Sources Sought / HMPT800 Transmission - Industry Feedback
Closed Pre-Solicitation Posted
- Solicitation number
- PANDTA-23-P-0000-004927_HMPT800
- Agency
-
TACOM Life Cycle Management Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336350 Motor Vehicle Transmission and Power Train Parts Manufacturing
Notice details come from SAM.gov. Updated .
About this opportunity
The Army Contracting Command - Detroit Arsenal (ACC-DTA) is seeking industry feedback on providing transmission hardware, Transmission Control Modules (TCMs), Shift Towers, Cable Assemblies, and Systems Technical Support (STS) services for the HMPT800 or equivalent transmission. This is for the Bradley Fighting Vehicle System (BFVS), Paladin Integrated Management (PIM) Vehicle, Armored Multi-Purpose Vehicle (AMPV), and Multiple Launch Rocket System (MLRS) platforms. The government is interested in respondents' manufacturing capabilities, experience, and technical specifications related to the HMPT800 transmission. Responses to the Request for Information (RFI) are due by July 5, 2024, and all questions must be submitted by June 29, 2024. This RFI does not obligate the government to issue a solicitation, and there is no formal solicitation or contract award associated with this request.
There is no set-aside designation for this opportunity. The government has not provided any information about potential incumbents or current contractors. The government has also not disclosed any award values or budget ranges. The RFI does not specify a quantity of goods or timeline for services.
Notice text
3 versions
Update #3 · Latest ·
Posted 04 June 2024 - The purpose of this posting is to extend the sources sought posting cut-off date to gauge industry interest related to the HMPT800 transmissions. The document titled, "HMPT800 Sources Sought_v1_Approved" is updated to include the new cut-off date for responses and questions. For the purpose of this posting, the cut-off date for questions is updated to 29-JUN-2024. The cut-off date for submissions to the RFI is updated to 05-JUL-2024 4:00 PM ET.
As a result of this revision to the posting, vendor responses to the Sources Sought must be received no later than (NLT) Friday, 05-JUL-2024 at 4:00 PM ET.
-----------------------------------------------------------------------------------------------------------------------
Posted 20 June 2023 - The purpose of this posting is to amend the sources sought document due to errors in the initial version. The document titled, "HMPT800 Sources Sought_v1_Approved" overwrites the previously attached version. The cut-off dates for questions and response submissions are extended by seven (7) days. The cut-off date for questions is extended by seven (7) days, from 21-JUN-2023 to 28-JUN-2023. The cut-off date for response submissions is extended by seven (7) days, from 26-JUN-2023 4:00 PM ET to 03-JUL-2023 4:00 PM ET.
As a result of this revision to the posting, vendor responses to the Sources Sought must be received no later than (NLT) Monday, 03-JUL-2023 at 4:00 PM ET.
-----------------------------------------------------------------------------------------------------------------------
The Army Contracting Command - Detroit Arsenal (ACC-DTA) is assisting Program Manager - Mounted Armored Vehicles (PM-MAV) to gauge industry capabilities in providing transmission hardware, Transmission Control Modules (TCMs), Shift Towers, Cable Assemblies, and Systems Technical Support (STS) services for the HMPT800, or equivalent transmission for the Bradley Fighting Vehicle System (BFVS), Paladin Integrated Management (PIM) Vehicle, Armored Multi-Purpose Vehicle (AMPV), and Multiple Launch Rocket System (MLRS) platforms.
Interested vendors are encouraged to review the document titled, "HMPT800 Sources Sought_Approved".
Instructions to respond to this Sources Sought posting are outlined under Section 4. "Instructions for Responding to this Request", within the Market Survey document.
Any questions received by this office five (5) days prior (dated 21-JUN-2023 and after) to the sources sought deadline (dated 26-JUN-2023), will be considered late and may not be answered.
Vendor responses to the RFI must be received no later than Monday, 26-JUN-2023 at 4:00 PM Eastern Time (ET).
Update #2 ·
-----------------------------------------------------------------------------------------------------------------------
Posted 20 June 2023 - The purpose of this posting is to amend the sources sought document due to errors in the initial version. The document titled, "HMPT800 Sources Sought_v1_Approved" overwrites the previously attached version. The cut-off dates for questions and response submissions are extended by seven (7) days. The cut-off date for questions is extended by seven (7) days, from 21-JUN-2023 to 28-JUN-2023. The cut-off date for response submissions is extended by seven (7) days, from 26-JUN-2023 4:00 PM ET to 03-JUL-2023 4:00 PM ET.
As a result of this revision to the posting, vendor responses to the Sources Sought must be received no later than (NLT) Monday, 03-JUL-2023 at 4:00 PM ET.
-----------------------------------------------------------------------------------------------------------------------
The Army Contracting Command - Detroit Arsenal (ACC-DTA) is assisting Program Manager - Mounted Armored Vehicles (PM-MAV) to gauge industry capabilities in providing transmission hardware, Transmission Control Modules (TCMs), Shift Towers, Cable Assemblies, and Systems Technical Support (STS) services for the HMPT800, or equivalent transmission for the Bradley Fighting Vehicle System (BFVS), Paladin Integrated Management (PIM) Vehicle, Armored Multi-Purpose Vehicle (AMPV), and Multiple Launch Rocket System (MLRS) platforms.
Interested vendors are encouraged to review the document titled, "HMPT800 Sources Sought_Approved".
Instructions to respond to this Sources Sought posting are outlined under Section 4. "Instructions for Responding to this Request", within the Market Survey document.
Any questions received by this office five (5) days prior (dated 21-JUN-2023 and after) to the sources sought deadline (dated 26-JUN-2023), will be considered late and may not be answered.
Vendor responses to the RFI must be received no later than Monday, 26-JUN-2023 at 4:00 PM Eastern Time (ET).
Update #1 ·
The Army Contracting Command - Detroit Arsenal (ACC-DTA) is assisting Program Manager - Mounted Armored Vehicles (PM-MAV) to gauge industry capabilities in providing transmission hardware, Transmission Control Modules (TCMs), Shift Towers, Cable Assemblies, and Systems Technical Support (STS) services for the HMPT800, or equivalent transmission for the Bradley Fighting Vehicle System (BFVS), Paladin Integrated Management (PIM) Vehicle, Armored Multi-Purpose Vehicle (AMPV), and Multiple Launch Rocket System (MLRS) platforms.
Interested vendors are encouraged to review the document titled, "HMPT800 Sources Sought_Approved".
Instructions to respond to this Sources Sought posting are outlined under Section 4. "Instructions for Responding to this Request", within the Market Survey document.
Any questions received by this office five (5) days prior (dated 21-JUN-2023 and after) to the sources sought deadline (dated 26-JUN-2023), will be considered late and may not be answered.
Vendor responses to the RFI must be received no later than Monday, 26-JUN-2023 at 4:00 PM Eastern Time (ET).
Files
| File | Type | Posted |
|---|---|---|
| HMPT800 Sources Sought_v1_Approved.docx | DOCX document | |
| HMPT800 Sources Sought_v1_Approved.docx | DOCX document | |
| HMPT800 Sources Sought_Approved.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Sources Sought-Vehicular Final Drive | Department of the Army | Total Small Business | |
| Transfer transmission | Land and Maritime | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity