Unique Modular, High Power, Cascadable Amplifier for support of EMP Direct Drive Testing

Closed Solicitation Posted

Solicitation number
AF172-006
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
AC12 National Defense R&D Services; Department Of Defense - Military; Applied Research
More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

Notice text

DoD SBIR topic AF172-006

Component: USAF

Command: AFSC-TINKER

Phase: SBIR Program Phase I Action

Technology Areas: Battlespace; Electronics; Sensors

Keywords: EMP Direct Drive Testing; EMP Survivability; Hardness assessment testing

Objective:

Determine feasibility and develop concepts for a high power, modular amplifier design to support wideband (10 kHz–2 GHz), with minimum 10 kW Average Power, and capability to drive load impedances from short to open circuits for Direct Drive testing.

Description:

Current requirements for EMP survivability and hardness assessment testing as defined in MIL-STD-3023, “High-Altitude Electromagnetic Pulse (HEMP) Protection For Military Aircraft” (21 November 2011) include Direct Drive techniques in support of both Threat-level and Low Level Hardness Maintenance/Hardness Surveillance. The waveforms used for this testing are derived from the NORMs of threat-relatable responses and are used to drive candidate test points to levels above the margins defined for the Category I, II, & III aircraft. The Direct Drive testing approaches in MIL-STD-3023 require that these waveforms be driven with an amplifier with supporting -3 dB bandwidth of 10 kHz – 2 GHz, the amplifier must be able to source at least 10 kW average power, and must be able to drive load impedances which are not always known, but can vary from a short (0 ohms) to an open (> 10 M ohms) circuit, without damage to the amplifier or perturbation of the driven waveform. The minimum -3 dB bandwidth specified in the MIL-STD-3023 is 100 kHz to 1 GHz; but engineering design requirements must include the specification of a decade lower -3 dB point on the low end and an octave higher -3 dB point on the upper end to insure that the minimum specification is met by the amplifier. In the case of perturbation of the driven waveform, an external, real-time feedback and control system is required to adjust the waveform to compensate for the changes due to impedance variations (the additional component needed in the Phase II), but the amplifier must be able to drive the test point with the same energy regardless of impedance changes. These changes can occur as the drive levels are stepped up per the guidelines in the MIL-Std-3023, due to non-linear protection devices becoming active, causing the driven impedance to vary instantly from a nominal impedance of 50-100 ohms to a near zero ohms (short) condition. This condition causes an extremely high VSWR for the length of the waveform. Normally, an amplifier will either shut down or sustain damage under these conditions. There are no existing Commercial-off-the-shelf products that will support these requirements without exhibiting this shutdown or damage, thereby leaving a shortfall in the ability to satisfy the requirements of the referenced MIL-Standard and determine hardness/survivability of military tactical and strategic air vehicle systems. For Phase I, define and develop the amplifier technology concepts necessary to meet these requirements for MIL-STD-3023 Direct Drive testing and provide the initial layout and capabilities to build the amplifier unit and supporting Direct Drive feedback and control subsystems in Phase II.

Phase I:

Research and develop a concept demonstration that addresses the above requirements. A Phase I final report will provide results of how the demonstration met the requirements and address the boarder scope capability for a Phase II effort.

Phase II:

Based on a successful demonstrated concept, develop a pilot prototype that meets the requirements of this topic. A Phase II final report will document the results and provide transition plans needed to implement into production capability.

Phase III:

Implementation of a prototype system that meets the needs of the topic above. Provide documentation and a plan for any further development required and maintenance of the final product.

Files

File Type Posted
AF172-006.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors