Slide Repair - Request for Information
Closed Pre-Solicitation Posted
A newer special notice was posted. See the latest special notice from .
- Solicitation number
- W912P518S0009
- Agency
- ENDIST Nashville US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912P518P0064 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Loyall, Kentucky 40854, United States
Notice details come from SAM.gov. Updated .
Notice text
REQUEST FOR INFORMATION
The Government is issuing this Request for Information to determine a competitive basis. THIS IS NOT A SOLICITATION. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information.
REQUIREMENT
The Nashville District, U.S. Army Corps of Engineers (USACE), anticipates a requirement for a firm fixed-price construction contract for Slide Repair at the Wix-Howard Cemetery in Loyall, Harlan County, KY. The work consists of furnishing all equipment, materials, methods, and labor for performing all operations required for removal of the slide mass, scaling and stabilizing the slope, and placing a rock buttress against the remaining slope. Construction shall include coordination with local utilities companies for removing their existing service.
The diversion channel, earthen embankments, floodwall, and closure structures near Loyall, KY were constructed and completed as part of the Harlan Flood Protection Project in 1999. These construction efforts were the third and final phase of the project. The project was constructed to
divert the potentially damaging Cumberland River flows from the town center in Loyall, KY, and also provide protection to Rio Vista. The previous Cumberland River channel is now used for interior drainage purposes during storm events. Recently, a slide developed that is threatening the Wix-Howard Cemetery. This was first observed in February 2016 after several months of significant rainfall. Ground movement of this type is most often triggered by a rising water table, usually caused by rain, increasing hydrostatic forces on a block of rock delineated by discontinuities. Due to these additional forces and the failure plane daylighting in the cut, rock on the face of the diversion channel cut has shifted outward toward the river, and the slide has destabilized a portion of the Wix-Howard Cemetery.
The anticipated NAICS code is 237990: OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION, with a Small Business Size Standard of $36.5 million dollars.
Magnitude of Construction: Between $1,000,000 to $5,000,000.
Survey
The Government is issuing this notice to determine a competitive basis. THIS IS NOT A SOLICITATION. The items listed herein are subject to change or elimination from the requirement. No reimbursement will be made for any costs associated with providing information in response to this survey.
This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information.
Your response to this survey is requested by 2:00 p.m. Central Time, Tuesday, September 25, 2018. Please send by email to debra.a.barlow@usace.army.mil.
1. Name of your firm:
2. CAGE:
3. Point of Contact and E-MAIL address:
4. Company Website (if any):
5. Please list (3) three projects successfully completed similar to the above referenced type of work and construction magnitude:
a. Project Name:
Contract Number (if applicable):
Year Completed:
Prime Contractor or Sub-Contractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
b. Project Name:
Contract Number (if applicable):
Year Completed:
Prime Contractor or Sub-Contractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
c. Project Name:
Contract Number (if applicable):
Year Completed:
Prime Contractor or Sub-Contractor:
Type and percentage of work self-performed (based on contract value):
Dollar Amount:
General Description of project:
6. Are you a Small Business classified under the above NAICS code? (Please respond yes or no).
7. Please list any Special Small Business Certifications you currently possess (e.g. Women-Owned Small Business, Service-Disabled Veteran Owned Small Business, HubZone, 8(a), etc.):
8. If your company is a small business concern, per FAR 52.219-14, at least 15 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. Can your firm be expected to do this, given your current employee situation?
9. Do you anticipate it is likely your firm possesses the manpower, facilities, and financial resources available to perform a contract of this magnitude?
10. The potential contract will be require to provide Performance and Payment bonds. Does your firm have the capability of attaining bonds for the construction magnitude listed above? (Please respond yes or no).
11. If this requirement is advertised, do you anticipate submitting a bid?
12. Comments:
.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Parking Convention Center Authority_Music City Center Garage | Special Notice | |
| Slide Repair - Request for Information | Pre-Solicitation |