Super Duper Kits
Closed Pre-Solicitation Posted
- Solicitation number
- FD20602530810
- Agency
-
AFLCMC Robins AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336411 Aircraft Manufacturing
- PSC
- 1560 Airframe Structural Components
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is seeking contractors for the rapid acquisition, assembly, and delivery of specialized aircraft modification kits for the MC-130J Capability Release II Modification Line. The procurement encompasses 45 total kits across five categories: nine Special Mission System (SMS) Kits, nine Electronic Warfare Bus Kits, nine Auxiliary Flight Deck Station (AFDS) Kits, nine Shielded Wire Kits, and nine Special Mission Processor (SMP) Power Transition Kits. The contractor must provide secure storage for previously procured components, conduct serviceability inspections, and utilize these existing components in production while procuring only necessary new Original Equipment Manufacturer (OEM) parts with Certificates of Conformity. All work must be performed as a "build to print" effort according to specific Technical Compliance Technical Orders (TCTOs) and Government Furnished Information, with assembly and packaging for delivery to designated aircraft installation locations. This pre-solicitation notice was posted on August 6, 2025, with responses due by September 5, 2025.
This opportunity operates under the Aircraft Manufacturing NAICS category (336411) and Airframe Structural Components PSC (1560), with no set-aside designation restricting competition to small businesses or other specialized categories. The contract structure includes a basic year for inventory and inspection activities, followed by an Option 1 production phase where pricing will be determined only after completion of the initial inventory assessment. The contractor will be required to provide engineering support through potential travel to installation sites and must ensure all furnished parts are new OEM components, with no repaired, refurbished, reclaimed, or reused parts permitted. The solicitation identifies specific Government Furnished Equipment items that will be provided to the installation line but are not required for the kit build/purchase process. The timeline emphasizes rapid acquisition capabilities, suggesting an expedited procurement process to meet operational requirements for the MC-130J aircraft modification program.
Notice text
The purpose of this requirement is to satisfy rapid acquisition of the procurement, assembly and delivery of nine (9) Special Mission System (SMS) Kits, nine (9) Electronic Warfare Bus Kits, nine (9) Auxiliary Flight Deck Station (AFDS) Kits, nine (9) Shielded Wire Kits, and nine (9) Special Mission Processor (SMP) Power Transition Kits. The contractor shall also secure/provide storage for previously procured kit components. The contractor shall inspect for serviceability and compliance with data of any items from the previous kits they utilize in kits procured under this requirement. The contractor will utilize the Basic year to inventory and inspect all provided previously procured components. These components will be fed into the production of the Option 1 kits. Pricing for the option 1 kits will only be determined after the inventory and will only cover items the contractor has to procure. The Contractor will build to print the additional production kits for this order in accordance with the schedule. The kits will be assembled and packed according to Government Furnished Information (GFI) and delivered to a designated location for installation on aircraft. This is a (build to print) effort for the MC-130J Capability Release II Modification Line. Parts the contractor provides will only be Original Equipment Manufacturer (OEM) parts with a Certificate of Conformity and all parts must be new. No contractor furnished repaired, refurbished, reclaimed or reused parts are authorized for this kit build. The contractor will be available to travel to installation site to provide engineering support if needed.
In Accordance With (IAW):
(1) SMS Time Compliance Technical Order (TCTO) 1C-130(A, H, M)J-516, SMS Kit Part Number P/N 3364972-9, NSN 1680K0102481ALG Items provided to install line and not required in the build/purchase:
1. Ethernet Switches, NSN NSL, PN 42740500
2. Network File Servers, NSN NSL, PN 698282-7
3. Network File Server Mount, NSN NSL, PN PN 698282-3
4. Flash Storage Module, NSN NSL, PN 698282-9
5. Keyboard/Track ball NSN 6625-01-619-1366, PN ARK200-LMM01
6. Special Mission Processor, NSN NSL, PN 315A450-5/-7/-9
7. Special Mission Processor Mount Kit, NSN NSL, PN 698283-3
Items called out as GFE in the TCTO that will be required in this kit build:
1. VDT Adapter Plate, NSN NSL, PN 201524578-10
(2) E. W. Bus TCTO 1C-130(A, H, M)J-586D, E. W. Bus kit Part AFE0010000-101, NSN 1560K0104530A
(3) AFDS TCTO 1C-130(A, H, M)J-621C, AFDS kit part number 3369123-2, NSN 1560K0105261BLG
Items provided to install line and not required in the build/purchase:
1. Keyboard Trackball, NSN 6625-01-619-1366, PN ARK200-LMM01
(4) Shielded Wire TCTO 1C-130(A, H, M)J-755, Shielded Wire kit NSN 1560K0108583ASO
(5) Special Mission Processor (SMP) Power Transition TCTO 1C-130(A, H, M)J-708, kit part number 3370121-1, NSN 1560K0106856ASO
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| AC/MC-130J Arkham SMP Production | AFLCMC Robins AFB | No set-aside | |
| Tanker kit, aircraft, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| B-52J CERP Production Modification Kits & ICS | AFLCMC Tinker AFB | No set-aside | |
| USAF Special Operations Forces Technical Data Management, Development, and Provisioning Project | AFLCMC Robins AFB | Total Small Business | |
| FOPR for F-16 AAGs for the Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV) | AFLCMC Robins AFB | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity