Solicitation - clarksville-structure 87 line rebuild

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
89503620BSW000019
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Clarksville AR 72830 USA
More information

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of Energy Southeastern Power Administration seeks to completely remove and rebuild approximately 15.06 miles of the Clarksville to Structure 87 portion of the Norfolk to Van Buren 161kV transmission line. The contractor will remove all existing structures, conductor, shield wire, grounding and other items except the existing OPGW, and rebuild the line with all new materials including galvanized steel H-frame structures and 1192.5 kcmil Grackle phase conductor. The new line must also include the installation of new OPGW along with the transfer of existing OPGW. Proposals are due by September 10, 2020.

This is a total small business set-aside solicitation. The anticipated NAICS codes are 238210 and 238220, with the primary PSC code being R408. The place of performance is Clarksville, Arkansas. The solicitation does not provide budget details but seeks the complete removal and rebuild of over 15 miles of transmission line, indicating a sizable contract value.

Notice text

4 versions

Update #4 · Latest ·

The Abstract of Bids has been posted to FedConnect (September 11, 2020).

Amendment 05 has now been posted to revise the SOW to better address the Right of Way clearing.

Amendment 04 has been posted to add Questions and Answers as well as updating two other sections of the solicitation.  The due date has not changed, bids are still due September 10, 2020 at 2:00 p.m. CT. 

The work under this solicitation shall include furnishing all labor and materials necessary to completely remove and rebuild the Clarksville to Structure 87 portion of the Norfolk to Van Buren 161kV transmission line.  The contractor shall remove all structures, conductor, shield wire, grounding and all other items associated with this line except the existing OPGW and rebuild the line with all new materials.  The total length of the rebuild is approximately 15.06 miles.  The existing line is predominantly of wood pole, H-frame construction with 556.5 kcmil ACSR conductor. The new line shall consist of predominantly H-frame construction utilizing galvanized steel structures.  The new phase conductor shall be 1192.5 kcmil, Grackle conductor. New OPGW will be installed end to end in addition to the transfer of existing OPGW which will be located in the structure position opposite of the new OPGW cable.

Update #3 ·

Amendment 05 has now been posted to revise the SOW to better address the Right of Way clearing.

Amendment 04 has been posted to add Questions and Answers as well as updating two other sections of the solicitation.  The due date has not changed, bids are still due September 10, 2020 at 2:00 p.m. CT. 

The work under this solicitation shall include furnishing all labor and materials necessary to completely remove and rebuild the Clarksville to Structure 87 portion of the Norfolk to Van Buren 161kV transmission line.  The contractor shall remove all structures, conductor, shield wire, grounding and all other items associated with this line except the existing OPGW and rebuild the line with all new materials.  The total length of the rebuild is approximately 15.06 miles.  The existing line is predominantly of wood pole, H-frame construction with 556.5 kcmil ACSR conductor. The new line shall consist of predominantly H-frame construction utilizing galvanized steel structures.  The new phase conductor shall be 1192.5 kcmil, Grackle conductor. New OPGW will be installed end to end in addition to the transfer of existing OPGW which will be located in the structure position opposite of the new OPGW cable.

Update #2 ·

Amendment 04 has been posted to add Questions and Answers as well as updating two other sections of the solicitation.  The due date has not changed, bids are still due September 10, 2020 at 2:00 p.m. CT. 

The work under this solicitation shall include furnishing all labor and materials necessary to completely remove and rebuild the Clarksville to Structure 87 portion of the Norfolk to Van Buren 161kV transmission line.  The contractor shall remove all structures, conductor, shield wire, grounding and all other items associated with this line except the existing OPGW and rebuild the line with all new materials.  The total length of the rebuild is approximately 15.06 miles.  The existing line is predominantly of wood pole, H-frame construction with 556.5 kcmil ACSR conductor. The new line shall consist of predominantly H-frame construction utilizing galvanized steel structures.  The new phase conductor shall be 1192.5 kcmil, Grackle conductor. New OPGW will be installed end to end in addition to the transfer of existing OPGW which will be located in the structure position opposite of the new OPGW cable.

Update #1 ·

The work under this solicitation shall include furnishing all labor and materials necessary to completely remove and rebuild the Clarksville to Structure 87 portion of the Norfolk to Van Buren 161kV transmission line.  The contractor shall remove all structures, conductor, shield wire, grounding and all other items associated with this line except the existing OPGW and rebuild the line with all new materials.  The total length of the rebuild is approximately 15.06 miles.  The existing line is predominantly of wood pole, H-frame construction with 556.5 kcmil ACSR conductor. The new line shall consist of predominantly H-frame construction utilizing galvanized steel structures.  The new phase conductor shall be 1192.5 kcmil, Grackle conductor. New OPGW will be installed end to end in addition to the transfer of existing OPGW which will be located in the structure position opposite of the new OPGW cable.

Notice history

Notice Type Posted
Award Notice - CLARKSVILLE-STRUCTURE 87 LINE REBUILD Award Award Notice
This notice Latest solicitation Solicitation
Synopsis-clarksville-structure 87 line rebuild Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors