This procurement shall consist of the following: all labor, equipment, supplies, and supervision, necessary to accomplish the Re-roofing of various out building throughout the Harry S Truman Lake
Award Notice Posted
- Solicitation number
- W912DQ-10-T-9002
- Agency
-
ENDIST Kansas City
US Army Corps of Engineers, Department of Defense
- Awarded
- to J & M Smith Construction, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912DQ-10-P-0149 Federal contract award
- NAICS code
- 238160 Roofing Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Re-roofing of various out building throughout the Harry S Truman Lake Project as stated in the Statement of Work.
Update #2 ·
The purpose of this amendment is to add
FAR Clause 52.236-4035 Army Corps of Engineers Safety and Health Requirements Manual
Remove No. 2 Comfort Station #2 from Line Item #5 of the Scope of Work dated 30 Apr 2010
Update #1 ·
The U.S. Army Corps of Engineers, Kansas City District, Harry S Truman Lake Project, will issue a Request for Quotes (RFQ) for a firm fixed price contract to re-roof various Public Use buildings located throughout the Harry S Truman Dam and Reservoir project.
The general Scope of Work consists of the following:
Contractor shall furnish all equipment, materials and labor to perform the following at various locations:
" 10 Shelter Houses
" 20 Vault Toilets
" 5 Quad Buildings
" 2 Well Houses
" 1 Comfort Station
Contractor shall:
1. Remove existing shingles from all roofs, ensuring that all nails, shingles and waste materials are contained and disposed in accordance with State and Federal regulations in an approved, licensed land fill.
*All roofs have one layer of shingles.
2. Installation of new roof material:
" Contractor shall install 15 lb. felt between deck and shingles.
" Install starter shingles, roofing shingles and ridge cap in accordance with manufactures application instructions. Note: see bullet on fasteners.
" Shingles shall be high definition Timberline 30 Shakewood, with matching ridge cap. Replace drip edge with large brown drip edge, and replace roof vent boots and flashing where installed.
" No fasteners, used to secure roofing shingles and all other materials, shall protrude through the underside of roof deck into the finished ceiling; however, maximum length of fastener shall be used. The length of fastener may not meet the manufactures recommendations but all efforts to fulfill manufactures requirements and not to protrude through the roof deck into the finished ceiling shall be selected. All fasteners shall be corrosion resistant; no staples are expectable. Decking material varies in thickness from one type of structure to another.
3. The contractor will replace damaged roof deck, as needed, to include fasteners. *Government furnished material: 5/8 plywood.
4. All bidders are encouraged to visit site areas prior to bidding to obtain accurate dimensions and supplies needed.
*Contractors shall furnish Equipment, and Labor to perform the following tasks; *Government shall furnish all roofing materials except for fasteners, and vent boot materials located at the following parks:
Long Shoal
2 Quad Buildings
Windsor Crossing
2 Vault Toilets
1 Well House
Talley Bend
2 Vault Toilets
Note:
The solicitation will list all locations and final building count.
FAR 36.204 -- Disclosure of the Magnitude of Construction Projects
(b) Between $25,000.00 and $100,000.00
Solicitation will be post on or before 22 April 2010. RFQs will be due by the Close of Business 5 May 2010, based on a 22 April solicitation posting.