Safety shower
Closed Solicitation Posted
- Solicitation number
- W911S226U4017
- Agency
-
MICC Fort Drum
Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332913 Plumbing Fixture Fitting and Trim Manufacturing
- PSC
- 4240 Safety And Rescue Equipment
- Place of performance
- McAlester Army Ammunition Plant 1 C-Tree Road, Building 6 McAlester, OK 74501 74501
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum seeks a pneumatic, skid-mounted safety shower and eyewash station (ATS EcoTower C1D2/26 or equal) with proposals due August 18. The procurement is a Total Small Business set-aside.
Place of performance is McAlester, Oklahoma (1 C Tree Road, Building 4). The equipment must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment and certified for Class I, Division 2 hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present. The unit must include an integrated, heavy-duty insulated water storage tank with minimum capacity of 325 gallons to guarantee a minimum of 15 minutes of continuous tepid water flow. An integrated electrical immersion heating system (minimum 1,200 Watts) must actively maintain stored water temperatures above the ANSI-mandated minimum of 60 degrees Fahrenheit. A self-regulating heat trace system must protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0 degrees Fahrenheit. The unit must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water, ensuring spark-free operation in C1D2 zones and safe function during electrical outages via pneumatic backup, with operational pressure support from 60 to 120 pounds per square inch. The NAICS code is 332913, Plumbing Fixture Fitting and Trim Manufacturing, and the PSC code is 4240, Safety and Rescue Equipment.
Notice text
ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60 F (15.6 C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0 F (-17.8 C) ________________________________________ Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Boiler, Feedwater tank, Pump skid | MICC Fort Drum | Total Small Business | |
| Electrically Heated Tank | MICC Fort Drum | Total Small Business | |
| Blanket Purchase Agreement Porta John Services | MICC Fort Drum | Total Small Business | |
| Camp Lejeune Shower Services | Mission and Installation Contracting Command | Total Small Business | |
| Swivel shackle assembly | MICC Fort Drum | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity