Skid Mounted Pump, Fleet Logistics Center Pearl Harbor, Hawaii

Award Notice Posted

Solicitation number
N0060416T3054
Agency
Awarded
to H2O Process Systems, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
N0060416P3241 Federal contract award
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Pioneer Skid Mounted Pump with Trailer Packer, Manufacturer Pioneer Pump Model No PP1818S22L71-6090HF485

Update #1 ·

This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR Subpart 12.6, using Simplified Acquisition Procedures for Certain Commercial Items found at FAR 13.5, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. This combined synopsis/solicitation SHALL be posted on both FEDBIZOPPS and NECO (https://www.neco.navy.mil/).



The RFQ number is N00604-16-T-3054. This solicitation documents and incorporates provisions and clauses in effect through FAC 2005-87 and DFARS Publication Notice 20160226.

It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://www.acquisition.gov/far/ and http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html. The NAICS code is 333911 and the Small Business Standard is 750 Employees. A sources sought notice was posted to NECO and FBO on March 08, 2016 and as a result of the responses and market research, the proposed contract is 100% set aside for small business concerns. The Small Business Office concurs with the set-aside decision. The proposed contract action is for a brand name or equal product.



Equipment Condition: New Equipment ONLY; NO remanufactured or gray market items.

All items must be covered by the manufacturers warranty.



The NAVSUP FLC Regional Contracting Department Pearl Harbor requests responses from qualified sources capable of providing:



Description QTY Unit of Issue Unit Price Extended Total

0001 – Pioneer Skid Mounted Pump with 2 Each $ $__________

Trailer Packer or equal.

Manufacturer: Pioneer Pump

Model No: PP1818S22L71-6090HF485



0002 – Destination Shipping to Hawaii 1 Each $ $__________

NAVFAC Hawaii

400 Marshall Road, Bldg 44

Joint Base Pearl Harbor Hickam, 96860



TOTAL EVALUATED PRICE (FOB DEST ONLY) $__________



Delivery: 14 Weeks After Date of Contract



Salient Characteristics for CLIN 0001:

Skid Mounted Pump with Trailer Package:

200 gal Integral Fuel Tank with Coated Steel Sound Attenuated Enclosure.

Trailer shall be of adequate size to support pump.



Pump Details:

Suction Flange: 18â€

Discharge Flange: 18â€

Auto Start/Stop Programmable Engine Control Panel

Design Conditions: 6500 GPM @ 110’ TDH

Maximum Impeller Diameter: 22.5â€

Impeller ASTM A744 CA6NM Stainless Steel

Vacuum Pump 50 C.F.M of air handling ability

Maximum NPSHr: 10’

Minimum Pump Efficiency: 70%

Maximum Pump Speed: 950 RPM

Minimum spherical solids handling capability 4.5 inch

User interface: Remote start/stop capable



Engine Specifications:

Type: Water Cooled, Diesel, In-Line, 4 Cycle

Number of Cylinders: Six

Aspiration: Turbocharged

Min.

Continuous Duty Rating of 315HP @ 1800 RPM

Displacement: 548 Cubic Inches (9 L)

Governor: Electronic

EPA Compliance: Flexed Tier 3

Heavy Duty Battery and Brakes

Auto Start/Stop Programmable Engine Control Panel



Basis for Award: Lowest Price Technically Acceptable (LPTA)



The Government will award a contract action resulting from this synopsis-solicitation to the responsible offeror whose quote, conforming to this solicitation, is evaluated to be the lowest priced technically acceptable (LPTA) quote. The ratings for the technical factors shall be Acceptable or Unacceptable. The following factors shall be used to evaluate quotes. Experience and Past Performance are the technical factors.



Factor 1 – Meets or Exceeds Technical Acceptability

Factor 2 - Past Performance (no less than Satisfactory/Acceptable performance ratings)



AND



Factor 3 – Total evaluated price.

The basis for the total evaluated price is the total of

all CLINs)



Submission Requirements and Evaluation:



Factor 1 –Submit specification sheets, cut sheets, and/or product literature for the Skid Mounted Pump with Trailer Package that addresses all salient characteristics. If providing an “or equal†product for CLIN 0001, please submit the applicable product literature with your quote to enable the Government to conduct a comprehensive evaluation. Please indicate how the “equal†product meets or exceeds the minimum requirements stated above. If your product literature or your quote is not in sufficient detail to conduct a comprehensive evaluation of your product, your quote may be evaluated Unacceptable.





Factor 1 - Experience

Rating Description

Acceptable (A) Product meets or exceeds the minimum specifications.

Unacceptable (U) Product does not clearly meet the minimum specifications.



Factor 2 – Do not submit past performance information. The Government will access the Past Performance Information Retrieval System (PPIRS) to obtain past performance information on your firm, utilizing the DUNS number obtained from the Systems for Award Management (SAM) website. If no past performance information is available, Factor 2 will be evaluated Neutral, which is considered Acceptable. If your firm has less than Satisfactory performance evaluations in PPIRS, you may submit acceptable explanations for the ratings for the Government’s consideration.

Acceptable explanations will result in an Acceptable rating for Past Performance.



Factor 2 – Past Performance



Ratings Description

Acceptable (A) Based on the performance records, the Government has a reasonable expectation that the quoter will successfully deliver the Skid Mounted Pump with Trailer Packer or the quoter’s performance record is unknown.

Unacceptable (U) Based on the performance records, the Government has no reasonable expectation that the quoter will be able to successfully deliver the Skid Mounted Pump with Trailer Packer.

Unknown (UNK) In the case of a quoter without a record of past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance.

Therefore, the quoter shall be determined to have Neutral past performance. In the context of acceptability/unacceptability, the Neutral shall be considered ‘acceptable.â€



In order to be evaluated overall Acceptable, a rating of Acceptable shall be obtained for both Factors 1 and 2. If either one or both are rated Unacceptable, the entire technical quote will be rated Unacceptable and will be removed from further consideration for award.



Price. The Government will evaluate all prices by listing the total of all items (total evaluated price) from the lowest to the highest. Total evaluated price includes pricing submitted for the base and all option periods. Hauling charges shall be included in the unit prices submitted.





The Government will take the five lowest quotes received and evaluate the corresponding technical factors for acceptability. Should the Government identify one quote that represents the lowest priced technically acceptable quote, the Government may make an award as long as the total evaluated price can be determined fair and reasonable. Should there be no technically acceptable quote among the first five lowest quotes, the Government will evaluate the next five lowest quotes for technical acceptability. The Government will continue this methodology of evaluation until a quote is evaluated to be the lowest priced technically acceptable quote with a reasonable price.



Award will only be made to a firm that is determined to be responsible in accordance with FAR Part 9.



Submission Requirements: By submission of a quote, the quoter agrees to all requirements contained in this solicitation.

Offerors shall include with their quotes the following, as well as any additional information and certifications with reference to the provisions contained herein:



1) A price for CLINS 0001 and 0002.



2) Submission of specification sheets, cut sheets, and/or product literature if quoting on an equal product that addresses all salient characteristics.



3) Point of contact name, phone number, and email address. CAGE and DUNS numbers. Business size. Discount payment terms, if any.



4) A completed copy of 52.212-3 and its ALT I (Attachment A). If the quoter has completed the annual representations and certification electronically via the System for Award Management (SAM) Web Site, the quoter shall only complete paragraph (b) of this provision.

If the quoter fails to submit a completed Attachment A, the quote may be evaluated Unacceptable.



5) A completed copy of FAR 52.209-11, (Attachment B). If the quoter fails to submit a completed Attachment B, the quote may be evaluated Unacceptable.



6) A completed copy of FAR 52.204-20, (Attachment C). If the quoter fails to submit a completed Attachment C, the quote may be evaluated Unacceptable



Payment will be made by NAVFAC Hawaii Comptroller office via EFT.



Responsibility and Inspection: Unless otherwise specified in the order, the supplier is responsible for the performance of all inspection requirements and quality control.



The following FAR provision and clauses are applicable to this procurement:

52.203-3 Gratuities

52.203-6 with Alt I Restrictions on Subcontractor Sales to the Govt

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

52.204-7 System for Award Management

52.204-13 SAM Maintenance

52.204-16 Commercial and Government Entity Code Reporting

52.204-18 Commercial and Government Entity Code Maintenance

52.209-2 Prohibition on Contracting with Inverted Domestic Corporations—Representation

52.209-5 Certification Regarding Responsibility Matters

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations

52.211-6 Brand Name or Equal

52.212-1 Instructions to Offerors - Commercial Items

52.212-3 and its ALT I, Offeror Representations and Certifications - Commercial Items

52.212-4 Contract Terms and Conditions - Commercial Items

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial

Items

52.219-6 Notice of Total Small Business Set-Aside

52.219-8 Utilization of Small Business Concerns

52.219-14 Limitations on Subcontracting

52.219-28 Post Award Small Business Program Rerepresentation

52.222-3 Convict Labor

52.222-19 Child Labor—Cooperation with Authorities and Remedies

52.222-21 Prohibition of Segregated Facilities

52.222-22 Previous Contracts and Compliance Reports

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Reps and Certs

52.222-26 Equal Opportunity

52.222-35 Equal Opportunity for Veterans

52.222-36 Affirmative Action for Workers with Disabilities

52.222-37 Employment Reports on Disabled Veterans

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

52.222-50 Combating Trafficking in Persons

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

52.225-13 Restriction on Foreign Purchases

52.232-33 Payment by Electronic Funds Transfer – SAM

52.232-39 Unenforceability of Unauthorized Obligations

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

52.233-2 Service of Protest

52.233-3 Protest After Award

52.233-4 Applicable Law for Breach of Contract Claim

52.247-34 FOB Destination

52.252-1 Solicitation Provisions Incorporated by Reference

52.252-2 Clauses Incorporated by Reference



Quoters are reminded to include a completed copy of 52.212-3 and its ALT I with quotes.

All clauses shall be incorporated by reference in the order. Additional contract terms and conditions applicable to this procurement are:



252.203-7000 Requirements Relating To Compensation of Former DoD Officials

252.203-7002 Requirement to Inform Employees of Whistleblower Rights

252.203-7005 Representation Relating To Compensation of Former DoD Officials

252.203-7996 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements — Representation (Dev 2016-O0003)

252.203-7997 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (Dev 2016-O0003)

252.204-7003 Control of Government Personnel Work Product

252.204-7004 Alt A System for Award Management

252.204-7008 Compliance with Safeguarding Covered Defense Information Controls

252.204-7011 Alternative Line Item Structure

252.204-7012 Safeguarding of Unclassified Controlled Technical Information

252.204-7015 Disclosure of Information To Litigation Support Contractors

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism

252.211-7003 Item Identification and Valuation

252.213-7000 Notice to Prospective Suppliers on Use of PPIRS-SR in Past Performance Evaluations

252.222-7007 Representation Regarding Combating Trafficking in Persons

252.223-7008 Prohibition of Hexavalent Chromium

252.225-7000 Buy American Act-Balance of Payments Program Certificate

252.225-7001 Buy American Act and Balance of Payments Program

252.225-7002 Qualifying Country Sources as Subcontractors

252.225-7048 Export-Controlled Items

252.232-7010 Levies On Contract Payments

252.243-7002 Requests for Equitable Adjustment

252.244-7000 Subcontracts For Commercial Items And Commercial Components (DoD Contracts)

252.247-7023 Transportation of Supplies by Sea



This announcement will close at 10:00AM HST on May 03, 2016.

Quotes must be received via email to norine.horikawa@navy.mil by this time and date to be considered responsive. Questions shall be submitted to Norine Horikawa via email at norine.horikawa@navy.mil by 10:00AM HST on April 27, 2016. Oral communications are not acceptable in response to this notice. All responsible sources may submit a quote which shall be considered by the agency.



System for Award Management (SAM). Quoters must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.



Attachments

Attachment A FAR 52.212-3 and ALT 1

Attachment B FAR 52.209-11

Attachment C FAR 52.204-20



******* End of Combined Synopsis/Solicitation ********

Files

File Type Posted
QandA_1.pdf PDF
ComSynopSolit_Amd__01.pdf PDF
Attach_C_FAR_52.204-20_Provision.pdf PDF
Attch_B_FAR_52.209-11_Tax_Liability.pdf PDF
Attch_A_FAR_52.212-3_AltI(APR_2016).pdf PDF

Notice history

Notice Type Posted
This notice Latest Award Notice
NAVFAC Pump Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors