US Forest Service_ Delta National Forest 717 Culvert Replacement
Awarded Award Notice Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 12445122Q0001
- Agency
- Forest Service Department of Agriculture
- Awarded
- to Anderson Contracting LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 12445122C0003 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Yazoo City, Mississippi 39194, United States
Notice details come from SAM.gov. Updated .
Notice text
This Request for Quote (RFQ) is issued pursuant to FAR 13 by the United States Department of Agriculture
(USDA), Forest Service (FS), on behalf of the Delta National Forest, Holly Bluff, Mississippi. (Sharkey County 39088).
Type of Contract: This is an Invitation for Bid (IFB) which will result in award of a firm-fixed price contract. Award will
be made to the lowest priced responsive/responsible bidder.
Set Aside: The project is set-aside 100% for small businesses.
The associated NAICS of this acquisition is 237310 - Highway, Street, and Bridge Construction.
PSC Code Z2LB - Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways
Magnitude: In accordance with FAR 36.204, the magnitude of this project is: magnitude of this project is: (c)
Between $100,000 and $250,000
Location: Project Name and Location: Project Name and Location: The project location is 2.5 miles west of Holly
Bluff, Mississippi. (Sharkey County 39088).
32.831348, -90.759575 ;
https://www.google.com/maps/place/32%C2%B049'52.9%22N+90%C2%B045'34.5%22W/@32.831353,-90.7596206,100m/d
90.7083136!3m5!1s0x0:0x0!7e2!8m2!3d32.8313479!4d-90.7595746?hl=en
Scope of Work: The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and
supervision required to complete the work per the plans, specifications, and terms of the contract. See the SOW for
specific details not included under this paragraph
This project will replace two 60” x 40’ corrugated metal pipe culverts with two 60” x 68’ 16 gage polymer coated
corrugated metal pipe culverts on Road 717 on the Delta National Forest. Road 717, an aggregate surfaced road, is
located on the county line between Sharkey and Yazoo Counties, Mississippi. Four culverts in the roadside ditches
will be replaced to provide access to the adjacent land. The basins at each end of the 60” culverts will be armored
with riprap and new 30” X 50’ roadside ditch culverts will be installed to empty into those basins. The project location
is 2.5 miles west of Holly Bluff, Mississippi.
Remove the existing culverts and properly dispose of them off national forest property. Remove the existing gate and
posts to the northwest of the culverts, taking care not to damage them, and place them in the adjacent wooded area
outside the construction limits. Install the 60” culverts at the same alignment as the existing culverts (about a 6° left
forward skew looking north), with invert elevations as shown on the plans. Install the 30” roadside ditch culverts as
shown in the plans. Supplement the suitable excavated material with select borrow as needed and backfill the
culverts as shown on the plans. Armor the inlet and outlet basins as shown in the plans with 200 lb. riprap over
geotextile filter fabric. Any excavated material not suited for backfill is to be properly disposed of off national forest
property.
Place a 6” compacted layer of #610 (crusher run) crushed limestone aggregate over the excavated area of the
roadbed to a width of 16’. Grade the edges to pull all aggregate back into the travel way and leave a straight, uniform
edge, and grade the aggregate to create a smooth, uniform surface and compact. There will be no surfacing over the
30” culverts.
On all disturbed areas, spread Bahia grass seed at the rate of 20 pounds per acre, 13-13-13 fertilizer at 500 pounds
per acre, and straw mulch at 3,200 pounds per acre. No tackifier is required on the mulch. If seeding is done from
September 15 to March 15, in addition to the above spread rye grass seed at the rate of 80 pounds per acre.
Applicable specifications may be found in FHWA’s FP-14 and the attached supplemental specifications.
Benchmark: N.I.B. 8” Red Oak tree, 105’ NW of the intersection of the CL of the road and CL of the existing culverts.
Elevation = 89.56’.
Dates: Issuance of the Request for Quotation (RFQ) 11/01/2021;
Award Date 12/15/2021
Completion Date 90 Days after NTP
Awarded contract 12445122C0003 to Anderson Contracting L.L.C. for 102367.00 on 2021-12-15.
Notice history
| Notice | Type | Posted |
|---|---|---|
| US Forest Service_ Ouachita National Forest HVAC Unit Replacement | Solicitation | |
| US Forest Service_ Ouachita National Forest HVAC Unit Replacement | Pre-Solicitation | |
| US Forest Service_ Delta National Forest 717 Culvert Replacement | Award Notice | |
| US Forest Service_ Delta National Forest 717 Culvert Replacement | Solicitation | |
| US Forest Service_ Delta National Forest 717 Culvert Replacement | Pre-Solicitation |