Saylorville Lake; Big Creek, Diversion Dam, Polk County, Iowa - Diversion Dam Control Structure Replacement

Award Notice Posted

Solicitation number
W912EK14R0005
Agency
Awarded
to Jensen Construction Company
Set-aside
No set-aside

Opportunity facts

Contract number
W912EK-14-C-0057 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

AWARD: This is a firm fixed price construction contract. The solicitation was competed as unrestricted.

The work shall include, but is not limited to, boring through a section of a concrete filled corrugated metal pipe under water, construction of a sheet pile cofferdam and dew atering, removal of existing gate structure, sluice gate with manual and electrically operated gate operator, bulkhead gate, gratings, construction of a new reinforced concrete control structure which houses a sluice gate and bulkhead gate,construction of a three-girder concrete deck bridge, installation of riprap, removal and replacement of asphalt bike path and all associated incidental work.

Update #1 ·

The work shall include, but is not limited to, boring through a section of a concrete filled corrugated metal pipe under water, construction of a sheet pile cofferdam and dewatering, removal of existing gate structure, sluice gate with manual and electrically operated gate operator, bulkhead gate, gratings, construction of a new reinforced concrete control structure which houses a sluice gate and bulkhead gate, construction of a three-girder concrete deck bridge, installation of riprap, removal and replacement of asphalt bike path and all associated incidental work.

NAICS Code: 237990
Completion Days: 365 consecutive calendar days
Estimated Range: $1,000,000 - $5,000,000
Unrestricted Procurement

The construction contract will be awarded using competitive negotiations procedures for achieving the best value to the Government through the Source Selection Process. The Source Selection will be conducted in accordance with procedures prescribed in FAR Part 15. The criteria used to determine best value to the Government will be in the form of a Technical Proposal and Price Proposal which will be outlined in the solicitation as follows:
Method and Work Plan for Mobilization and Site Setup. Method and Work Plan for Constructing, Delivering, Placing and Dewatering a Cofferdam. Method and Work Plan for Constructing, Delivering, and Placing a New Control Structure. Method and Work Plan for Constructing, Delivering, and Placing a New Bridge. Emergency Response Plan. Detailed Work Plan, Network Analysis, and Schedule Bar Chart for Entire Work Period. Major Plant and Equipment. Key Personnel Experience. Prime Contractor and Sub-Contractor Experience. Organization Chart. Safety Plan. Past Performance. Small Business Participation Plan. Price Proposal and Subcontracting Plan. The evaluation factors, other than price, when combined, are significantly more important than price.

It is anticipated that the plans and specifications for this project will be available on www.fbo.gov on or about 9 January 2014. Any contractor wanting the plans and specifications must download them from this website.