Thermal Spray; Snorkel Mast
Closed Solicitation Posted
- Solicitation number
- N4523A20R0809
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- J999 Non-Nuclear Ship Repair (West)
- Place of performance
- USA
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT: Correcting the reference call out in section 3.3.1 of the description. No other changes to the synopsis.
BACKGROUND – Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), in support of US Submarine, requires thermal spray services for the snorkel induction standpipe, IAW T9074-AA-GIB-010/1687. Snorkel standpipe was found to have surface defects with depths of up to 0.012in.
-
- Scope – Thermal spray repair surfaces of snorkel induction standpipe measuring 13ft 10.3in long by 21in diameter.
2 REFERENCES
2.1 DWG 501-4675662 Rev H
2.2 T9074-AA-GIB-010/1687
2.3 SMS 5120-081-026 Rev H CHG-6
3 GENERAL REQUIREMENTS
3.1 Place of Performance: Contractor’s facility
3.2 Delivery Date: 20 Nov 2020
3.3 TECHNICAL REQUIREMENTS
3.3.1 Submit requirements per para 3.2.1, 3.2.3.2, 3.2.3.5 and 3.3.1.1 of 2.2 as part of contractor’s proposal (CDRL A001)
3.3.2 Undercut surfaces [2], [3], and [4], shown in Figure 3 of reference (2.3), of the snorkel standpipe to the minimum amount necessary (up to 0.025in per side) to establish a suitable surface for coating.
3.3.3. Spray repair surfaces [2], [3], and [4] with Inconnel 625 type material per reference (2.2).
3.3.4. Finish machine and final polish surfaces [3] and [4] to roughness height reading 32 per SECTION 11-A of reference (2.1).
3.3.5. Finish machine and final polish surface [2] to roughness height reading 125, or smoother, per paragraph 1.d.(5) of reference (2.3).
3.3.6 Submit one legible copy, in approved transferrable media, of the sprayed component record form that meets the minimum requirements of para. 3.1.3 of 2.2 to the COR upon completion of coating application (CDRL A002).
3.3.7 Submit one legible copy, in approved transferrable media, of a completion report for each locking ring (CDRL A002).
4 GOVERNMENT FURNISHED MATERIAL/SERVICES
4.1. Snorkel Induction Standpipe – Government will ship to contractor and contractor will ship back to government.
1EA Snorkel Standpipe PN 4675662-002 $76,261.00/EA
5 DELIVERABLES
5.1. Provide deliverables as described in this Statement of Work (SOW) and as outlined for format and delivery schedule in Contract Data Requirements Lists (CDRLs).
Number Name Frequency Quantity
A001 Proof of facility, and Spray Operator, Certification 5 days of Award 1
A002 QA Record Upon Completion 1
A003 Completion Record Upon Completion 1
See attached applicable clause sheet.
Update #1 ·
BACKGROUND – Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), in support of US Submarine, requires thermal spray services for the snorkel induction standpipe, IAW T9074-AA-GIB-010/1687. Snorkel standpipe was found to have surface defects with depths of up to 0.012in.
-
- Scope – Thermal spray repair surfaces of snorkel induction standpipe measuring 13ft 10.3in long by 21in diameter.
2 REFERENCES
2.1 DWG 501-4675662 Rev H
2.2 T9074-AA-GIB-010/1687
2.3 SMS 5120-081-026 Rev H CHG-6
3 GENERAL REQUIREMENTS
3.1 Place of Performance: Contractor’s facility
3.2 Delivery Date: 20 Nov 2020
3.4 TECHNICAL REQUIREMENTS
3.4.1 Submit requirements per para 3.2.1, 3.2.3.2, 3.2.3.5 and 3.3.1.1 of 5.2 as part of contractor’s proposal (CDRL A001)
3.4.2 Undercut surfaces [2], [3], and [4], shown in Figure 3 of reference (2.3), of the snorkel standpipe to the minimum amount necessary (up to 0.025in per side) to establish a suitable surface for coating.
3.4.3. Spray repair surfaces [2], [3], and [4] with Inconnel 625 type material per reference (2.2).
3.4.3. Finish machine and final polish surfaces [3] and [4] to roughness height reading 32 per SECTION 11-A of reference (2.1).
3.4.5. Finish machine and final polish surface [2] to roughness height reading 125, or smoother, per paragraph 1.d.(5) of reference (2.3).
3.4.6 Submit one legible copy, in approved transferrable media, of the sprayed component record form that meets the minimum requirements of para. 3.1.3 of 2.2 to the COR upon completion of coating application (CDRL A002).
3.4.7 Submit one legible copy, in approved transferrable media, of a completion report for each locking ring (CDRL A002).
4 GOVERNMENT FURNISHED MATERIAL/SERVICES
4.1. Snorkel Induction Standpipe – Government will ship to contractor and contractor will ship back to government.
1EA Snorkel Standpipe PN 4675662-002 $76,261.00/EA
5 DELIVERABLES
5.1. Provide deliverables as described in this Statement of Work (SOW) and as outlined for format and delivery schedule in Contract Data Requirements Lists (CDRLs).
Number Name Frequency Quantity
A001 Proof of facility, and Spray Operator, Certification 5 days of Award 1
A002 QA Record Upon Completion 1
A003 Completion Record Upon Completion 1
See attached applicable clause sheet.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity