Shaft, rotor, transmission

Awarded Award Notice Posted

Solicitation number
SPE4A715R1868
Agency
Aviation Defense Logistics Agency, Department of Defense
Awarded
to Heligear Acquisition CO.
Set-aside
No set-aside

Opportunity facts

Contract number
SPE4A716C0022 Federal contract award
NAICS code
336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC
Not on record
Place of performance
Dla Aviation 8000 Jefferson Davis Hwy Richmond, Virginia 23297, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Apr 16, 2015 4:17 pm Modified: Apr 17, 2015 11:16 amTrack Changes "A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP  <https://www.dibbs.bsm.dla.mil/RFP>    on the same issue date cited in the solicitation.  Choose the RFP you wish to download.  Solicitations are in portable document format (PDF).  To download and view these documents you will need the latest version of Adobe Arobat Reader.  This software is available free at http://www.adobe.com <http://www.adobe.com> .  A paper copy of the solicitation will not be available to requestors.  The RFP-solicitation issue date 05/01/2015 and respond due date 06/02/2015.

 This requirement was authorized by purchase request 0057969396 and solicit as Unrestricted for approved source of supply.  A Request for Proposal (RFP), SPE4A7-15-R-1868, issued to establish a Definite Quantity Firm Fixed Price type contract; on NSN 1615-01-112-5879, Shaft, Rotor, Transmission for 4 each.  Item is not Critical Application nor is commercial item.  Export Controlled does apply.  Item is Army Critical/Flight Safety (ACSI) as of 04/16/2015.  Item is in accordance with Basic DWG NR 77272 145D1301 NR "R" dtd 12/21/2012, pn: 145D1301-3 requirements and IAW Provision 52.217-9023 acquisition is restricted to material manufactured by the sources listed on the source control drawing. 


 The need arrival date (NAD) is 03/02/2016; with an estimated award date (EAD) on 07/31/2015.  Based on the NAD-EAD-FAT the time yields a number less than 60 days, therefore, the acquisition specialist utilized a 25% reduction of the historical PLT (239) as the delivery objective for 180 days for production of 4 each.  Contractor First Article requirement delivery at 120 DARO, additional 45 days for government testing & evaluation and request 180 days delivery for production on 4 units for 345 days total.  Delivery requested at FOB Point @ Destination with Inspection & Acceptance at Origin. Reverse Auction is considered for final proposal revision and price validity; IAW DLAD Provision 52.215-9023 /L15C11.  Progress Payments are not authorized for this purchase.

Update #1 ·

Added: Apr 16, 2015 4:17 pm "A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP  <https://www.dibbs.bsm.dla.mil/RFP>    on the same issue date cited in the solicitation.  Choose the RFP you wish to download.  Solicitations are in portable document format (PDF).  To download and view these documents you will need the latest version of Adobe Arobat Reader.  This software is available free at http://www.adobe.com <http://www.adobe.com> .  A paper copy of the solicitation will not be available to requestors.  The RFP-solicitation issue date 05/02/2015 and respond due date 06/02/2015.

 This requirement was authorized by purchase request 0057969396 and solicit as Unrestricted for approved source of supply.  A Request for Proposal (RFP), SPE4A7-15-R-1868, issued to establish a Definite Quantity Firm Fixed Price type contract; on NSN 1615-01-112-5879, Shaft, Rotor, Transmission for 4 each.  Item is not Critical Application nor is commercial item.  Export Controlled does apply.  Item is Army Critical/Flight Safety (ACSI) as of 04/16/2015.  Item is in accordance with Basic DWG NR 77272 145D1301 NR "R" dtd 12/21/2012, pn: 145D1301-3 requirements and IAW Provision 52.217-9023 acquisition is restricted to material manufactured by the sources listed on the source control drawing. 


 The need arrival date (NAD) is 03/02/2016; with an estimated award date (EAD) on 07/31/2015.  Based on the NAD-EAD-FAT the time yields a number less than 60 days, therefore, the acquisition specialist utilized a 25% reduction of the historical PLT (239) as the delivery objective for 180 days for production of 4 each.  Government First Article requirement delivery at 120 DARO, additional 45 days for government testing & evaluation and request 180 days delivery for production on 4 units for 345 days total.  Delivery requested at FOB Point @ Destination with Inspection & Acceptance at Origin. Reverse Auction is considered for final proposal revision and price validity; IAW DLAD Provision 52.215-9023 /L15C11.  Progress Payments are not authorized for this purchase.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Shaft, rotor, transmi Latest Award Notice
Shaft, rotor, transmission This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity