Upgrade intensifier hydraulic controls

Closed Pre-Solicitation Posted

Solicitation number
W911PT19Q0133
Agency
TACOM Life Cycle Management Command Army Materiel Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
Not on record
Place of performance
1 Buffington St Watervliet, New York 12189, United States

Notice details come from SAM.gov. Updated .

Notice text

STATEMENT OF WORK (SOW)

FOR


UPGRADE INTENSIFIER HYDRAULIC CONTROLS


AT
Watervliet Arsenal


W16H1F921300V0
Support Division (TAWV-ODR)



PART 1 GENERAL


1.01 Overview.
A. This Statement of Work (SOW) defines the effort required to Upgrade the Intensifier Hydraulic Controls.


1.02 Hours of Operation.
A. Normal duty hours are 7:00 AM through 4:30 PM, Monday through Thursday, and 7:00 AM through 3:30 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.


1.03 General Requirements.
A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:
http://www.wva.army.mil/Documents/Contracting/WAIC.pdf
B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.


1.04 Safety Requirements.
A. General.
1. The contractor shall be responsible for complying with all DOD, Army, Federal, and State health and safety requirements which are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.



1.05 Applicable Documents.
A. Watervliet Arsenal Instructions for Contractors (WAIC).
B. All applicable OSHA, CMAA and ASME Specifications and Standards
C. NFPA 70 - National Electric Code (NEC), NFPA 33, OSHA 1910.107.
1. (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014).



PART 2 ITEMS OF WORK


A. General.
STATEMENT OF WORK
2.01 Upgrade Intensifier Hydraulic Controls.
A. Work needs to be accomplished in two (2) stages. :
1. First stage is to make necessary changes to system to be able to implement the desired control scheme:
a. Add logic to enable dwell at operator selected pressure
b. Add logic to enable pausing the pressurization at intermediate pressures
c. Add logic to provide entry and display of parameters in SI Units
d. Provide automatically adjusted flow rate to taper pressure rate as pressure approaches target
pressure.
e. Provide additional method to control target pressure via feedback loop and flow control.
f. Add HMI graphic display which consolidates the controls and information related to the test
sequence.
g. Update documentation including data collection and trending functions.
h. No changes to the Dump Valve, Preload, Aux and Jack Press subsystems.
2. Second stage is equipment changes to improve performance: Replacment of the Autofrettage PLC
CPU, communications adapters and associated software.
3. Equipment is to be tested with WVA personnel to ensure proper operation.
4. Contractor will provide training to WVA personnel on proper operation of system.
5. Contractor to provide updated system drawings and updated operator manual. Documents to be
provided in both paper and electronic format.
6. 1 year warranty support to be provided for all material and software.


PART 3 Background:
3.01


PART 4 Applicable Documents: None


PART 5 Scope/Objective:
PART 6


PART 7 Requirements:



PART 8


PART 9


.

Attachments

Files attached to this notice, newest first
File Type Posted
19Q0133_AMD_1.pdf PDF
19Q0133.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity