Teardown, Test and Evaluation (TT&E) and Overhaul of the B-2 Electro- Mechanical Actuators
Closed Solicitation Posted
- Solicitation number
- FA8118-23-R-0007
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Notice details come from SAM.gov. Updated .
Notice text
A 2‐YEAR FIRM FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) TYPE CONTRACT IS CONTEMPLATED.
(a) A Pre‐Award Survey and/or Initial Production Evaluation (IPE) is not required.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the
remanufacture required to restore the end item to a like‐new condition. The contractor shall also accomplish ALL necessary
packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein
(including attachments hereto) and at the unit price(s) established at the time of award.
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition mustsubmit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405‐739‐7243.
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror
with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to John.freeman.16
@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation
number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including
instructions for completing the form, is available at:
http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for
incomplete, misdirected, or untimely requests.**
In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website:
https://jedmics.af.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the
following link: https://jedmics.af.mil/webjedmics/splash/training/NEWCTR2875.pdf
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or
“maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the
contract.
(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable
requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond
the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor
prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the
administrative contracting officer in writing and shall not perform further overhaul on any such items except at the direction of
the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable,
the contractor shall dispose of the unit in the manner directed by the ACO.
Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is
performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has
received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to
mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and
acceptance by both parties are prerequisite to any contract award.
(h) Condemned units shall not be counted as production.
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to
meet the Government’s required delivery schedule.
(j) In the event that DFARS clause 252.217‐7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.
The fill‐in data in Clause 252.217‐7001 will be TBD until a surge is known and negotiations are necessary.
(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211‐7003. Contractor determined
location and method of marking is acceptable.
(l) All quantities specified herein represent the total contract quantities for both years combined. The ordering period for
each line item shall extend from the contractual effective data to two years thereafter or until the maximum quantity for each
line item is reached, whichever comes first. The minimum and maximum quantities for each line item are as follows:
Line Item 0001 NSN: 1680-01-371-5845 Minimum Quantity:1 each Maximum Quantity: 6 each
Line Item 0002 NSN: 1680-01-352-4073 Minimum Quantity 1 each Maximum Quantity:6 each
Line Item 0003 NSN: 1680-01-371-5845 Minimum Quantity:1 each Maximum Quantity: 6 each
Line Item 0004 NSN: 1680-01-352-4073 Minimum Quantity:1 each Maximum Quantity: 6 each
(m) This Solicitation contemplates award of a two‐year Indefinite Delivery Indefinite Quantity (IDIQ) Type Contract. Reference
Clauses 52.216‐19 – Delivery‐Order Limitations, 52.216‐22 – Indefinite Quantity and 252.216‐7006 – Ordering.
(n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the
remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the
Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed
item(s).
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Teardown, Test and Evaluation (TT&E) and Overhaul of the B-2 Electro- Mechanical Actuators | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity