Tooele 2MW Solar Photovoltaic Array

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123821R0071
Agency
ENDIST Sacramento US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
221114 Solar Electric Power Generation
PSC
Y1NZ Construction Of Other Utilities
Place of performance
Tooele, Utah 84074, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Sacramento is soliciting proposals for a design-build project to install a 2 megawatt solar photovoltaic array at Tooele Army Depot in Utah. Offerors must demonstrate experience designing and constructing similar 1 megawatt or greater solar arrays, and construction must be completed within 365 days of award. Proposals will be evaluated using lowest price technically acceptable criteria, with responses due by September 28, 2021. The objective is to offset the depot's energy consumption from the local utility and allow excess power to be sent to the local grid via an existing net metering station.

The set-aside is designated for total small business. The NAICS code is 238210 and PSC code is R408. The place of performance is Tooele, Utah. Key details include generating up to 2 megawatts of electrical power from the solar array to reduce energy costs while excess power will be sent to the local utility grid.

Notice text

5 versions

Update #5 · Latest ·

**** 16 Sep 21: this posting issues Amendment 0003 revising the evaluation criteria and extending the due date for receipt of proposals to 28 Sep 21 ****

**** 27 Aug 21: this posting issues Amendment 0002 updating 00 73 00, and updating 2 solicitation specification sections ****

**** 20 Aug 21: this posting issues Amendment 0001 extneding the proposals due date to 1 Sep 2021 ****

**** 13 August 21: the 5 Aug 21 Site Visit Attendance Sheet is added to the solicitation documents ****

This is a design-build project to meet growing energy and reliability demands, and as part of its ongoing drive to optimize efficiency and conserve natural resources, Tooele Army Depot (TEAD) desires a solar photovoltaic array to be installed onsite adjacent to GE Wind Turbine at Toole Army Depot, UTAH. The Project is located east of the existing Stirling Array and GE Wind Turbine within the Tooele Army Depot north area.

The main objective of this requirement is to design and build a 2 MW solar photovoltaic (PV) array that offsets Tooele Army Depots (TEAD) energy consumption from the local utility by generating electrical power, while allowing excess power generated to be sent to the local utilities electrical grid via the existing net metering station.

Update #4 ·

**** 27 Aug 21: this posting issues Amendment 0002 updating 00 73 00, and updating 2 solicitation specification sections ****

**** 20 Aug 21: this posting issues Amendment 0001 extneding the proposals due date to 1 Sep 2021 ****

**** 13 August 21: the 5 Aug 21 Site Visit Attendance Sheet is added to the solicitation documents ****

This is a design-build project to meet growing energy and reliability demands, and as part of its ongoing drive to optimize efficiency and conserve natural resources, Tooele Army Depot (TEAD) desires a solar photovoltaic array to be installed onsite adjacent to GE Wind Turbine at Toole Army Depot, UTAH. The Project is located east of the existing Stirling Array and GE Wind Turbine within the Tooele Army Depot north area.

The main objective of this requirement is to design and build a 2 MW solar photovoltaic (PV) array that offsets Tooele Army Depots (TEAD) energy consumption from the local utility by generating electrical power, while allowing excess power generated to be sent to the local utilities electrical grid via the existing net metering station.

Update #3 ·

**** 20 Aug 21: this posting issues Amendment 0001 extneding the proposals due date to 1 Sep 2021 ****

**** 13 August 21: the 5 Aug 21 Site Visit Attendance Sheet is added to the solicitation documents ****

This is a design-build project to meet growing energy and reliability demands, and as part of its ongoing drive to optimize efficiency and conserve natural resources, Tooele Army Depot (TEAD) desires a solar photovoltaic array to be installed onsite adjacent to GE Wind Turbine at Toole Army Depot, UTAH. The Project is located east of the existing Stirling Array and GE Wind Turbine within the Tooele Army Depot north area.

The main objective of this requirement is to design and build a 2 MW solar photovoltaic (PV) array that offsets Tooele Army Depots (TEAD) energy consumption from the local utility by generating electrical power, while allowing excess power generated to be sent to the local utilities electrical grid via the existing net metering station.

Update #2 ·

**** 13 August 21: the 5 Aug 21 Site Visit Attendance Sheet is added to the solicitation documents ****

This is a design-build project to meet growing energy and reliability demands, and as part of its ongoing drive to optimize efficiency and conserve natural resources, Tooele Army Depot (TEAD) desires a solar photovoltaic array to be installed onsite adjacent to GE Wind Turbine at Toole Army Depot, UTAH. The Project is located east of the existing Stirling Array and GE Wind Turbine within the Tooele Army Depot north area.

The main objective of this requirement is to design and build a 2 MW solar photovoltaic (PV) array that offsets Tooele Army Depots (TEAD) energy consumption from the local utility by generating electrical power, while allowing excess power generated to be sent to the local utilities electrical grid via the existing net metering station.

Update #1 ·

This is a design-build project to meet growing energy and reliability demands, and as part of its ongoing drive to optimize efficiency and conserve natural resources, Tooele Army Depot (TEAD) desires a solar photovoltaic array to be installed onsite adjacent to GE Wind Turbine at Toole Army Depot, UTAH. The Project is located east of the existing Stirling Array and GE Wind Turbine within the Tooele Army Depot north area.

The main objective of this requirement is to design and build a 2 MW solar photovoltaic (PV) array that offsets Tooele Army Depots (TEAD) energy consumption from the local utility by generating electrical power, while allowing excess power generated to be sent to the local utilities electrical grid via the existing net metering station.

Attachments

Files attached to this notice, newest first
File Type Posted
B08 Amendment 0003.pdf PDF
B08 AMD 0002_Tooele 2MW PV_01 10 10_page 20.pdf PDF
B08 Amendment 0002.pdf PDF
B08 AMD_Tooele 2MW PV_01 10 10_page 26.pdf PDF
B08 Amendment 0001.pdf PDF
B07 Site Visit sign in sheet.pdf PDF
Attachment 5 - Past Performance Questionnaire.pdf PDF
Attachment 2 - Wage Determination.UT20202297.6.18.pdf PDF
Attachment 3 - Site Visit Info Sheet.xlsx XLSX spreadsheet
Solicitation W9123821R0071.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 4 - Preaward Survey.pdf PDF
Show all 12

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Tooele 2MW Solar Photovoltaic Array Award Award Notice
Tooele 2MW Solar Photovoltaic Array This notice · Latest solicitation Solicitation
Tooele 2MW Solar Photovoltaic Array Pre-Solicitation
Tooele 2MW Solar Photovoltaic Array Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity