Solenoid Electrical
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- SPE7MX21R0153
- Agency
- Land and Maritime Defense Logistics Agency, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 335314 Relay and Industrial Control Manufacturing
- PSC
- 5945 Relays And Solenoids
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
*Amendment #0001 is being issued 29 MARCH 2022 to reopen the solicitation, and to extend the closing date to 13 MAY 2022.*
PART NUMBER Specifications, plans, or drawings related to the procurement described are not available and cannot be furnished by the Government.
RIGHTS GUARD OR CONTROLLED TECHNICAL DATA PACKAGE APPLIES
(Include one of the following notices in the synopsis whenever the solicitation exceeds $25,000 and it requires Right Guard technical data or a Controlled Technical Data Package (CTDP)): This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-100.
INCREMENTAL QUANTITIES MIN 50 MAX 1,395
DURATION OF CONTRACT PERIOD 3
OTHER THAN FULL AND OPEN (10 U.S.C. 2304(c)(1) (FAR 6.302-1)
MORE THAN ONE SOURCE, INTENDED SOURCES:
NUMBERED NOTES:
1 100% Set-Aside for Small Business
8 Export Control Certification
26 Commercial Notice (when the Government does not intend to use Part 12, Commercial Acquisition Procedures) (FAR 5.206(e)(4))
Contractor First Article Test Required
Evaluation Factors: The final contract award decision may be based upon a combination of price, past performance, and other evaluation factors as described in the solicitation.
REMARKS: All responsible sources may submit an offer/quote which shall be considered. This acquisition is for an Indefinite Quantity, Fixed Price contract. FAR Part 15 – Contracting by Negotiations. The proposed procurement is for a 3-year base period. The total shall not exceed 3 years.
Award will be made on an all or none basis per NSN for the supplies covered under this contract. While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation. Copies of the solicitation will be available 15 days after this notice is published in the DIBBS at https://www.dibbs.bsm.dla.mil/RFP.
Update #1 ·
PART NUMBER Specifications, plans, or drawings related to the procurement described are not available and cannot be furnished by the Government.
RIGHTS GUARD OR CONTROLLED TECHNICAL DATA PACKAGE APPLIES
(Include one of the following notices in the synopsis whenever the solicitation exceeds $25,000 and it requires Right Guard technical data or a Controlled Technical Data Package (CTDP)): This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-100.
INCREMENTAL QUANTITIES MIN 30 MAX 1,395
DURATION OF CONTRACT PERIOD 5
OTHER THAN FULL AND OPEN (10 U.S.C. 2304(c)(1) (FAR 6.302-1)
MORE THAN ONE SOURCE, INTENDED SOURCES:
NUMBERED NOTES:
1 100% Set-Aside for Small Business
8 Export Control Certification
26 Commercial Notice (when the Government does not intend to use Part 12, Commercial Acquisition Procedures) (FAR 5.206(e)(4))
Contractor First Article Test Required
Evaluation Factors: (Type this statement) The final contract award decision may be based upon a combination of price, past performance, and other evaluation factors as described in the solicitation.
REMARKS: All responsible sources may submit an offer/quote which shall be considered. This acquisition is for an Indefinite Quantity, Fixed Price contract. FAR Part 15 – Contracting by Negotiations. The proposed procurement is for a 5-year base period. The total shall not exceed 5 years.
Award will be made on an all or none basis per NSN for the supplies covered under this contract. While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation. Copies of the solicitation will be available 15 days after this notice is published in the DIBBS at https://www.dibbs.bsm.dla.mil/RFP.
Attachments
| File | Type | Posted |
|---|---|---|
| SPE7MX21R0153 - Amendment 0001.pdf | ||
| NSN Data.xlsx | XLSX spreadsheet |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Solenoid, electrical | Award Notice | |
| Solenoid Electrical | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity