Sustain Repair HVAC Wing HQ, BLDG 1250

Award Notice Posted

Solicitation number
FA4460-10-R-0018
Agency
Awarded
to Webco Maryland, LLC
Set-aside
HUBZone

Opportunity facts

Contract number
FA4460-10-C-0020 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record
Place of performance
19th Contracting Squadron 642 Thomas Ave Little Rock AFB, Arkansas 72099, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Please see below for closing date and time, but the date and time within the attached solicitation will be what is used. 

Updated FBO response time in accordance with Amendment 0003.

Update #2 ·

Please see below for closing date and time, but the date and time within the attached solicitation will be what is used. 

Update #1 ·

NOTICE TO OFFEROR; FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS PROJECT. NO AWARD WILL BE MADE UNDER THIS REQUEST FOR PROPOSAL (RFP) UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS RFP EITHER BEFORE OR AFTER THE RFP CLOSING DATE.

The 19th Airlift Wing, Little Rock AFB, AR 72099 intends to issue a Request for Proposals (RFP) to award a single, firm fixed-price contract to provide all services, plant, labor, vehicles, equipment, tools, materials, supervision, design and other items necessary for the design and construction in connection with Project NKAK 03-1057 Sustain Repair HVAC Wing HQ, BLDG 1250. This project is to replace an existing 2-pipe heating/cooling system. The Design-Build firm will replace the existing boiler and chiller and design a 4-pipe fan coil system to replace the existing 2-pipe system. The design shall contain the replacement of all fan coil units, reuse or replacement of existing pipe, the reuse or replacement of existing pumps, addition of an expansion tank(s), and the replacement of the existing sump pump. The Design-Build firm shall be responsible for any surveys, excavations, soil borings, soil analyses, chemical tests, laboratory tests, pressure tests, electrical tests, corrosion and cathodic protection tests, asbestos and lead-based paint surveys, and any other tests required for complete design and construction of this project. The Design-Build Firm shall be responsible for locating all utilities in the area of construction, and for accomodating or modifying them as required for the construction of this project.


Construction project magnitude is between $1,000,000.00 and $5,000,000.00


Total Performance Period for Design and Construction is 365 calendar days after receipt of Notice to Proceed.


Performance Period for design is 120 calendar days after receipt of Notice to Proceed 1 (NTP1)


Performance Period for construction is 245 calendar days after receipt of Notice to Proceed 2 (NTP2)


This procurement is being issued as a 100% HUBZone set-aside. All responsible sources may submit a proposal. This office proposes to post an RFP# FA4460-10-R-0018 to the FedBizOpps website (http://www.fbo.gov) on or about 21 July 2010. Once the solicitation is issued, it is incumbent upon the interested parties to review this site frequently for any updates/amendments to any and all documents. Contract award will be determined using the Source Selection procedures in FAR Par 15. All Contractors shall be ORCA registered (http://orca.bpn.gov). All contractors are reminded, in accordance with DFARS 252.204-7004, Required Central Contractor Registration, that lack of registration in the CCR database BY AWARD DATE will make a contractor ineligible for award. Please acknowledge all requirements in proposals. NO PARTIAL QUOTES WILL BE CONSIDERED. NO PARTIAL AWARDS WILL BE MADE.


No response to this notice is necessary. This notice does not obligate the Government to award a contract nor does it obligate the Government to pay for any bid/proposal preparation costs.

Files

File Type Posted
FA4460-10-R-0018-0003.pdf PDF
0750000419M101.dwg DWG drawing
0750000419M102.dwg DWG drawing
B-1250 AsBuilt .PDF PDF
NKAK 03-1057 Phasing Plan.pdf PDF
03-1057 B-1250 D-B Specs UPDATED.pdf PDF
FA4460-10-R-0018-0002.pdf PDF
Attach 1 Wage Decision 10R18 .pdf PDF
FA4460-10-R-0018-0001.pdf PDF
Attach 7 SubKTR_Consent_Form.pdf PDF
Attachment_5_RESPONSIBILITY.pdf PDF
03-1057 D-B dashSpecs.pdf PDF
10-R-0018.pdf PDF
Attachment 4 C D Report.pdf PDF
Attachment 3 Environmental MOA.pdf PDF
Attachment 6 Past Performance Question.pdf PDF
Attachment 2 EMIS Instruction Guide.pdf PDF
Attachment 1 Wage Determination Rev.pdf PDF
AF 66 Schedule of Material Submittals Feb 05.pdf PDF
Show all 19

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors