Small Business Set Aside for Fabrication of Reservoir Drain Tube Assembly Per Attachments. First Article requested. Request Access to the drawings through SAM. Provide your Cage Code when requesting drawing access in SAM.

Closed Solicitation Posted

Solicitation number
N61331-22-T-JK57
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
331210 Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
PSC
2090 Miscellaneous Ship And Marine Equipment
Place of performance
Panama City Beach, Florida 32407, United States

Notice details come from SAM.gov. Updated .

Notice text

Small Business Set Aside. Email quotes to jamell.kilgore@navy.mil on or before the closing date and time of Thursday 29 September 2022 11am Central Time. The Government will not accept late quotes. Provide cage code and Lead time on your quote. Be able to invoice through Wide Area Workflow (WAWF). IF shipping is not included in the price please include a line item for shipping.  See the attached Statement of Work, CDRL,  Drawings, and Clauses. Please review all attachments.  Request Access to the drawings through SAM. Provide your Cage Code when requesting drawing access in SAM.

                                               FABRICATION OF RESERVOIR DRAIN TUBE ASSEMBLY

            The Naval Surface Warfare Center Panama City Division (NSWC PCD) has a requirement for the fabrication of twenty (20) reservoir drain tube assemblies.  The contractor shall provide all facilities, personnel, and materials to fabricate the equipment.  The contractor shall fabricate and deliver one (1) first article unit in accordance with NAVSEA Drawing 7110381 Rev C.  Government acceptance or rejection of the first article unit will be provided within thirty (30) days after receipt of the first article unit.  Upon formal approval of the first article unit by the Procuring Contracting Officer (PCO), the contractor shall fabricate 19 production units in accordance with NAVSEA Drawing 7110381 Rev C.  Each production unit shall be tested and inspected in accordance with a Government approved test plan.  The contractor shall document the test/inspection results and submit concurrently with the production reservoir drain tube assemblies.

Files

File Type Posted
C24 - Clauses.pdf PDF
A8 - CDRL.pdf PDF
A5 - Statement of Work.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors