Shirttail Creek AOP, Tahoe National Forest

Award Notice Posted

Solicitation number
129JGP18R0029
Agency
Awarded
to Steelhead Constructors Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
129JGP18C0041 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
The project is located in Placer County, CA on the American River Ranger District of the Tahoe National Forest on National Forest System Road 24 at the Shirttail Creek crossing located 14.6 miles Northeast of Foresthill, CA. 39.151793, -120.757569 Note: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. (See Section L, 52.236-27, Site Visit.) Foresthill, California, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

A site visit for this soolicitation will be held on 28 Mar 2018 @ 10:00am at the job location.    All inquiries should be in writing to the contrating officer.

Update #1 ·

This project is to remove an existing culvert (5' diameter CMP) and replace with an open bottom arch, multi-plate structure (16' span by 5'-3" rise) and stream simulation. Major work items include (but are not limited to) clearing and grubbing, site dewatering, removal and disposal of existing culvert and concrete headwalls, furnishing and installation of bottomless steel plate pipe arch and reinforced stemwalls and footings, rip rap placement, stream simulation, waste material disposal and placement of roadway aggregate surface course. The site will require extensive dewatering and a dewatering plan will be a required submittal. A full road closure will be implemented for the construction period within the project vicinity. Contractor is responsible for furnishing all labor, equipment, supervision, materials and required testing necessary to complete the project as shown in the specifications and drawings. Option to install a rolling dip is included in the project.

Best Management Practices have been effective in protecting beneficial uses within the affected watersheds. Most are BMPs from the Forest Service publication "Water Quality Management for National Forest System Lands in California" (USDA Forest Service, 201, R5 FSH 2509.22 Chapter 10). All applicable water quality BMPs shall be implemented. The implementation phase of the BMPs occur after a project is completed, but before the winter season. BMP monitoring of the project is done one year later after the project experiences one rainy season. A list of BMPs used within this project: BMP 2.13, BMP 2.3, BMP 2.4, BMP 2.5, BMP 2.8, BMP 2.11, BMP 4.5, BMP 7.1, BMP 7.4, BMP 7.6, BMP 7.8.

Files

File Type Posted
2-Site_Plan.pdf PDF
6-_Stream_Simulation_adn_Plan_Details.pdf PDF
5-_Stream_Plan_and_Profile.pdf PDF
129JGP18R0029_Shirttail_Creek_APO.pdf PDF
9-_Optional_Rolling_Dip.pdf PDF
Wage_Determination.pdf PDF
Supplemental_Specs.pdf PDF
4-Roadway_Sections_and_Detail.pdf PDF
Fire_Plan.pdf PDF
1-Title.pdf PDF
7_&__8-Open_Bottom_Arch_Plan_and_Profile_and_Abutment_Details.pdf PDF
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors