Second and First Units, FY23 Sediment Removal, Punxsutawney Local Flood Protection Project, Mahoning Creek, Punxsutawney, Jefferson County, Pennsylvania

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W911WN23B8019
Agency
Responses due
Set-aside
HUBZone Sole Source

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Pittsburgh District, is seeking to procure channel maintenance services along approximately 11,000 linear feet of the Mahoning Creek in Punxsutawney, Jefferson County, Pennsylvania under solicitation number W911WN23B8019. The services include removing approximately 6,000 cubic yards of sediment deposits, sampling and disposing of sediment in accordance with regulations, and restoring the channel to its original conditions. The contract must be completed within 365 calendar days of notice to proceed. Proposals were due by November 9, 2023.

The solicitation is set aside for the HUBZone program. Key details include removing 6,000 cubic yards of sediment deposits from 11,000 linear feet of the Mahoning Creek located between Pittsburgh-Buffalo Highway (US119) and the terminus of the project in Punxsutawney, Pennsylvania, with access from two existing ramp locations. Three contractors submitted bids by the November 9th deadline, with Earthmovers Unlimited Inc. providing the lowest bid of $597,213.00.

Notice text

3 versions

Update #3 · Latest ·

Second and First Units, FY23 Sediment Removal, Punxsutawney Local Flood Protection Project, Mahoning Creek, Punxsutawney, Jefferson County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves channel maintenance work within the River boundaries of Mahoning Creek, in the Local Flood Protection Project, in Punxsutawney, Jefferson County, Pennsylvania. More specifically, the work area is located between Pittsburgh-Buffalo Highway (US119) downstream to the terminus of the project. This project extends past the Punxsutawney Borough Sewage Plant. The major features of the requirements are identified below: The overall contract scope of work consists of furnishing all supplies, materials, equipment and labor as necessary to remove approximately 6,000 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions in accordance with the Drawings and Specifications. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations including sampling and sediment control. This work will occur over a length of approximately 11,000 linear feet of river channel. The work area can be accessed from two (2) existing ramp locations at South Gilpin Street and Mulberry Alley. The work shall be completed within 365 calendar days after receipt of the written Notice to Proceed. **NOTE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

11/9/23 - BID OPENING HELD.

Update #2 ·

Second and First Units, FY23 Sediment Removal, Punxsutawney Local Flood Protection Project, Mahoning Creek, Punxsutawney, Jefferson County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves channel maintenance work within the River boundaries of Mahoning Creek, in the Local Flood Protection Project, in Punxsutawney, Jefferson County, Pennsylvania. More specifically, the work area is located between Pittsburgh-Buffalo Highway (US119) downstream to the terminus of the project. This project extends past the Punxsutawney Borough Sewage Plant. The major features of the requirements are identified below: The overall contract scope of work consists of furnishing all supplies, materials, equipment and labor as necessary to remove approximately 6,000 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions in accordance with the Drawings and Specifications. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations including sampling and sediment control. This work will occur over a length of approximately 11,000 linear feet of river channel. The work area can be accessed from two (2) existing ramp locations at South Gilpin Street and Mulberry Alley. The work shall be completed within 365 calendar days after receipt of the written Notice to Proceed. **NOTE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

Update #1 ·

Second and First Units, FY23 Sediment Removal, Punxsutawney Local Flood Protection Project, Mahoning Creek, Punxsutawney, Jefferson County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves channel maintenance work within the River boundaries of Mahoning Creek, in the Local Flood Protection Project, in Punxsutawney, Jefferson County, Pennsylvania. More specifically, the work area is located between Pittsburgh-Buffalo Highway (US119) downstream to the terminus of the project. This project extends past the Punxsutawney Borough Sewage Plant. The major features of the requirements are identified below: The overall contract scope of work consists of furnishing all supplies, materials, equipment and labor as necessary to remove approximately 6,000 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions in accordance with the Drawings and Specifications. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations including sampling and sediment control. This work will occur over a length of approximately 11,000 linear feet of river channel. The work area can be accessed from two (2) existing ramp locations at South Gilpin Street and Mulberry Alley. The work shall be completed within 365 calendar days after receipt of the written Notice to Proceed. **NOTE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

SITE VISIT HELD.

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation Borough of Millvale, City of Pittsburgh, Allegheny County, Pennsylvania 15223 · NAICS 237990 ENDIST Pittsburgh Total Small Business
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation Canonsburg-Houston, Strabane, Washington County, Pennsylvania 15317 · NAICS 237990 ENDIST Pittsburgh Total Small Business
Pittsburgh facility 079 MEP parking lot erosion control 7100 Leech Farm Rd, Pittsburgh, PA 15206 15206 ENDIST Philadelphia No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors