Two new PT6A-60A Engines to support the King Air 3

Closed Solicitation Posted

Solicitation number
1305M225Q0217
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

More information

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic and Atmospheric Administration (NOAA) is procuring aircraft engines to support critical mission operations under the FY25 Aircraft Allocation Plan. The solicitation seeks two new PT6A-60A engines for the King Air 350/360 aircraft fleet and two overhauled PT6A-27 engines with core exchanges for the DHC-6 Twin Otter aircraft fleet. These engines are essential for maintaining fleet sustainability and preventing aircraft downtime that could impact NOAA's operational readiness and life-saving missions. The vendor must be capable of supplying newly overhauled engines with zero hours Time Since Overhaul (TSO) and provide delivery within six months of contract award, with preference for earlier delivery. The solicitation was posted on August 22, 2025, with responses due by August 29, 2025, providing vendors with only one week to submit proposals.

This procurement does not utilize any set-aside designations and falls under NAICS code 336412 for Aircraft Engine and Engine Parts Manufacturing. The contract requires delivery of engines to AOC's facility in Lakeland, Florida, where they will be maintained in inventory to support both scheduled and unscheduled maintenance operations. The procurement specifically calls for four engines total: two PT6A-60A engines and two PT6A-27 engines, all delivered through core exchange arrangements. The solicitation emphasizes the critical nature of these engines in supporting NOAA's Aircraft Allocation Plan, which directly impacts the agency's ability to protect life and property through its aviation operations. No incumbent contractors or specific budget ranges are mentioned in the available solicitation details.

Notice text

AOC requires the procurement of Two new PT6A-60A Engines to support the King Air 350/360 aircraft fleet, ensuring long-term fleet sustainability and alignment with the Aircraft Allocation Plan (AAP). AOC also requires the procurement of Two PT6A-27 Overhauled Engine with Core Exchanges to support the DHC-6 Twin Otter aircraft fleet, ensuring long-term fleet sustainability and alignment with the Aircraft Allocation Plan (AAP).

Requirements

NOAA's King Air aircraft support the FY25 Aircraft Allocation Plan (AAP), which has a direct impact on protecting life and property. At present, AOC does not have any spare PT6A-60A engine available in its inventory. To ensure mission continuity, fleet sustainability, and minimize the risk of aircraft downtime due to scheduled or unscheduled maintenance, AOC requires the procurement of at least two (2) overhauled PT6A-60A engines. Establishing engine availability is critical to preventing potential part shortages and delays that could impact NOAA’s operational readiness. NOAA's Twin Otter aircraft support the FY25 Aircraft Allocation Plan (AAP), which has a direct impact on protecting life and property. To maintain operational readiness and ensure fleet sustainability, AOC requires two (2) additional overhauled PT6A-27 engines (0 TSO) through core exchange. This replenishment is essential to support both scheduled and unscheduled engine maintenance events. A lack of spare engines poses a significant risk to mission capability and may result in extended aircraft downtime, delaying critical NOAA operations.

AOC requires a vendor capable of supplying two newly overhauled PT6A-60A and newly overhauled PT6A-27 engines (0 hours Time Since Overhaul) on a core exchange basis engines, with delivery required within six (6) months of contract award—preferably as soon as practical. The engines will be shipped to AOC in Lakeland, FL, for on-site inventory storage to support scheduled and unscheduled maintenance.

Delivery Date

NOAA requires the engine to be delivered upon availability, no later than 6 months from contract award. Estimated award and purchase in FY25 Q3 or Q4.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Procurement of Pratt & Whitney Fuel Control Unit NAICS 336412 National Oceanic and Atmospheric Administration Total Small Business
Nozzle assembly, TUR NAICS 336412 Aviation No set-aside
Support, turbine NOZ NAICS 336412 Aviation No set-aside
Seal, air, aircraft G NAICS 336412 Aviation No set-aside
Support, turbine NOZ NAICS 336412 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors