill, and West Rivers are not part of the improvement effort.

The event will be a virtual project overview presentation followed by meeting time slots to discuss project specifics one-on-one with the New England Team.  The event will take place on May 15, 2025, from 10:00 am to 12:00 pm. Individual meetings will be offered to construction contractors every 30 minutes from 12:30 pm to 3:00 pm that same day. These meetings will be offered on a "first come, first served" basis.  The purpose and focus of the event will be to seek marine construction industry input and answer questions regarding best practices for the technical execution of the improvement project.  A list of questions and available project information will be provided at least one week ahead of May 15, 2025.

All interested attendees must pre-register by e-mail to Lauren Jacobs (email below) or the Contract Specialist by no later than May 12, 2025.  If interested in participating in the one-on-one meetings after the presentation, please indicate that in your email to register for the event and a time will be assigned based on the available time slots remaining.  Telephone requests will not be accepted.  Registration must include name, company, daytime telephone number, e-mail address, and your relation to the marine construction industry as reason for attendance.  You are requested to provide a count of how many people (from each registered Contractor) will be in attendance.

This is a non-fee event.  This announcement is not a contract solicitation, request for proposal of any sort, a promise to issue any future contract, a forum to discuss upcoming work (other than for the New Haven Harbor Improvement Dredging), or a commitment to offer work of any kind on the part of the Government.  The Government will not assume liability for costs incurred by an attendee.

Point of Contact:
Lauren Jacobs
lauren.a.jacobs@usace.army.mil
 

Similar open opportunities

Opportunity Agency Set-aside Responses due
Virtual Industry Day for FY27 USACE Enterprise Dredge Delivery Center National Small Business MATOC Wilmington, North Carolina 28401, United States · NAICS 237990 ENDIST Wilmington Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors