Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements
Closed Solicitation Posted
- Solicitation number
- W9123825BA002
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1LZ Construction Of Parking Facilities
- Place of performance
- Sacramento, CA
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Sacramento is seeking design-bid-build construction services for levee improvements at the Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California. The project aims to reduce levee failure risks along approximately 1,000 feet of the Sacramento River by implementing erosion protection measures, including rock bank protection, a 3.5-foot-thick lens of launchable Graded Stone C, and in-stream woody material for fisheries habitat. Work will be completed entirely by barge and involves multiple components such as demolition, stone placement, and bank protection strategies. The solicitation (W9123825BA002) was posted on March 20, 2025, with proposals due by April 24, 2025. Potential bidders attended a pre-proposal site visit on April 3, 2025, which was documented through an official sign-in sheet.
The contract is set aside as a total small business opportunity, categorized under NAICS 237990 for Other Heavy and Civil Engineering Construction. Potential contractors include Cecil Nordic JV, Cam-Dutra JV-II LLC, Sierra Mountain Construction Inc, and Aventus NV Inc, who have already submitted initial bids. The project involves eight primary line items with estimated costs varying between bidders, including mobilization, temporary storm water pollution control, clearing and grubbing, demolition, stone placement, and grass seeding. Each initial bidder submitted a 20% bid bond, indicating their serious intent to compete for the contract. The place of performance is Sacramento, California, with work to be executed under the Department of the Army Corps of Engineers Engineering District Sacramento, and the contract will be administered by the KO Contracting Division.
Notice text
6 versions
Update #6 · Latest ·
See attached Bid Abstract
AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
Update #5 ·
AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
Update #4 ·
UPDATE 3 APRIL 2025 - uploaded Pre-Proposal Site Visit Sign-In Sheet.
UPDATE 2 APRIL 2025 - updated SAM to show total small business set-aside.
AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
Update #3 ·
UPDATE 2 APRIL 2025 - updated SAM to show total small business set-aside.
AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
Update #2 ·
AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
Update #1 ·
Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
Files
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract - SRE C5.pdf | ||
| Pre-Proposal Site Visit Sign-in sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| USACE SPK DBB Construction - Sacramento River Erosion Contract 5 Pioneer Bridge Levee Improvements- Sacramento, California | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside | |
| $465M SPK small business MATOC for DBB/DB construction | ENDIST Sacramento | Total Small Business | |
| FY27 San Francisco District Maintenance Dredging | ENDIST San Francisco | No set-aside | |
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 1-2025. Specification No. OM25135 | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity