Selma Alabama Flood Risk Management and Bank Stabilization Project

Closed Pre-Solicitation Posted

Solicitation number
W9127826RA105
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Selma, AL 36702

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Mobile District, intends to solicit a design-build contract for flood risk management and bank stabilization along the Alabama River in downtown Selma, Alabama, with a response deadline of September 2, 2026. The scope encompasses approximately 1,000 linear feet of soldier-pile wall construction to a top elevation of 100-ft NAVD88, a secondary retaining wall to 110-ft NAVD88, and rip-rap protection at the wall toe to 90-ft NAVD88. No set-aside is anticipated. Work is performed in Selma, Alabama. The procurement is coded to NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Z2KZ (Repair Or Alteration Of Other Conservation And Development Facilities).

Notice text

The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office Tuscaloosa, Alabama, Tuscaloosa County 35404 · NAICS 236220 ENDIST Mobile No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors