Solid State High Voltage Switching Device for Multi-Point Initiation

Closed Solicitation Posted

Solicitation number
A16-066
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
AC12 National Defense R&D Services; Department Of Defense - Military; Applied Research
More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

Notice text

DoD SBIR topic A16-066

Component: ARMY

Command: PEO AMMO

Phase: SBIR Program Phase I Action

Technology Areas: Weapons

Keywords: fuze; fuzing; switch; thyristor; solid state; high voltage; discharge; pulsed power; electronic; semiconductor; component manufacture; munition; initiation; armament; safe arm; transistor; field effect transistor; diode; multi-point

Objective:

The objective of this effort is to develop a small, low cost, solid state, high voltage switching device for electronic fuzing applications. Emphasis during all phases of this project should be on developing a device that meets performance requirements with minimized cost and no larger than the size of the current prototypes (preferably smaller).

Description:

A typical multi-point electronics design utilizes one or more high voltage switches. These switches are significant contributors to the cost and size of the multi-point system, making them non-starters for many munition applications. Current state of the art switches that are used in these applications cost $100-$200 per switch and are approximately 110mm^3 for a 1400V device. Two Army programs have investigated the use of electronic switching to increase reliability and performance, however it is currently cost prohibitive. Similarly, emerging warhead technologies will require multi-point initiation to achieve scalable lethality and focused effects, which would also have to be cost effective for implementation. Examples of new technologies that may enable the development of the desired switch are Silicon Carbide (SiC) and Trench and Field Stop (TFS) Field Effect Transistors (FETs) or Insulated Gate Bipolar Transistors (IGBTs). Key requirements for this switching device are a volume of less than 100 cubic mm (smaller is better), turn on time of less than 150ns (+/- 10%), operating temperature range of -45º to +145ºF, ability to survive high G environments (up to 20,000G), standoff capability of 1000-1500 V, high rate of change of current capability greater than 25kA/µs, switching efficiency greater than 85%, and leakage current less than 5µA. The desired unit cost is $5 each in quantities of 10,000 or more (not a guaranteed production rate). The device packaging should be a standard surface mount package, with low inductance (

Phase I:

During Phase I, a feasibility study of the proposed switching concept shall be conducted to provide evidence that demonstrates the concept can meet the stated requirements. This study should identify the equipment and resources needed to prototype a device, as well as initial device designs and unit cost estimates, with sufficient rationale. The Phase 1 deliverable is a final report to include the plan to build and test the prototype in Phase II.

Phase II:

Phase II shall begin by prototyping the initial device design and evaluating its performance against the stated requirements. It is expected that one or more design iterations will occur during the 2nd phase. Phase II will end with a proof-of-concept prototype that demonstrates the performance and producibility of the device. Deliverables include quarterly progress reports, prototype hardware, a manufacturing plan, and a final report, including product cost data.

Phase III:

Phase III shall begin with the execution of the manufacturing plan developed in Phase II. Continued development of the device shall be pursued to increase yields and reduce manufacturing costs. Key military applications for these devices include fuzing, electronic safe and arm devices, and ignition safety devices.

Files

File Type Posted
A16-066.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors