Standards Enforcement Program for FMVSS No. 209, "Seatbelt Assemblies

Closed Solicitation Posted

Solicitation number
693JJ923R000145
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The contractor is required to provide personnel, facilities, materials, supplies, equipment, and services for the procurement, inspection, compliance testing, and reporting of seat belt assemblies in accordance with FMVSS No. 209. The testing may vary depending on the design and construction of each assembly, and may require different hardware, safety handling for pyrotechnics, or disabling of automatic locking features. The contractor will also prepare and submit various documents and reports, and cooperate with the NHTSA Contracting Officer’s Representative in case of test failures.

Products and Services to be provided:

  1. Qualified personnel for testing and inspection.
  2. Facilities and equipment for testing seat belt assemblies.
  3. Materials and supplies for testing.
  4. Compliance testing and reporting of seat belt assemblies.
  5. Preparation and submission of various documents and reports.

Notice text

The Contractor shall furnish the necessary qualified personnel, facilities, materials, supplies, equipment, and services to perform work associated with the procurement, inspection, compliance testing, and compliance test reporting of seat belt assemblies, provided to the Contractor as Government Furnished Test Items (GFTI), or purchased by the Contractor as Contractor Purchased Test Items (CPTI) as specified in the contract, with the applicable requirements of FMVSS No. 209, Seat Belt Assemblies. 

Seat belt assembly testing may vary from model to model depending on the design and construction of each assembly.  For example, each assembly may require different hardware to set up the test item for testing; some test items may contain pyrotechnics that require appropriate safety handling and precautions; or some test items may contain an automatic locking feature which may require disabling for certain cycle testing.

The Contractor shall conduct the tests in accordance with the procedures specified in Section C.6.5 and the test schedule f C.6.4.  The Contractor shall prepare and submit Preliminary Documents, Monthly Status Reports, Notification of Test Failure and Interim Failure Reports, and Final Test Reports as specified in Sections C.6.6 and F.7.

When test failures are identified, the NHTSA Contracting Officer’s Representative (COR) will contact the Contractor and request information to support its investigation of the test results and may request an onsite visit to review testing and results with or without the manufacturer present. 

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Standards Enforcement Program for FMVSS No. 209, "Seatbelt Assemblies" Original Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Full Scale Vehicle Crashworthiness Testing and Side Air Bag Out-of-Position Testing for the New Car Assessment Program (NCAP) Washington, District of Columbia 20590, United States · NAICS 541380 National Highway Traffic Safety Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity