Thermion Arc Equipment

Closed Solicitation Posted

Solicitation number
W44W9M-20-T-0051
Agency
Joint Munitions Command Army Materiel Command, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
333992 Welding and Soldering Equipment Manufacturing
PSC
3426 Metal Finishing Equipment
Place of performance
McAlester, Oklahoma 74501, United States

Notice details come from SAM.gov. Updated .

Notice text

Brand Name-No Substitute – Two (2) Thermion Precision Arc 4.8, Model 71000-4.8; Precision Arc Gen III set up for 3/16” wire size, feeder assembly 4.8, front end -3/16 PA Custom length, control cable and power leads 50’ package, power cable assembly, Power/Control Lead 650 Amp Multi-voltage input Power Supply with Running Gear Tool Kit front end leads: Custom length, control box miller assembly, tool kit, DeltaWeld 652 w/running gear, precision: wire drum dispenser. Capable of spraying 3/16” zinc/aluminum (85/15) alloy material, 85 ZINC/15 ALUMINUM 136 LBS/62 KGS (431 FT2 @10MILS), deposit efficiency: (70%), Air consumption: 90-110 PSI at 60 CFM, ½” IPS connection, 6 roll power drive, emergency stop(s), hardened feed rolls (Rc60), sealed bearing inlet guides, automatic wire tensioning, sealed amphenol fittings, direct connect electrical connections, all aluminum frame, digital meters, sealed feed roll bearings. Power source: 480V, 3 Phase. Must be equipped with wire straightening, wire feed jog switch (downstream side), and meter at the feeder, arc shorting control and modular construction, whereas each component and sub-component has quick release plugging for quick maintenance and component swapping. Standard Control Box and Industrial cart are to be removed.

Brand Name-No Substitute: 2 each: Precision Wire Drum Dispenser, Model 541000 for Thermion Precision Arc 4.8 Above.

Brand Name-No Substitute: 2 each; Spraymaster: Control panels and electronics cabinet combined, Model 53097R1-CP/EC. Welders are to be controlled independent of each other for Thermion Precision Arc 4.8 Above.

DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP Engineering Support Division will validate and verify/approve the contractor’s listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of the thermal arc system. The offeror’s description submittal shall account for each one of the required product features located in this qualifying statement. Submittal line items shall be in the same order as the required features in the qualifying statement. Conceptual drawings that are not detail “as built” drawings are recommended but not required for submittal with the detailed description.

 Approval drawing(s) is/are requested. 3D models requested, can be in native Solidworks format, IGES, and/or STEP within two weeks after award.

Attachments

Files attached to this notice, newest first
File Type Posted
20T0051.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity