Sewage treatment plant bypass line installation, camp mujuk, pohang, south korea
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W90VN925RA085
- Agency
-
Army Contracting Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Army Contracting Command is seeking contractors for a sewage treatment plant bypass line installation project at Camp Mujuk in Pohang, South Korea. This procurement falls under the NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z2NE for Repair or Alteration of Water Supply Facilities, indicating the work involves specialized infrastructure construction and water facility modifications. The solicitation was posted on July 14, 2025, with responses due by August 6, 2025, providing contractors with approximately three weeks to prepare their proposals. For detailed requirements, evaluation criteria, and additional specifications, interested parties must login to the PIEE system at https://piee.eb.mil and search for solicitation number W90VN925RA085. The tight timeline suggests this is likely an urgent infrastructure repair or upgrade project requiring immediate attention.
This solicitation does not utilize any set-aside designations, making it open to all qualified contractors regardless of small business status or socioeconomic categories. The work will be performed at Camp Mujuk, a military installation located in Pohang, South Korea, which may require contractors to have experience with overseas military construction projects and compliance with Status of Forces Agreement requirements. No specific contract values, quantities, or performance timelines are provided in the basic solicitation notice, with these critical details presumably available through the PIEE system portal. The nature of the work suggests this is a specialized construction project that will require contractors with expertise in sewage treatment systems and military facility infrastructure. Given the international location and military setting, contractors will likely need appropriate security clearances and logistical capabilities to support work at an overseas military installation.
Notice text
Login at https://piee.eb.mil and search for 'W90VN925RA085' to obtain more details.*
Notice history
| Notice | Type | Posted |
|---|---|---|
| Sewage treatment plant bypass line installation, camp mujuk, pohang, south korea | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Medical Repair and Renewal (MRR) Korea | Engineering Support Center Huntsville | No set-aside | |
| ICD-705 Controlled Spaces Modernization and Sustainment Program - (Progressive Design-build (PDB) Other Transaction Agreement (OTA) | ENDIST Far East | No set-aside | |
| PMSC for potable and waste water treatment | Department of State | No set-aside | |
| Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades | Franchise Acquisition Servies | Total Small Business | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity