United States Marine Corps effort for systems capability upgrades to Live training Gaps within the Squad Immersive Training Environment.

Award Notice Posted

Solicitation number
M6785413R7802
Agency
Awarded
to Cubic Defense Applications, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
M6785413C7802 Federal contract award
PSC
Not on record
Place of performance
Orlando, Florida 32826, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

United States Marine Corps effort for systems capability upgrades to Live training Gaps within the Squad Immersive Training Environment (SITE). The Live training toolkit baseline system is Instrumented Tactical Engagement Simulation System II (I-TESS II). The capability enhancements are not currently available within the I-TESS II toolkit. This effort includes all Program Management, Engineering, Testing, and Logistics tasks associated with developing the capability upgrades. In addition to the development of the system capabilities a verification of the training systems to meet the SITE capability gaps will be conducted upon completion of development. The system upgrades will conform to the Instrumented- Multiple Integrated Laser Engagement System (I-MILES) specification and ensure compliance with the Common Training Instrumentation Architecture (CTIA). CTIA is the foundational architecture for the Live Training Transformation Family of Training Systems (LT2-FTS) strategy. CTIA consists of standard architecture services, components and protocols, and it facilitates commonality across the various training instrumentation systems and interoperability across Live, Virtual and Constructive (LVC) and joint training environments. The Government seeks suitable commercial items, developmental items, or commercial items that can be easily modified to meet existing Government requirements.

The SITE specific capability enhancements are as follow:
1. Mortars - Integrate mortar firing capability, paring sensors, ballistic computer, and forward observer device (M224, 60mm and M252, 81mm) into baseline system.
2. Assault-Squads - Integrated MK153 shoulder launched multipurpose assault weapon (SMAW) simulator capability, paring sensors, day/night sighting, and back blast mechanism (non-pyrotechnic) into baseline system.
3. Anti-Armor - Integrated M220 TOW and M98A1 Javelin simulator capabilities and paring sensors into baseline system.
4. Machine Guns - Integrated MK 19 Instrumented Weapon System (IWS) simulator, Small Arms Transmitter (SAT) and paring sensors into baseline system.
5. Close Air Support - Provide a Forward Observer capability to effectively simulate call for fire and provide visual cues to the effect of the munitions. The effect will illustrate persistent CAS weapons impacts. The capability will include audio recordings at the tactical radio for use in the AAR into the baseline system.
6. Sniper Marksmanship - Integrated M107 long range sniper rifle (LRSR) and M110 semi-automatic sniper system (SASS)- SAT Sniper rifle capability, paring sensors and the Forward Observers use of existing Fire Control Devices while minimizing laser safety issues into baseline the system.


The Solicitation package has been added in this amendment dated 27 December 2012 which changed the M6785413R7802 Notice from Presolicitation to Solicitation.  The attached RFP zip file includes the RFP document M6785413R7802 and all Section J Attachments J.1 through J.11.  All questions in response to the RFP are to be directed in writing, using the Attachment J.9 Question and Response Form, to Ms. Janet Fondriest, Contract Specialist, at janet.fondriest@usmc.mil and Ms. Koren Odermann, Deputy Product Manager for Instrumentation Training Systems, at koren.odermann@usmc.mil.  No phone calls will be accepted.  The RFP proposal response date is  28 January 2013 by 12:00 p.m. EST.  

The previously attached DRAFT RFP zip file was posted on FedBizOps on October 29, 2012 under number M6785413R7802 and included the Draft Statement of Work, Draft CDRLs, Draft Sections B, L and M. A Question and Response Form was also included. Industry was encouraged to provide comments/feedback based on the attached documentation provided for review. This DRAFT RFP did not constitute a solicitation and was not to be construed as a commitment of any kind by the US Government to issue a solicitation or ultimately award a contract. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of contractor submission of responses to this notice or the Government's use of such information. The Government reserves the right to reject, in whole or in part, any contractor's input resulting from this notice. No contract will be awarded from this announcement. Data submitted in response to this notice will not be returned. Information is being requested in order to refine any potential future requirements. 

All questions in response to the DRAFT RFP were to be directed in writing, using the attached Question and Response Form, to Ms. Janet Fondriest at janet.fondriest@usmc.mil and Ms. Koren Odermann at koren.odermann@usmc.mil.  The response date for the Draft RFP was 12 November 2012.

The Sources Sought Notice for this effort was posted on FedBizOps on June 12, 2012 under number M67854R127816. The Sources Sought Notice and affiliated Interested Vendors List is attached for your convenience. The Solicitation number has changed to M6785413R7802 due to the change in fiscal year. All future correspondence associated with this effort will be posted under M6785413R7802.

Update #2 ·

United States Marine Corps effort for systems capability upgrades to Live training Gaps within the Squad Immersive Training Environment (SITE). The Live training toolkit baseline system is Instrumented Tactical Engagement Simulation System II (I-TESS II). The capability enhancements are not currently available within the I-TESS II toolkit. This effort includes all Program Management, Engineering, Testing, and Logistics tasks associated with developing the capability upgrades. In addition to the development of the system capabilities a verification of the training systems to meet the SITE capability gaps will be conducted upon completion of development. The system upgrades will conform to the Instrumented- Multiple Integrated Laser Engagement System (I-MILES) specification and ensure compliance with the Common Training Instrumentation Architecture (CTIA). CTIA is the foundational architecture for the Live Training Transformation Family of Training Systems (LT2-FTS) strategy. CTIA consists of standard architecture services, components and protocols, and it facilitates commonality across the various training instrumentation systems and interoperability across Live, Virtual and Constructive (LVC) and joint training environments. The Government seeks suitable commercial items, developmental items, or commercial items that can be easily modified to meet existing Government requirements.

The SITE specific capability enhancements are as follow:
1. Mortars - Integrate mortar firing capability, paring sensors, ballistic computer, and forward observer device (M224, 60mm and M252, 81mm) into baseline system.
2. Assault-Squads - Integrated MK153 shoulder launched multipurpose assault weapon (SMAW) simulator capability, paring sensors, day/night sighting, and back blast mechanism (non-pyrotechnic) into baseline system.
3. Anti-Armor - Integrated M220 TOW and M98A1 Javelin simulator capabilities and paring sensors into baseline system.
4. Machine Guns - Integrated MK 19 Instrumented Weapon System (IWS) simulator, Small Arms Transmitter (SAT) and paring sensors into baseline system.
5. Close Air Support - Provide a Forward Observer capability to effectively simulate call for fire and provide visual cues to the effect of the munitions. The effect will illustrate persistent CAS weapons impacts. The capability will include audio recordings at the tactical radio for use in the AAR into the baseline system.
6. Sniper Marksmanship - Integrated M107 long range sniper rifle (LRSR) and M110 semi-automatic sniper system (SASS)- SAT Sniper rifle capability, paring sensors and the Forward Observers use of existing Fire Control Devices while minimizing laser safety issues into baseline the system.


The attached DRAFT RFP zip file includes the Draft Statement of Work, Draft CDRLs, Draft Sections B, L and M. A Question and Response Form is also included. Industry is encouraged to provide comments/feedback based on the attached documentation provided for review. This DRAFT RFP does not constitute a solicitation and should not be construed as a commitment of any kind by the US Government to issue a solicitation or ultimately award a contract. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of contractor submission of responses to this notice or the Government's use of such information. The Government reserves the right to reject, in whole or in part, any contractor's input resulting from this notice. No contract will be awarded from this announcement. Data submitted in response to this notice will not be returned. Information is being requested in order to refine any potential future requirements.

The Sources Sought Notice for this effort was posted on FedBizOps on June 12, 2012 under number M67854R127816. The Sources Sought Notice and affiliated Interested Vendors List is attached for your convenience. The Solicitation number has changed to M6785413R7802 due to the change in fiscal year. All future correspondence associated with this effort will be posted under M6785413R7802.


Industry comments/feedback and questions concerning the DRAFT RFP attached documents shall be directed in writing, using the attached Question and Response Form, to Ms. Janet Fondriest, Contract Specialist, at janet.fondriest@usmc.mil and Ms. Koren Odermann, Deputy Product Manager for Instrumentation Training Systems, at koren.odermann@usmc.mil. Industry feedback is requested by the Response date of 12 November 2012.  No phone calls will be accepted.

Update #1 ·

United States Marine Corps effort for systems capability upgrades to Live training Gaps within the Squad Immersive Training Environment (SITE). The Live training toolkit baseline system is Instrumented Tactical Engagement Simulation System II (I-TESS II). The capability enhancements are not currently available within the I-TESS II toolkit. This effort includes all Program Management, Engineering, Testing, and Logistics tasks associated with developing the capability upgrades. In addition to the development of the system capabilities a verification of the training systems to meet the SITE capability gaps will be conducted upon completion of development. The system upgrades will conform to the Instrumented- Multiple Integrated Laser Engagement System (I-MILES) specification and ensure compliance with the Common Training Instrumentation Architecture (CTIA). CTIA is the foundational architecture for the Live Training Transformation Family of Training Systems (LT2-FTS) strategy. CTIA consists of standard architecture services, components and protocols, and it facilitates commonality across the various training instrumentation systems and interoperability across Live, Virtual and Constructive (LVC) and joint training environments. The Government seeks suitable commercial items, developmental items, or commercial items that can be easily modified to meet existing Government requirements.

The SITE specific capability enhancements are as follow:
1. Mortars - Integrate mortar firing capability, paring sensors, ballistic computer, and forward observer device (M224, 60mm and M252, 81mm) into baseline system.
2. Assault-Squads - Integrated MK153 shoulder launched multipurpose assault weapon (SMAW) simulator capability, paring sensors, day/night sighting, and back blast mechanism (non-pyrotechnic) into baseline system.
3. Anti-Armor - Integrated M220 TOW and M98A1 Javelin simulator capabilities and paring sensors into baseline system.
4. Machine Guns - Integrated MK 19 Instrumented Weapon System (IWS) simulator, Small Arms Transmitter (SAT) and paring sensors into baseline system.
5. Close Air Support - Provide a Forward Observer capability to effectively simulate call for fire and provide visual cues to the effect of the munitions. The effect will illustrate persistent CAS weapons impacts. The capability will include audio recordings at the tactical radio for use in the AAR into the baseline system.
6. Sniper Marksmanship - Integrated M107 long range sniper rifle (LRSR) and M110 semi-automatic sniper system (SASS)- SAT Sniper rifle capability, paring sensors and the Forward Observers use of existing Fire Control Devices while minimizing laser safety issues into baseline the system.


The attached DRAFT RFP zip file includes the Draft Statement of Work, Draft CDRLs, Draft Sections B, L and M. A Question and Response Form is also included. Industry is encouraged to provide comments/feedback based on the attached documentation provided for review. This DRAFT RFP does not constitute a solicitation and should not be construed as a commitment of any kind by the US Government to issue a solicitation or ultimately award a contract. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of contractor submission of responses to this notice or the Government's use of such information. The Government reserves the right to reject, in whole or in part, any contractor's input resulting from this notice. No contract will be awarded from this announcement. Data submitted in response to this notice will not be returned. Information is being requested in order to refine any potential future requirements.

The Sources Sought Notice for this effort was posted on FedBizOps on June 12, 2012 under number M67854R127816. The Sources Sought Notice and affiliated Interested Vendors List is attached for your convenience. The Solicitation number has changed to M6785413R7802 due to the change in fiscal year. All future correspondence associated with this effort will be posted under M6785413R7802.


All questions shall be directed in writing, using the attached Question and Response Form, to Ms. Janet Fondriest, Contract Specialist, at janet.fondriest@usmc.mil and Ms. Koren Odermann, Deputy Product Manager for Instrumentation Training Systems, at koren.odermann@usmc.mil. No phone calls will be accepted.

Files

File Type Posted
J.1_M6785413R7802_SITE_LIVE_Core_System_Upgrades_SOW_15_Jan_2013.pdf PDF
RFP_M6785413R78020002.pdf PDF
J.12_M6785413R7802_Q_ _A__0001-0032_24_Jan_2013.pdf PDF
J.11_M6785413R7802_Cross_Reference_Matrix_15_Jan_13.xlsx XLSX spreadsheet
J.7_M6785413R7802_CDRLS_F001_to_F002_15_Jan_13.pdf PDF
RFP_M6785413R78020001.pdf PDF
J.4_M6785413R7802_CDRLS B001 to B004.pdf PDF
J.9_ M6785413R7802_Solicitation Question Response Form_15 Nov 2012.doc DOC document
J.10_M6785413R7802_Section B Pricing Worksheet_12.06.2012.xls XLS spreadsheet
J.8_M6785413R7802_ Past Performance Questionnaire_06Dec12.pdf PDF
J.7_M6785413R7802_CDRLS F001 to F002.pdf PDF
J.6_M6785413R7802_CDRLS E001 to E002.pdf PDF
J.11_M6785413R7802_Cross Reference Matrix_12.05.2012.xls XLS spreadsheet
J.5_M6785413R7802_CDRLS C001 to C004.pdf PDF
J.2_M6785413R7802_I-TESS II Specification_13FEB2012.pdf PDF
RFP_M6785413R7802_12.27.2012.pdf PDF
J.3_M6785413R7802_CDRLS A001 to A00B.pdf PDF
J.1_M6785413R7802_SITE LIVE Core System Upgrades_SOW_05 Dec 2012.pdf PDF
Draft RFP M67854-13-R-7802_Draft C CDRLS.pdf PDF
Draft RFP M67854-13-R-7802_Draft SECTION_M_10-29-2012.pdf PDF
Draft RFP M6785413-R-7802_Solicitation Question Response Form.doc DOC document
Draft RFP M67854-13-R-7802_Draft E CDRLS.pdf PDF
Draft RFP M67854-13-R-7802_Draft Section L_26Oct12.pdf PDF
M67854R127816_Sources_Sought_Notice_and_Interested_Vendors_List_06.12.2012.pdf PDF
Draft RFP M67854-13-R-7802_Draft Section B.pdf PDF
Draft RFP M67854-13-R-7802_Draft B CDRLS.pdf PDF
Draft RFP M67854-13-R-7802_Draft A CDRLS.pdf PDF
Draft RFP M67854-13-R-7802_Draft SOW_22Oct12.pdf PDF
Draft RFP M67854-13-R-7802_Draft F CDRLS.pdf PDF
Show all 29

Notice history

Notice Type Posted
United States Marine Corps effort for systems capability upgrades to Live training Gaps within the Squad Immersive Training Environment. Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors