Skiatook Wet Well
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W912BV24RKT01
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Skiatook, Oklahoma, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers - Tulsa District is seeking information from interested contractors, including small businesses, to replace the low flow and wet well gates at Skiatook Lake, Oklahoma. The project will involve staged construction where the contractor will replace one existing gate in one wet well at a time, starting from the topmost gate and working downwards. The contractor may be required to use temporary work platforms and portable cranes to facilitate personnel, material movement, and gate replacement. Responses are due by June 24, 2024, and the solicitation is anticipated to be issued around September 2024.
This procurement is not set aside for any specific business category. The government has not provided an estimated contract value, but has indicated the range could be between $1,000,000 and $5,000,000, with the construction duration to be determined. The government is seeking information on the capabilities, qualifications, and interest of potential contractors, including their business size, bonding capacity, and any joint ventures or teaming arrangements.
Notice text
Government anticipates staged construction where contractor will replace one existing gate in one wet well at any one time starting from the topmost gate and working downwards. In addition, there are gate lifting constraints in the wet wells since the existing wet well inlet gates do not line up with the grating in the floor above. The Government anticipates temporary work platforms to facilitate personnel action, material movement and gate replacement. Contractor may be required to utilize portable cranes to lift the existing gates to the surface and to lower the new gates to the platform below. The wet well low flow outlet slide gate and low flow outlet slide gate will have be to be kept open during the gate replacement work to drain the leaking water from the gates out of the wet wells. This will help in keeping the water level low in the wet well where gates are being replaced.
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought Skiatook Wet Well.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Skiatook Low flow and Wet Well Gates | Solicitation | |
| Skiatook Wet Well | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Arcadia Wet Well Rehabilitation | ENDIST Tulsa | No set-aside | |
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside | |
| Sewage Ejector and Line Assessment | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity