Trail River Bridge Wearing Surface Repair

Closed Pre-Solicitation Posted

Solicitation number
1240BJ23Q0024
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Moose Pass, Alaska, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Synopsis of Proposed Contract Action

TRAIL RIVER BRIDGE WEARING SURFACE

Kenai Peninsula, Alaska

THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES.

This notice is for the issuance of a blanket purchase agreement call request on the “Region 10 Maintenance and Construction BPA (1240BH23Q0002)

This is a competitive request for quotes under a previously issued BPA.

We are not looking to add new contractors to the BPA at this time.

--------------------------------------------------------------------------------------------------------------------

Action Code: Presolicitation

Date: May 18, 2023

Contracting Office Address:

Procurement and Property Services,

Field Procurement Operations,

Northwest Procurement Zone

Product or Service Code:  Z2LB

NAICS Code:  237310

Proposed Solicitation Number: 1240BJ23Q0024

Closing Response Date: June 2, 2023

Contact Point or Contracting Officer:  Roxanne Anderson

Place of contract performance:  Kenai Peninsula, Alaska

Description:

This project is for bridge decking removal services on the Forest Service Trail River Bridge on the Seward Ranger Districts in Southcentral Alaska within the Kenai Peninsula Borough. Performance for this requirement includes cleaning all debris from the running surface and removal of wear surface running planks.   

The Government will not exercise any supervision or control over the contract service providers performing the services herein.  Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

    1. Outline of Services:  The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS).
    1. Project Location: The project work is located approximately mile 0.4 of Trail River Road, South of Moose Pass, Alaska, Mile post 24.2 of the Seward Highway.
    1. Background:  The Trail River Bridge is approximately 140’3” long with a 22’1” clear width between curbs. This bridge provides access to the Forest Service Campground on the west side of Trail River. The current wear surface has been exposed to weather and traffic, and as a result has become deteriorated and in some locations, exposing the spike nails used as fasteners.
Update #1 ·

Synopsis of Proposed Contract Action

TRAIL RIVER BRIDGE WEARING SURFACE

Kenai Peninsula, Alaska

THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES.

This notice is for the issuance of a blanket purchase agreement call request on the “Northwest Zone Trail Maintenance and Construction BPA (1240BJ21A0021-49)”

This is a competitive request for quotes under a previously issued BPA.

We are not looking to add new contractors to the BPA at this time.

--------------------------------------------------------------------------------------------------------------------

Action Code: Presolicitation

Date: May 18, 2023

Contracting Office Address:

Procurement and Property Services,

Field Procurement Operations,

Northwest Procurement Zone

Product or Service Code:  Z2LB

NAICS Code:  237310

Proposed Solicitation Number: 1240BJ23Q0024

Closing Response Date: June 2, 2023

Contact Point or Contracting Officer:  Roxanne Anderson

Place of contract performance:  Kenai Peninsula, Alaska

Description:

This project is for bridge decking removal services on the Forest Service Trail River Bridge on the Seward Ranger Districts in Southcentral Alaska within the Kenai Peninsula Borough. Performance for this requirement includes cleaning all debris from the running surface and removal of wear surface running planks.   

The Government will not exercise any supervision or control over the contract service providers performing the services herein.  Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

    1. Outline of Services:  The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS).
    1. Project Location: The project work is located approximately mile 0.4 of Trail River Road, South of Moose Pass, Alaska, Mile post 24.2 of the Seward Highway.
    1. Background:  The Trail River Bridge is approximately 140’3” long with a 22’1” clear width between curbs. This bridge provides access to the Forest Service Campground on the west side of Trail River. The current wear surface has been exposed to weather and traffic, and as a result has become deteriorated and in some locations, exposing the spike nails used as fasteners.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity