Stephenson Taylor Water Line Extension

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
75H70126R00038
Agency
Indian Health Service Department of Health and Human Services
Responses due
Set-aside
Indian Small Business Economic Enterprise

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Y1DA Construction Of Hospitals And Infirmaries
Place of performance
Caddo, Oklahoma, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Indian Health Service seeks construction services to extend a water line for Caddo County Rural Water District No. 3, with proposals due August 19 at 2:00 PM PT and a mandatory site visit on July 24. This procurement is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under NAICS 237110, with an anticipated project magnitude between $250,000 and $500,000. Amendment A00001 was issued on July 27 providing the site visit sign-in sheet from the July 24 site visit.

Place of performance is three sites in Binger, Oklahoma (Caddo County). Work includes furnishing and installing 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR 11 HDPE casing, directional boring of 815 feet total (covering two road crossings, one driveway crossing, and one creek crossing), two open cut gravel road crossings totaling 55 feet, four water main taps with meters and service lines, and all appurtenances including gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings. The contractor must maintain a 5-foot horizontal and 2-foot vertical separation from all gas lines, complete pressure testing, and perform disinfection and bacteriological testing with two consecutive negative tests 24 hours apart, at contractor expense for re-sampling of positive tests. Period of performance is 90 calendar days from notice to proceed, commencing within 10 calendar days of award.

The contract is firm-fixed-price. Prevailing wage rates apply per FAR 52.222-6 under Department of Labor General Decision GD OK20260036. The contractor must perform at least 15% of contract costs with its own employees, excluding material costs. Source selection uses Lowest Price Technically Acceptable (LPTA) procedures, evaluating Specialized Experience (three to five relevant projects at least 75% complete within six years) and Past Performance. Performance and payment bonds are required within 10 days after award. Offerors must submit an Indian Economic Enterprise Representation Form certifying eligibility under 25 U.S.C. 47 and HHSAR 326.601 at offer, award, and throughout performance.

Notice text

2 versions

Update #2 · Latest ·

***A00001 has been issued. Refer to B05 Amend A00001 for details. 

This is a SOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS).

A full scope of work, plans and specifications and Construction Wage Determination is included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.

SCOPE OF WORK:This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3.

  1. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing.
  2. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing.
  3. 2 open cut gravel road crossings totaling 55 feet.
  4. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. 
  5. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances.
  6. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
  7. Complete pressure testing and provide results to the project engineer.
  8. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense.
  9. Connect installed water line extension to Caddo County Rural Water District No. 3.

LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.

PERIOD OF PERFORMANCE: Period of Performance is 90 calendar days from date of notice of proceed.

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000.

SITE VISIT:A site visit will be held on 24 July 2026 at 10:00AM CT. See L.6 for more details.

CONTRACT TYPE: IHS intends to award a single Firm Fixed Price (FFP) contract in support of this requirement.

This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable (LPTA) evaluation criteria.

This project will be solicited as 100% set aside for Indian Small Business Economic Enterprise (ISBEE) pursuant to the Buy Indian Act under North American Industry Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The associated size standard for this procurement is $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov.

NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.

Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM.

It is the responsibility of the contractor to check https://www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all

This is a SOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS).

A full scope of work, plans and specifications and Construction Wage Determination is included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.

SCOPE OF WORK:This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3.

  1. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing.
  2. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing.
  3. 2 open cut gravel road crossings totaling 55 feet.
  4. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. 
  5. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances.
  6. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
  7. Complete pressure testing and provide results to the project engineer.
  8. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense.
  9. Connect installed water line extension to Caddo County Rural Water District No. 3.

LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.

PERIOD OF PERFORMANCE: Period of Performance is 90 calendar days from date of notice of proceed.

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000.

SITE VISIT:A site visit will be held on 24 July 2026 at 10:00AM CT. See L.6 for more details.

CONTRACT TYPE: IHS intends to award a single Firm Fixed Price (FFP) contract in support of this requirement.

This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable (LPTA) evaluation criteria.

This project will be solicited as 100% set aside for Indian Small Business Economic Enterprise (ISBEE) pursuant to the Buy Indian Act under North American Industry Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The associated size standard for this procurement is $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov.

NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.

Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM.

It is the responsibility of the contractor to check https://www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at the website for download by interested parties.

Update #1 ·

This is a SOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS).

A full scope of work, plans and specifications and Construction Wage Determination is included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.

SCOPE OF WORK:This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3.

  1. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing.
  2. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing.
  3. 2 open cut gravel road crossings totaling 55 feet.
  4. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. 
  5. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances.
  6. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
  7. Complete pressure testing and provide results to the project engineer.
  8. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense.
  9. Connect installed water line extension to Caddo County Rural Water District No. 3.

LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.

PERIOD OF PERFORMANCE: Period of Performance is 90 calendar days from date of notice of proceed.

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000.

SITE VISIT:A site visit will be held on 24 July 2026 at 10:00AM CT. See L.6 for more details.

CONTRACT TYPE: IHS intends to award a single Firm Fixed Price (FFP) contract in support of this requirement.

This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable (LPTA) evaluation criteria.

This project will be solicited as 100% set aside for Indian Small Business Economic Enterprise (ISBEE) pursuant to the Buy Indian Act under North American Industry Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The associated size standard for this procurement is $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov.

NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.

Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM.

It is the responsibility of the contractor to check https://www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all

This is a SOLICITATION NOTICE for the upcoming Solicitation 75H701-26-R-00038 Stephenson-Taylor Water Line Extension a construction project prepared in accordance with FAR Part 36. These construction services are in support of the Indian Health Service (IHS).

A full scope of work, plans and specifications and Construction Wage Determination is included in the solicitation documents. Additional details can be found in the solicitation when it is posted to https://sam.gov.

SCOPE OF WORK:This acquisition is to obtain all required commercial services, equipment, materials, and supplies to construct a water line extension for Caddo County Rural Water District No. 3.

  1. Furnish and install 10,940 feet of 2-inch DR 11 HDPE water main and 870 feet of 4-inch DR11 HDPE as casing.
  2. Directional Bore 815 feet total including 2 road crossings, 1 driveway crossing, and 1 creek crossing.
  3. 2 open cut gravel road crossings totaling 55 feet.
  4. Case the water main or maintain a 5-foot horizontal and 2-foot vertical separation requirement from all gas lines. 
  5. Furnish and install 4 water main taps, water meters, and water service lines to homes. This includes 400 feet of 1-inch PE and 870 feet of 1.5-inch PE and appurtenances.
  6. Furnish and install appurtenances including all gate valves, flush hydrants, air relief valves, tracer wire, locate stations, anode bays, thrust blocks, and fittings.
  7. Complete pressure testing and provide results to the project engineer.
  8. Satisfactorily complete disinfection and bacteriological testing of completed water main. Provide results to the project engineer. 2 consecutive negative tests 24hrs apart. Re-sampling of positive tests is to be performed at contractor expense.
  9. Connect installed water line extension to Caddo County Rural Water District No. 3.

LOCATION OF PROJECT: All work shall be performed at three sites in Binger, Oklahoma.

PERIOD OF PERFORMANCE: Period of Performance is 90 calendar days from date of notice of proceed.

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $250,000 and $500,000.

SITE VISIT:A site visit will be held on 24 July 2026 at 10:00AM CT. See L.6 for more details.

CONTRACT TYPE: IHS intends to award a single Firm Fixed Price (FFP) contract in support of this requirement.

This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 36 procedures with Lowest Price Technically Acceptable (LPTA) evaluation criteria.

This project will be solicited as 100% set aside for Indian Small Business Economic Enterprise (ISBEE) pursuant to the Buy Indian Act under North American Industry Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The associated size standard for this procurement is $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov.

NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES.

Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the Government may not delay award for the purpose of allowing a contractor additional time to register in SAM.

It is the responsibility of the contractor to check https://www.sam.gov frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at the website for download by interested parties.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Stephenson Taylor Water Line Extension Award Award Notice
Stephenson Taylor Water Line Extension This notice · Latest solicitation Solicitation
Stephenson Taylor Water Line Extension Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity