Septic Holding Tank

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912ES24Q0081
Agency
ENDIST St Paul US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238910 Site Preparation Contractors
PSC
5430 Storage Tanks
Place of performance
Valley City, North Dakota 58072, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE) is seeking bids for the installation of a new septic holding tank at the Mel Rieman Recreation Area Visitor Center in Valley City, North Dakota. The contract requires the provision of a precast concrete septic holding tank with a minimum capacity of 5,000 gallons, including anti-buoyancy collars and waterproofing. USACE will prepare the existing pit in advance, and the contractor must provide the tank, all necessary parts, labor, materials, transportation, and equipment to transport, install, assemble, and seal the tank system. Quotes are due by 2:00 PM on May 22, 2024 and must be submitted electronically. This is a firm-fixed price contract with award to be made to one offeror.

The procurement is set aside for small business concerns. The work must be completed by August 30, 2024, with no interruption to the sewer system between June 24 and July 7, 2024. The place of performance is Valley City, ND 58072, USA. There is no information provided about potential incumbents or current contractors, and the solicitation notice does not include any details about award values or budget ranges.

Notice text

The US Army Corps of Engineers (USACE) seeks bids for a septic holding tank for the Visitors Center of the Mel Rieman Recreation Area, Ashtabula Lake, Valley City, ND. The current holding tank is the aeration tank of the decommissioned Sewage Treatment System (STS). The pit for the new tank will be the aeration tank of the STS. USACE site staff will prepare the new pit in advance. This will include removing the aeration tank covers, cover frame, and internal piping. USACE will fill the bottom of the pit with appropriate bedding prior to delivery of the tank. USACE will consider bids for a two-tank system in the interest of fitting a 5,000-gallon system into the existing STS aeration tank pit.

The Contractor must provide the tank and all necessary parts, labor, materials, transportation, and equipment necessary to transport, install, furnish, assemble, and seal a precast septic holding tank system. Contractor will assemble and apply sealants per the manufacturer’s recommendations.

The ground around the tank system pit can be saturated. Tank(s) must include an anti-buoyancy collar around the bottom of the tank per ASTM C1227.

This supply contract does not include connection of the tank(s) to the existing sewer line. Any two-tank system will require the contractor to connect the tanks to each other.

Attachments

Files attached to this notice, newest first
File Type Posted
W912ES24Q0081-Released.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Septic Holding Tank Award Award Notice
Septic Holding Tank This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity