About this opportunity

The Department of the Army Materiel Command Contracting Command Detroit Arsenal (ACC Warren) has awarded contract W911PT25C0009 to THE BLACKLEDGE GROUP, INC. for supplemental work at the Watervliet Arsenal in New York, valued at $413,893. The contract consists of two Contract Line Item Numbers (CLINs) focused on supporting the Pro Tem Paint Booth in Building 137, including paint booth winches and rigging, as well as comprehensive supplemental installation work such as fire alarm conduit modification, structural steel support installation, electrical work, and related infrastructure improvements. The contract is an 8(a) Sole Source award with a performance period of 30 calendar days from the Notice to Proceed, and requires 100% Payment or Performance Bonds, with the total project magnitude estimated between $250,000 and $1,000,000.

Notice text

CLIN 0001

Paint Booth Winches and Rigging
FFP
To provide all labor, material, parts and equipment required for Gun Tube Rigging,
Winches / Training and Winch Outlets in support of the Pro Tem Paint Booth
within Building 137 per the Statement of Work.
Wage Determination General Decision Number: NY2 Revision 4 dated 03/14/2025
applies and is incorporated.
Magnitude of this Entire Contract is between $250,000 and $1,000,000.
Period of Performance is 30 calendar days from receipt of Notice to Proceed.
Technical Representative: Joseph Lavigne
Contracting Officer Representative is David Fischer.
100% Payment or Performance Bonds are required.
FOB: Destination
NSN: AASSVC502300XW
MILSTRIP: W16H1F502300XW
PURCHASE REQUEST NUMBER: W16H1F502300XW
PSC CD: Z2EC

CLIN 0002

Supplemental Work for PaintBooth Install
FFP
To provide all labor, material, parts and equipment required for the supplementary
work required for the Installation of the Pro Tem Paint Booth within Building 137
per the Statement of Work (25PW031). This includes but not limited to:
- Fire Alarm Conduit Demo and Reinstall
- Install Structural Steel Support for Mixing Room
- Remove Existing Filters and Install Perforated Plates
- Install and Run Cable for Three Light Poles
- Install Four Bollards
- Relocate Exhaust Duct
- Electrical Conduit Relocation
- Relocate Curing Oven Intake Wall Louver and Connected Duct to North Wall
- Install Additional Fire Suppression Devices and premium Labor
Wage Determination General Decision Number: NY2 Revision 4 dated 03/14/2025
applies and is incorporated.
Magnitude of this Project is between $250,000 and $1,000,000.
Period of Performance is 30 calendar days from receipt of Notice to Proceed.
Contracting Officer Representative is David Fischer
100% Payment or Performance Bonds are required.
FOB: Destination
MILSTRIP: W16H1F5092004D
PURCHASE REQUEST NUMBER: W16H1F5092004D
PSC CD: Z2EC

Awarded contract W911PT25C0009 to THE BLACKLEDGE GROUP, INC. for 413893.00 on 2025-04-08.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Handle, P2TC for Watervliet Arsenal 12189 · NAICS 332710 ACC Warren Total Small Business
Remove and repair two high velocity air handling units NAICS 238220 ACC Warren Total Small Business
Lever Castings for the Watervliet Arsenal 1 Buffington St Bldg 35, Watervliet Ny 12189 Watervliet, NY 12189 United States 12189 · NAICS 332710 ACC Warren Total Small Business
Magis 400 presetter package, accessories and installation, for the watervliet arsenal 12189 · NAICS 333517 ACC Warren Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors