SAM? SAS? SAC basler ECS 2100 exciter retrofit
Closed Pre-Solicitation Posted
- Solicitation number
- W9127826RA071
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers intends to solicit for upgrade and retrofit of Basler ECS-2100 excitation control systems at four hydropower sites across the Savannah, Mobile, and Charleston Districts, with a sources sought response deadline of May 26, 2026. The scope has been amended to include full replacement of Prime Power/Siemens EX-1 excitation systems at select hydropower facilities.
The procurement encompasses engineering, design, manufacturing, factory testing, delivery, demolition, installation, integration, commissioning, training, and documentation. The project aims to replace obsolete digital control hardware, improve reliability and maintainability, enhance diagnostic capability, and standardize excitation technology across multiple powerhouses. Place of performance spans four sites across three USACE districts: Savannah, Mobile, and Charleston.
The work aligns with NAICS 237130 (Power and Communication Line and Related Structures Construction) and PSC Z2MD (Repair or Alteration of EPG Facilities – Hydro). No set-aside is anticipated.
Detailed scope, technical requirements, and submission instructions are contained in the attached Sources Sought document. Interested vendors should reference the Sources Sought notice for specific capability and qualification expectations.
Notice text
2 versions
Update #2 · Latest ·
The U.S. Army Corps of Engineers (USACE) intends to upgrade and retrofit Basler ECS-2100 excitation control systems at four hydropower sites across the Savannah, Mobile, and Charleston Districts. The project includes engineering, design, manufacturing, factory testing, delivery, demolition, installation, integration, commissioning, training, and documentation to replace obsolete digital control hardware, improve reliability, maintainability, and diagnostic capability, and standardize excitation technology across multiple powerhouses.For detailed information regarding the scope of work, requirements, and submission instructions, please refer to the attached Sources Sought document.****UPDATE**** This Sources Sought notice has been amended to include both the retrofit of Basler ECS-2100 excitation systems and the full replacement of Prime Power/Siemens EX-1 excitation systems at select hydropower facilities.
Update #1 ·
The U.S. Army Corps of Engineers (USACE) intends to upgrade and retrofit Basler ECS-2100 excitation control systems at four hydropower sites across the Savannah, Mobile, and Charleston Districts. The project includes engineering, design, manufacturing, factory testing, delivery, demolition, installation, integration, commissioning, training, and documentation to replace obsolete digital control hardware, improve reliability, maintainability, and diagnostic capability, and standardize excitation technology across multiple powerhouses.For detailed information regarding the scope of work, requirements, and submission instructions, please refer to the attached Sources Sought document.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Webbers Falls Excitation System Replacements | ENDIST Tulsa | No set-aside | |
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside | |
| High Voltage Power Supplies (HVPS) for Electronic Fish Barriers | ENDIST Chicago | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity