Server Rack Replacement and Cable Management

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
F1P3XP4178AW01
Agency
Air Combat Command Air Force, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541519 Other Computer Related Services
PSC
7B22 It And Telecom - Compute: Servers (Hardware And Perpetual License Software)
Place of performance
Tucson, Arizona 85708, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The 355th Communications Squadron of the Department of the Air Force Air Combat Command is seeking a contractor to replace several server racks and perform cable management/clean-up services at Davis-Monthan Air Force Base. The contractor will be responsible for providing all required transportation, personnel, equipment, tools, parts, and labor to replace 11 server racks and organize the cable connections within those racks. A site survey must be conducted prior to purchasing equipment to ensure proper identification of racks and cables. Key tasks include replacing 42U data center cabinets, organizing cable connections, properly labeling equipment, and providing documentation such as topology and rack elevation diagrams.

This is an unrestricted contract opportunity with no set-aside designation. The contract will be awarded based on the contractor's ability to meet the stated requirements, including compliance with DMAFB security protocols, work during specified business hours, and providing quality control over the entire project. After installation, the contractor must perform operational checks, provide a 72-hour burn-in period, and be available for 30 days of onsite support. No information was provided regarding potential incumbents, award values, or budget ranges.

Notice text

The 355th Communications Squadron is looking to replace several server racks and have cable management/clean-up services performed in the same racks that are being replaced. The Contractor shall provide all required transportation, personnel, equipment, tools, parts, labor, appropriate supervision, and management needed to accomplish the work requested. A site survey shall be conducted prior to final purchase of necessary equipment to ensure all racks and fiber optic cable for replacement are properly identified and any concerns with facility or overall install are to be addressed.  

Attachments

Files attached to this notice, newest first
File Type Posted
Building 5010 Server Rack Replacement and Cable Management.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Server Rack Replacement and Cable Management Latest solicitation Solicitation
Server Rack Replacement and Cable Management This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity