Study for Pumped Storage Optimization and Increased Transfer Capability

Closed Solicitation Posted

Solicitation number
23SP000043
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services

Notice details come from SAM.gov. Updated .

About this opportunity

The United States Department of Energy (DOE) Southeastern Power Administration (SEPA) is seeking proposals for two separate studies: one to increase the transfer capability between Georgia and South Carolina by establishing a new interconnection with an investor-owned 230kV transmission line in South Carolina, and another to optimize the utilization of federal pumped storage hydropower assets by performing a capacity expansion study. The period of performance is approximately 12 months from the contract award, with proposals due by October 10, 2023. The awarded contractor will be expected to provide detailed technical specifications, a comprehensive proposal document, and regular check-in and review meetings.

List of services to be provided by the contractor:

  1. A study to increase the transfer capability between Georgia and South Carolina.
  2. A study to optimize the utilization of federal pumped storage hydropower assets.
  3. A comprehensive written response to the RFP.
  4. Detailed technical descriptions of prior experience with similar projects.
  5. Regular check-in and review meetings.
  6. Delivery of interim and final reports.
  7. Management capability and qualifications of the personnel performing the work.

Notice text

Southeastern Power Administration is seeking a vendor to provide a study to increase Pumped Storage Optimization and Increased Transfer Capability.  Attached is a Request for Proposal with all pertinent information.

Files

File Type Posted
GDO RFP 8.15.23.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity