Rudder, aircraft, in repair/modification of
Open Solicitation Posted
- Solicitation number
- N0038326RHA64
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- PSC
- 1560 Airframe Structural Components
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Supply Systems Command seeks repair and modification of aircraft rudders, with proposals due November 20. No set-aside applies.
The NAICS code is 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing; PSC is 1560, Airframe Structural Components. The procurement includes a Repair Turnaround Time (RTAT) requirement measured from physical receipt of the asset in F-condition at the contractor facility to asset acceptance under contract terms. The solicitation incorporates multiple FAR clauses and deviations governing Buy American compliance, quality requirements, integrity of unit pricing, veterans opportunity, workers with disabilities opportunity, safeguarding sensitive conventional arms and ammunition, transportation of supplies by sea, value engineering, and security prohibitions and exclusions. The contract will use the Workflow Pro (WFP) MOD Assist module for modifications and DFAS wide area workflow payment instructions tied to invoice and receiving report combo documentation processed through DCMA. Payment administration routes through Naval Supply Systems Command (N00383). The clause on "Only One Offer" (Deviation 2026-O0048) is included, signaling potential sole-source or limited-competition posture, though the solicitation record does not explicitly state a sole-source intent or set-aside category.
Notice text
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x||||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo) Type||DFAS|N00383|DCMA|DCMA|See Schedule|Source|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
VALUE ENGINEERING (JUN 2020)|3||||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||
SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
ROYALTY INFORMATION (APR 1984)|1||
TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x|
ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||
This requirement is for the repair of the items herein thissolicitation.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: ## ____ days after receipt of asset.
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR
SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE"CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.
Early and incremental deliveries accepted and preferred.
\
1. SCOPE
ITEM MUST BE REPAIR/OVERHAULED IAW STATEMENT OF WORK DATED AND SIGNED
04OCT2024 FOR E-2/C-2 RUDDER ASSEMBLY, OUTBOARD, LOWER (LH & RH)
THIS IS A HARDCOPY SOW AND CDRLS. HARDCOPY SOW AND CDRL CAN BE OBTAINED
FROM N231 SOURCE DEVELOPMENT.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS - NOT APPLICABLE
4. QUALITY ASSURANCE
First Article Inspection (FAI) of the first item repaired is required. DCMA
and FST shall be present for FAI. The inspection will be performed at the
contractor?s facility. The complete cleaning, inspection, assembly and testing
of the part shall be verified to ensure compliance with all repair
publications. See Testing Requirements within HARDCOPY SOW.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Rudder, aircraft, in repair/modification of | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Control, rudder, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| NRP, spoiler assy -, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Spoiler, wing, aircra, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Spoiler, wing, aircra, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Steering unit, aircr, in repair/modification of | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity