Shaft, rotor, transmission
Awarded Award Notice Posted
- Solicitation number
- SPE4A715R1868
- Agency
- Aviation Defense Logistics Agency, Department of Defense
- Awarded
- to Heligear Acquisition CO.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- SPE4A716C0022 Federal contract award
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- PSC
- Not on record
- Place of performance
- Dla Aviation 8000 Jefferson Davis Hwy Richmond, Virginia 23297, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Apr 16, 2015 4:17 pm
Modified: Apr 17, 2015 11:16 amTrack Changes
"A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP <https://www.dibbs.bsm.dla.mil/RFP> on the same issue date cited in the solicitation. Choose the RFP you wish to download. Solicitations are in portable document format (PDF). To download and view these documents you will need the latest version of Adobe Arobat Reader. This software is available free at http://www.adobe.com <http://www.adobe.com> . A paper copy of the solicitation will not be available to requestors. The RFP-solicitation issue date 05/01/2015 and respond due date 06/02/2015.
This requirement was authorized by purchase request 0057969396 and solicit as Unrestricted for approved source of supply. A Request for Proposal (RFP), SPE4A7-15-R-1868, issued to establish a Definite Quantity Firm Fixed Price type contract; on NSN 1615-01-112-5879, Shaft, Rotor, Transmission for 4 each. Item is not Critical Application nor is commercial item. Export Controlled does apply. Item is Army Critical/Flight Safety (ACSI) as of 04/16/2015. Item is in accordance with Basic DWG NR 77272 145D1301 NR "R" dtd 12/21/2012, pn: 145D1301-3 requirements and IAW Provision 52.217-9023 acquisition is restricted to material manufactured by the sources listed on the source control drawing.
The need arrival date (NAD) is 03/02/2016; with an estimated award date (EAD) on 07/31/2015. Based on the NAD-EAD-FAT the time yields a number less than 60 days, therefore, the acquisition specialist utilized a 25% reduction of the historical PLT (239) as the delivery objective for 180 days for production of 4 each. Contractor First Article requirement delivery at 120 DARO, additional 45 days for government testing & evaluation and request 180 days delivery for production on 4 units for 345 days total. Delivery requested at FOB Point @ Destination with Inspection & Acceptance at Origin. Reverse Auction is considered for final proposal revision and price validity; IAW DLAD Provision 52.215-9023 /L15C11. Progress Payments are not authorized for this purchase.
Update #1 ·
Added: Apr 16, 2015 4:17 pm
"A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP <https://www.dibbs.bsm.dla.mil/RFP> on the same issue date cited in the solicitation. Choose the RFP you wish to download. Solicitations are in portable document format (PDF). To download and view these documents you will need the latest version of Adobe Arobat Reader. This software is available free at http://www.adobe.com <http://www.adobe.com> . A paper copy of the solicitation will not be available to requestors. The RFP-solicitation issue date 05/02/2015 and respond due date 06/02/2015.
This requirement was authorized by purchase request 0057969396 and solicit as Unrestricted for approved source of supply. A Request for Proposal (RFP), SPE4A7-15-R-1868, issued to establish a Definite Quantity Firm Fixed Price type contract; on NSN 1615-01-112-5879, Shaft, Rotor, Transmission for 4 each. Item is not Critical Application nor is commercial item. Export Controlled does apply. Item is Army Critical/Flight Safety (ACSI) as of 04/16/2015. Item is in accordance with Basic DWG NR 77272 145D1301 NR "R" dtd 12/21/2012, pn: 145D1301-3 requirements and IAW Provision 52.217-9023 acquisition is restricted to material manufactured by the sources listed on the source control drawing.
The need arrival date (NAD) is 03/02/2016; with an estimated award date (EAD) on 07/31/2015. Based on the NAD-EAD-FAT the time yields a number less than 60 days, therefore, the acquisition specialist utilized a 25% reduction of the historical PLT (239) as the delivery objective for 180 days for production of 4 each. Government First Article requirement delivery at 120 DARO, additional 45 days for government testing & evaluation and request 180 days delivery for production on 4 units for 345 days total. Delivery requested at FOB Point @ Destination with Inspection & Acceptance at Origin. Reverse Auction is considered for final proposal revision and price validity; IAW DLAD Provision 52.215-9023 /L15C11. Progress Payments are not authorized for this purchase.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Shaft, rotor, transmi | Award Notice | |
| Shaft, rotor, transmission | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity