Sources Sought - AL - Class 2 Rip Rap 44. 4K Tons
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140F0S23Q0016
- Agency
- Fish and Wildlife Service Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 212319 Other Crushed and Broken Stone Mining and Quarrying
- PSC
- 5610 Mineral Construction Materials, Bulk
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Fish and Wildlife Service is seeking sources that can deliver 44,444 tons of class 2 riprap weighing approximately 200 pounds per ton to be delivered by barge and placed along County Road 129 in Wheeler National Wildlife Refuge, Alabama between June 1, 2023 and September 15, 2023. Interested sources must provide their DUNS number, CAGE code, confirmation of barge delivery capabilities within the specified timeframe, and the location of the quarry where the riprap will be sourced by February 13, 2023.
There is no set-aside designated for this requirement. Sources will need to deliver the full 44,444 tons of class 2 riprap, weighing no more than 200 pounds per ton, with no more than 10% having a diameter greater than 16 inches or less than 6 inches. Placement of the riprap will stabilize the banks of Rockhouse and Jolly Bottom roads spanning 7.2 miles within the specified dates.
Notice text
AL-WHEELER NWR-RIPRAP
This is a sources sought for Rip Rap / Stone / Rock for Wheeler NWR, AL.
In total, these roads span 7.2 lane miles.
In support of the bank stabilization of Rockhouse and Jolly Bottom roads, 44,444 tons of class #2 riprap weighing an estimated 200 lbs be delivered and place by barge. Placement will occur along the North side of the Tennessee River in various locations along County Road 129. Expected delivery locations can be seen via the associate map.
Materials required are:
Class 2 RipRap 44,444 Tons
Class 2 Rip Rap:
No more than 10% of the stone will have a diameter greater than sixteen (16) inches; no more than 50% of the stone will have a diameter less than twelve (12) inches; and no more than 10% of the stone will have a diameter of less than six (6) inches. The thickness of the rip-rap liner will be no less than sixteen (16) inches.
Please see attached site map.
If you are interested in the work, please email the following information to Robert_Sung@fws.gov by 2/13/2023 at 10 AM Pacific Time.
1. DUNS # and CAGE code
2. A statement that your firm can deliver in full via barge and offloaded between 6/01/23 and 09/15/23.
3. Provide the location of the quarry the rip rap will be sourced from.
Businesses of all sizes are encouraged to respond.
Attachments
| File | Type | Posted |
|---|---|---|
| A06_-_Delivery_Map_1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| AL-wheeler NWR-riprap | Award Notice | |
| AL - Class 2 Rip Rap 44. 4K Tons | Solicitation | |
| Sources Sought - AL - Class 2 Rip Rap 44. 4K Tons | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity